TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
1 SYSTEM and MODULE DESIGN Elements and Definitions.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Effective Methods for Software and Systems Integration
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
1 1. Some recent views ( ) 2 Linac tunnel
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
For more info:
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
GLM 22/10/2002 E.Sánchez-Corral, L. Symons / ST D. Mathieson /AS 1 AOC Project Progress Report Organization Scope, Strategy, Objectives Status: – specification,
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Installation of an Instrument on a CERN machine
Software and Systems Integration
LINAC4 50 MeV phase BIS STATUS
The ILC Control Work Packages
LAAWG Status Report – 15th May 2007
Quality Assurance applied to Accelerator Safety
SPS CC: Final plan for interlocking of crab cavities in SPS
EP Experiments safety validation process Safety Permits
BU IS GIG Chemical, Oil & Gas
Workshop on Accelerator Operations
Electron Beam Systems ETC and Methodology
TS2 PSS Architecture, Concepts of Operations and Interfaces
PSS verification and validation
Machine Protection PLC Based System Verification and Validation Plan
Atefeh Sadeghzadeh Control engineer – Target safety and control
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Access Control for CERN Experimental Areas
Powering and Safety day Underground access during powering tests
Presentation transcript:

TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE

2 Agenda Project overview Architecture Organisation Challenges Conclusion

3 LHC sites access LHC buildings access LHC experimental services areas access * ACCESSIBLE during beam operation the LHC accelerator and experiment Access Service Access Tunnel Access Experiment NON ACCESSIBLE during beam operation

4 Scope LHC Access Control System LACS Off-the-shelf Access Equipement LHC Access Safety System LASS Interlock System Beam => No Access Access => No Beam Integrated concept for LHC Machine & Experiments to protect people against the LHC radiation hazards.

5 LHC Access Control System Goals: –Manage access rights –Identify user –Verify authorization –Automatic or remote access control Status: –Contract running since September 04 –System engineering completed –Factory Acceptance Test (Cegelec Marseille) May 05 –Site acceptance of the pilot installation “LHC 0” - June 2005 –Organisation of the LHC 8 installation – October 2005 –Organisation of the LHC tunnel doors/grids installation Done by TS/IC

6 LHC Access Safety System Goals: –Protect personnel during Beam operation nobody inside - Stop LHC if a door is forced –Allow Access operation when safety conditions are met No radiation hazards (LHC beam, RF). –Distributed, highly reliable interlock system Strictly designed according to the prescription of the IEC To be demonstrated to the French Nuclear Authority INB Status: –HW and SW Architecture prototyping (Siemens Safety Matrix). –Good progress on the : Project documentation Cabling Safety studies. –Identification of the LHC machine elements that will be interlocked is completed –Tender for the system realisation, installation and commissioning.

7 Project Organisation

8 LHC Access SafetyLHC Access Control ACCESS SAFETY ACCESS CONTROL

9 Operational Dosimeter Integration N. Rama

10

11 Man Machine Interface M. Munoz, L. Hammouti, G. Roy

12

13 LHC Elements interlocked

14 Integration & InstallationSafetyLASSLACS Access Safety Specification Access Safety Architecture Design INB AIWG Safety Plan LHC Sectorisation & Integration Review Access Control Tendering Preliminary Risk Analysis Contract Access Safety realisation Access Control Specification LHC Access System Principles (AIWG) Access Pilot Installation LHC0 Safety Function Specification Preliminary Safety Study (Architecture) Cabling Definition Access Control Design Access Safety Tendering Contract Installation preparation

15 Installation phases InstallationHW commissioningMachine checkoutBeam operation Surface Access Control Installation + CCC + Wherever possible Underground Access Control Limit the constraint of transport Access Safety validation LHC Access Commissioned INB Tests Access Safety Provisional installation RF Tests Injection Tests

16 Open issue/Challenges Experiments –Further investigation required Pilot installation: –Integration of the numerous technologies involved –Validation of the system by the users Safety validation of the global architecture –To ensure that the safety requirements (INB) are met Finish the integration (1,2,3,4,5,6) and organise the installation Cabling –Strategy and LHC point 8 are OK, –Specify the cabling architecture for the remaining LHC points Review and Optimise the full CERN Access « process » –Training, authorizations

17 Conclusion Architecture of the LHC Access System is now designed, and is checked to verify that it meets the safety requirements of the LHC operation and the IEC A pilot installation will be tested in the summer 2005 to validate the concept with the users as well as the integration and performance of the numerous sub-systems. The specification of the LHC Access Safety side is completed, the hardware and software architecture has been studied, progressing on the prototype. A call for tender has been launched to cope with the LASS programming and installation. The identification of the machine elements that will be interlocked is completed. Despite the difficulty encountered for the system specification, for the time being: –In line with LHC planning

18 Thanks to the LHC Access project Collaborators: T. Pettersson L. Scibile J.-F. Juget S. Di Luca T. Riesco N. Rama S. Grau M. Munoz M. Boffard E. Sanchez-Corral Mena T. Ladzinski G. Smith A. Day D. Swoboda F. Rodriguez Mateos G. Roy With the help of : CEGELEC – SCHNEIDER - SIEMENS

19 Access Equipment Integration S. Di Luca/ EDMS