Good Samaritan Medical Center High Density Concrete Placement.

Slides:



Advertisements
Similar presentations
Lightweight Forming System and Roofs for Concrete Floors.
Advertisements

Cylinder Blocks.
FORMWORK Prof Awad S. Hanna.
SHOTCRETING K.V.SUBBA RAO.
Fabricating a Watertight Precast Concrete Septic Tank
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Installation of New CHP system at the Old Aberdeen Campus.
Concrete & Asphalt. Concrete –Batching – process of proportioning cement, water, aggregates and additives prior to mixing concrete –Concrete specs usually.
CONCRETE MIX-DESIGN ACI
SHEAR IN BEAMS. SHEAR IN BEAMS Example (4.1): A rectangular beam has the dimensions shown in Figure 4.12.a and is loaded with a 40 ton concentrated.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Tel: ​ , ​ Fax: Lead Plates for Radiation Shielding & X-Ray.
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Masonry Details.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Concrete Construction
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
LESSON TOPIC 1.2 SHORING.
Placing Quality Concrete
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
ASSIGNMENT Begin on page 197 “The Foundation”.
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
Introduction to a pit installation
RADARTRON by SCALE-TRON. WHY DO WE NEED MOISTURE MEASUREMENT? Wet cast – measurement in sand corrects both sand weight and water Wet cast – measurement.
Silver Oak College Of Engineering & Technology.
Discover Engineering ENGR 096
©Teaching Resource in Design of Steel Structures IIT Madras, SERC Madras, Anna Univ., INSDAG 1 COMPOSITE FLOORS - II.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
University of Sydney – Structures CONCRETE Peter Smith 1998 Concrete Making and Testing l Unique material çMade specially for each job çHandling on job.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Joints for Diaphragm Walls
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
Leads Institute of Technology & Engineering
Concrete Repair.
Mezzanine Update.
How to Select and Optimize Abrasive Blasting Equipment
BUILDING CONSTRUCTION
WALL Barrios Laura Bigott Dairet
GLASS SOLID COLOUR.
Installation Techniques
Discover Engineering ENGR 096
UPPER FLOORS TIMBER AND CONCRETE.
GLASS CRACKLE GLAZE.
FORMWORK DR. Nabil Dmaidi.
Grout and Other Reinforcement Module
GLASS RAINBOW SPARKLE.
Introduction James W. & Frances G. McGlothlin Medical Education Center
Cast in Place 2 way Flat slabs Basically joists in both directions
GOALS For the classification of cracks in the wet and hardened concrete. To diagnose cracks in concrete structures and determine their types.
Chapter 14 Cooling System.
Concrete Structures DR. Nabil Dmaidi.
Engine Oil Changes.
Engine Oil Changes.
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
GLASS SPARKLE.
Mitre III Building McLean VA Debra Schroeder Structural Option.
Building Good Boxes ACPA Spring Short Course School
Bunker Wall Design Wall ESS
Presentation transcript:

Good Samaritan Medical Center High Density Concrete Placement

Walls Blockouts around door for borated polyethelene and lead plates Physics port Allows staff to check radiation levels in the vault before entering Sleeve through wall at 45 degrees vertical: Location was critical to prevent radiation leak

Lid shoring Wet weight of lid = over 1.6 million pounds Designed by engineer; installation checked by engineer Fireproofing of beams Before placement of lid Use of HD fireproofing to prevent damage by forming and reinforcing activities: No addit’l patching required OFI – sheet metal cap detail Allowed for fireproofing of beams before deck was placed

Test run: Checked maximum free-fall of aggregate

Placement High Density Concrete supplied by Central Concrete

Placement continued… CY placed total 4.5 CY of concrete batched in each 12 CY truck Rate of placement Started at 30 minutes per truck or more Ended at minutes per truck

Placement continued …. Central concrete quality control manager onsite: Only person allowed to add chemicals to the mix

Placement continued… Placement of high density concrete required normal size crew

Finished vault Due to high density, concrete finished with few imperfections, even with minimal vibrating Maximum deflection of the lid measured at 3/16” 12.5 hour pour 14 hour day