Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Accelerators. Electron Beam  An electron beam can be accelerated by an electric field. Monitors Mass spectrometers  Any charged particle can be accelerated.
Workshop on Special Compact and Low Consumption Magnet Design
Magnet designs for the ESRF-SR2
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
Magnet Energy Recovery Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters Workshop on Special Compact and Low Consumption.
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
W. Wuensch, rf development meeting Considerations on running normal conducting cavities cold.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Powered Magnets, DB Formation and Decelerator Alexey Vorozhtsov (JINR) International Workshop on Linear Colliders October 2010.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Fast Cycled superconducting Magnets (FCM) for PS2 WAMSDO, May 23 rd, 2008 Presented by L. Bottura on input from G. Kirby, M. Karppinen, L. Oberli, R. Maccaferri,
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
East Area Consolidation Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters 04 June 2015.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Work-packages CLIC for the Drive Beam BJ, 23 feb 2010 Beam Dyn Meeting 2/23/11Beam Dyn meeting1.
LARP Collaboration Meeting, April 19, 2007Super-Ferric Fast Cycling SPS – Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac - Motivation.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
LIUWG Davide Tommasini ALTERNATIVES FOR D1s Requirements Normal conducting (resistive) Superferric iron dominated Superconducting costheta Side.
Power Supply & Electrical Engineering for sustainable science
E. Todesco, Milano Bicocca January-February 2016 Appendix C: A digression on costs and applications in superconductivity Ezio Todesco European Organization.
Magnets Attilio Milanese Doing Business with CERN
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Energy consumption and savings potential of CLIC Philippe Lebrun CERN, Geneva, Switzerland 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Pulsed Magnet Power Supply Feasibility Study
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
CERN Large Hadron Collider
The Survey of the Power Supply Reliability at SSRF
Warm magnets for LHeC / Test Facility arcs
with operating voltage
Eucard-2 Workshop on Special Compact and Low Consumption Magnet Design for Future Linear and Circular Colliders Summary of Sessions 1 & 2 Akira Yamamoto.
Arc magnet designs Attilio Milanese 13 Oct. 2016
CHEN, Fusan KANG, Wen November 5, 2017
East Area Consolidation
Pierre-Alexandre Thonet
Why are particle accelerators so inefficient?
Compact and Low Consumption Magnet Design The DESY Experience
Synchrotron Ring Schematic
SLHC-PP kick-off meeting, CERN 9 April 2008
Novel Accelerator and Detector Systems
Power Consideration of CEPC
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator magnets Davide Tommasini

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014 Saving …what ? Materialinvestment cost, smaller coils Electricity running cost, larger coils, Sc, PMs Infrastructurespace, supports, services «Optimum» J~3-5 A/mm 2 for resistive magnets we tend associating saving to … cost we tend associating cost to … money cost/money … for what ? What is a cost if 1 t of oil? Politically, we should probably associate a higher cost for energy than the commercial one but now … let’s focus on technical matters

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014 DescriptionProCons Permanent MagnetsNo powering Compactness Reliability Fixed field (unless trimmeable) Large magnets limited in field Lower current densityPower consumption Easier cooling Reliability especially if air cooled Size Investment cost Pulsed operationPower consumptionComplexity (power converter + operation) Not always possible SuperconductingAbsence of Joule losses Enables higher field intensities Complexity (everything) Investment cost Maintenance (whole system) Dynamic behaviour Smaller magnet borePower consumption Magnet cost & size Complex beam optics design/operation Combined magnetCompactness Infrastructure cost Limited in field Field quality Power consumption Use of high saturation materials Compactness Weight Running cost Investment cost

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014

Sextupoles for AsacusaCleaning dipole for n-TOF Quadrupole for LINAC 4 QD0 for CLIC

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014 The PS East Experimental Area houses five beam lines, derived from the 24 GeV/c proton beam from the Proton Synchrotron accelerator (PS)

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014 EAST AREA CONSUMPTION AFTER CONSOLIDATION PULSED MODEDC MODE Energy in MWhPrice in kCHFEnergy in MWhPrice in kCHF Total magnet electrical consumption Water cooling electrical consumption Air cooling electrical consumption Total electricity consumption Total cooling fluid TOTAL energy cost 40 kCHF 653 kCHF TypeEstimated Price in kCHF per magnetNumber of magnets after consolidationTotal cost per family in kCHF MDX M M Q Q Q74401 Total231.3 MCHF

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014

Using superconducting magnets when you could use normal conducting ones? The conclusion of this study was that the investment cost of the two option was comparable, but the operation cost of the warm solution is twice that of the superrferric solution. A similar study performed for SIS 100 (G.Moritz, ASC 2002) arrived at a similar conclusion (yearly operation cost 2.05 ME for resistive magnets, 0.9 ME/year for superferric magnets). Electrical consumption (MW)NCSC Main Magnets7.50 RF22 Other systems33 Cryoplant01.3 Water cooling station Ventilation0.5 Climatisation0.4 Total consumption

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014 A superconducting magnet is often more complicated If the magnet is cycled, dynamic losses increase complication Let’s consider overlapping situations: Required field amplitudes within the range of 2T Required dynamic rates up to few T/s Indicative threshold for considering superconducting magnets Single units, DC operated : 100 KW Single units, AC operated : 1 MW Synchrotrons : 5-10 MW If we had to redo the CERN synchrotrons today we would: certainly do the PSB NC probably do the PS NC certainly do the SPS Sc (probably at higher energy)

Compact & Low Consumption Magnet Design Workshop Davide Tommasini Geneva, November 26-28, 2014

1.the present cost of electricity does not motivate for increasing magnet sizes to reduce the current density below 2-3 A/mm 2. 2.Where possible it is economically advantageous to use pulsed or permanent magnets. 3.The use of (expensive) high saturation materials may allow saving weight. 4.Superconducting magnets may be the definitive route to save power, weight and money when a trimmeable magnetic field is needed. Their use is limited by their complexity and accessibility. 5.When a trimmeable magnetic field is not needed, the use of permanent magnets shall be explored first, with more vigour and initiative than usually done in our field.

Thank you for your attention