Unraveling the Assessment Gordian Knot D. L. Lester, CM Savannah River Remediation, LLC.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
May 22, 2000AIHCE Orlando May 20-25, Integrated Safety Management (ISM) and Public Involvement A Tool to Build Public Trust With ES&H Management.
Ensure Vendor/Engineer of Choice Product Quality
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Implementing American Recovery and Reinvestment Act Work Safely Sam Easterling ES&H Projects Specialist ES&H B&W Y-12.
Standar Pekerjaan Lapangan: Pemahaman Memadai atas Pengendalian Intern Pertemuan 5.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Quality evaluation and improvement for Internal Audit
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
FPSC Safety, LLC ISO AUDIT.
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Auditing Standards IFTA\IRP Audit Guidance Government Auditing Standards (GAO) Generally Accepted Auditing Standards (GAAS) International Standards on.
REVIEW AND QUALITY CONTROL
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Personnel. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety The.
TVA’s Integrated Project Delivery for Nuclear Projects
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Engineering Standards Working Group Annual Meeting June 24-25, 2002 DOE Nevada Support Facility June 2002 Joe B Stringer, PE Framatome ANP DE&S.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
System-Based SH&E Management Case Study
Equity Housing Group Risk Management. 05 August 2002 © MazarsEquity Housing Group: Risk Management 2 Agenda Introduction: what is Risk Management? The.
Nuclear Industry Assessment Committee Overview ASQ Energy & Environmental Conference August 28, 2006 Ed Stankiewicz Joseph Oat Corporation NIAC Chairman.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Work Planning & Control for R&D Activities – Lessons Learned 2007 ISM Workshop – Brookhaven National Lab John Miller Manager, SRNL Safety Programs Lori.
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
1 D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 SRS EMS DOE 450.1A “Declaration of Conformance” External Audit SRNS Regulatory Integration.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
Section Topics Establish a framework for assessing risk
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Evaluation of Internal Control System. Learning Objective 1 Contrast management’s need for internal control with the auditor’s need to consider internal.
Industrial Risk Control
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Project Management Processes for a Project
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Responsible Care® Health & Safety Task Force – 06 H&S.
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
ISM at the Savannah River Site
Registration Process Environmental Management Systems Workshop Mobile, AL June 20-21, 2001 Beth Graves NC Division of Pollution Prevention and Environmental.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Click to edit Master title style Click to edit Master title 1 1 ISM Best Practices Workshop September 12, 2006 David Smith Office of Corporate Safety Analysis.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
The University of Toledo Finance and Audit Committee Meeting “Internal Audit and Compliance Update” August 12, 2013.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
DOECAP Laboratories Phased Audits U.S. Department of Defense 2016 Environmental Monitoring and Data Quality Workshop St. Louis, Missouri April 12-14, 2016.
PERFORMANCE MEASURES GROUP 4. DEFINITION PERFORMANCE MEASURES. These are regular measurements of outcomes and results which generates reliable data on.
Internal Audit Quality Assessment Guide
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
CHAPTER 3 Management Systems. Learning Objectives Describe the basic business activities and tools necessary to implement successful industrial hygiene.
Planning for Succession
NNSA Project Reviews NNSA Office of Project Analysis, Oversight, and Review (NA-APM-1.1) June 7, 2017 Dwight Henderson, Director
ISO/IEC
DOECAP Laboratories Phased Audits U. S
How to Survive an External Quality Assessment
Departmental Safety Coordinator’s Training
Internal Audit Quality Assurance and Improvement Program
Trending Requirements and Results
Presentation transcript:

Unraveling the Assessment Gordian Knot D. L. Lester, CM Savannah River Remediation, LLC

Bio 35 years Navy, commercial nuclear, and DOE site experience spanning a wide variety of management, operations, maintenance, systems engineering, testing, and ESH activities On team that pioneered the Facility Evaluation Board concept at SRS Qualified NQA-1 auditor Currently responsible for the management of Independent Assessments for SRR

Historically, How Assessing was Performed Started with large Quality Assurance presence Shifted to Self-Assessments –Replaced quality inspectors with assessors –Added independent assessments Over time, added other evaluation activities

How We Assess Ourselves QA Supplier Surveillances Facility Drills & Monitored Evolutions Facility Monitoring Management Overview Watchstander Evaluations Post Job Reviews Effectiveness Reviews Work Window Critiques Senior Supervisory Watches Emergency Preparedness Drills Fire Walkdowns Chemical Program Walkdowns Self Assessments Safety & Housekeeping Audits Management Assessments Quality Assuranc e Internal Audits Quality Assuranc e Internal Audits Behavior Based Safety Observations Behavior Based Safety Observations Facility Evaluation Boards Facility Evaluation Boards Quality Assuranc e External Audits Quality Assuranc e External Audits Subcontractor Technical Representative Reviews Subcontractor Technical Representative Reviews Performance Metrics Management Field Observations Asset Management Audits Annual Safety Appraisal Environmental Compliance Internal Audits Industrial Hygiene Internal Appraisals Surveillances Hazards Communications Audits

Assessment and Feedback Programs Process defined in site procedures –22 Functional Areas –5 separate facilities Separate manual of Performance Objectives and Criteria Quarterly evaluation of performance Annual rollup of ISM performance

What’s Wrong with this Picture? Multiple evaluations on approximately the same thing Multiple systems for documentation Difficult to monitor progress Planning / coordination obstacles Resource availability problems Inconsistency in standards / expectations Tendency to stovepipe Marginalization of overall effort Little evidence of feedback used in other assessments Little apparent use of results in future planning

The Assessment “Gordian Knot”

Cutting the Knot Establish an Assessment Baseline Determine R2A2s Eliminate Redundancies Establish a Simple Control / Feedback System Obtain Management Support Periodically Pulse Progress

Establish an Assessment Baseline SRR Baseline is the Integrated Assessment Matrix Review source documents –Contract (for SRR, Source Requirements Identification Document or S/RID place to start) –Procedures –Tech Specs –DOE Letters and Commitments Organize for efficiency Evaluate past performance Eliminate low value-added assessments

Determine Ownership Who is responsible for each assessment activity?* –Independent Assessment Organization –Quality Assurance –Program Manager –Facility Manager * May or may not assign to an assessor in plan

Eliminate Redundancies Worked with Determining Ownership Multiple requirements for assessment, perform together Closely related topics Team Assessments Vertical and Horizontal assessments Assessments in multiple facilities

Establish Control / Feedback Systems Control System = Plan, including schedule –SRR utilizes an Annual Plan –Once approved, assessments loaded into electronic system Feedback System = Review Plan Periodically –Indicators for performance of assessments, findings and opportunities for improvement identified –Sortable by facility, functional program area

Obtain Management Support Assessment Plan Concurrence by Managers, approved by President and Project Manager Management direct involvement the Basic Standard of Performance –Provide resources –Quality of assessments –Evaluation of results –Adherence to schedule

Periodically Pulse Progress Establish a method to report to management Modify when situation dictates –Results of operational occurrences –Changes to programs or processes