PREVIEW - Sixth Framework Programme PREVention Information and Early Warning WP4340 “Very Short-Range Flash Flood Laboratory” Leader: MeteoFrance Start.

Slides:



Advertisements
Similar presentations
© Crown copyright /0XXX Met Office and the Met Office logo are registered trademarks Met Office FitzRoy Road, Exeter, Devon, EX1 3PB United Kingdom.
Advertisements

Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
QPF verification of DWD-LM and LAMI model using high resolution non-GTS data in Piedmont region and Northern Italy Working Group 5: Verification and Case.
Towards an Hydrological Qualification of the Simulated Rainfall in Mountainous Areas Eddy Yates, Sandrine Anquetin, Jean-Dominique Creutin Laboratoire.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Participation in MAP D-PHASE / COPS Description of MAP D-PHASE project Implementation strategy Key relevant features of GEM v3.3.0 Overview of verification.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
High-resolution Non-hydrostatic Numerical Weather Prediction of Mediterranean torrential rain events Véronique DUCROCQ, Cindy LEBEAUPIN, Olivier NUISSIER,
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
Verification Precipitation verification (overestimation): a common view of the behaviour of the LM, aLMo and LAMI Francis Schubiger and Pirmin Kaufmann,
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
Name, Surname, Position Logo(s) Weather monitoring and forecasting over eastern Attica (Greece) in the frame of FLIRE project Vassiliki Kotroni (1), Konstantinos.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE : Report of Rapporteur on Extreme Potential Floods AUTHOR:
Application of a rule-based system for flash flood forecasting taking into account climate change scenarios in the Llobregat basin EGU 2012, Vienna Session.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
A.Montani; Eurorisk-Preview COSMO meeting, Zurich, September 2005 PREVIEW in some words (PREVention, Information and Early Warning) A project funded.
Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental Management.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Final PP QPF meeting COSMO General Meeting, 18 September.
Verification of the distributions Chiara Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna Bologna, Italy.
European Cooperation on Nowcasting Yong Wang, ZAMG.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss MAP D-PHASE – a WWRP Forecast Demonstration Project Marco.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
Modelling of continental surfaces 1)Models directed towards long term water budget simulations (WG2) –Continuous modelling –Modelling of the whole Mediterranean.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Heavy rainfalls in Moldova Elina Plesca, engineer-programmer, Weather Forecasting Center EUMETCAL NWP course, October 22 – December 14, 2007 State Hydrometeorological.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
WMO activities in flood management Climate Change and River Basin Management in the Dniester Chisinau, 9-10 July 2013.
The 19 th of June 1990 : The Schengen Implementing Convention has been signed by : - Germany - Belgium - France - Luxembourg - Netherlands Calendar.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
Latest results in the precipitation verification over Northern Italy Elena Oberto, Marco Turco, Paolo Bertolotto (*) ARPA Piemonte, Torino, Italy.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
SIGMA: Diagnosis and Nowcasting of In-flight Icing – Improving Aircrew Awareness Through FLYSAFE Christine Le Bot Agathe Drouin Christian Pagé.
AMPHORE - Interreg III B Medocc
André Walser MeteoSwiss, Zurich
Verification of LAMI: QPF over northern Italy and vertical profiles
Months of the Year ©Copyright
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
Daniel Leuenberger1, Christian Keil2 and George Craig2
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
2018/2019 School Calendar July August September October November
Performance Measures Friends and Partners in Aviation
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
iCoast integrated Coastal Alert System Kick off meeting
SRNWP-PEPS COSMO General Meeting September 2005
The Transformation of A Small Company Into A Golden Legend
Tropical cyclones movement
February 2007 Note: Source:.
Who Wants to be a Millionaire?
PREVIEW in some words (PREVention, Information and Early Warning)
MONTHS OF THE YEAR January February April March June May July August
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

PREVIEW - Sixth Framework Programme PREVention Information and Early Warning WP4340 “Very Short-Range Flash Flood Laboratory” Leader: MeteoFrance Start date of the project: APRIL 1 st 2005 Duration: 45 months Partners: MeteoFrance (F), ARPA Piemonte (I), LTHE Grenoble (F), MeteoSwiss (CH), NOA (GR), NOVELTIS (F) Overall objective: The overall purpose of WP4340 is to improve the very short-range forecast of Mediterranean flash-floods over medium basins, based on the next generation European high-resolution NWP models.

Sub-themes: 1.Value of the near-future high-resolution NWP precipitation forecasts (MF, ARPAP, MS, NOA, NOV) 2.Two-way/one-way coupling (LTHE, ARPAP, MF) 3. Common protocol and framework for hydro-meteorological coupling (MF, LTHE, ARPAP, MS, NOA, NOV) 4.Verification approaches and inter-comparison facilities (NOV, MF, LTHE, ARPAP, MS, NOA) 5.End-users (ARPAP, MF, LTHE, MS, NOA, NOV) Pilot Sites: Cévennes-Vivarais region (Southeastern France) Piedmont region (Northern Italy) Test Cases: 1-3 December 2003 (CV) 4 November 2004 (CV) 5-9 September 2005 (CV) 4-6 June 2002 (P) 1-2 September 2002 (P)

Meteorological models involved: LAMI (Italy, 2.8 km) aLMo2 (Switzerland, 2.2 km) MM5 (Greece, 2.5 km) MesoNH (France, 2.5 km)

First tests with aLMo2 over Piedmont Forecast started 5 June 00 UTC, 12h precipitation from 5 June 12 UTC to 6 June 00 UTC aLMo7 aLMo2Radar Next meeting: October 2006 in Torino