HFT face-2-face F.Videbaek Brookhaven National Lab.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
Project Overview Flemming Videbaek Brookhaven National Laboratory.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Server Virtualization: Navy Network Operations Centers
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Project Status Report Presenter Name Presentation Date.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
T Project Review RoadMappers I2 Iteration
PCAP Close Out Feb 2, 2004 BNL. Overall  Good progress in all areas  Good accomplishments in DC-2 (and CTB) –Late, but good.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
09/05/2006Project Status Report1 Nova DAQ Software Development Project Status Update for 09/05/2006 Gerald Guglielmo (CD/CEPA/OAA)
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
TK2023 Object-Oriented Software Engineering
HFT project Overview and Status March 10, 2010
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
7th Belle II VXD Workshop, Prague
Face to Face Meeting – March 2012 Sarah Morgan
Presentation transcript:

HFT face-2-face F.Videbaek Brookhaven National Lab.

Overview Meeting Goals Project Formal Status KPPs and transition to Operation Other CD2/3 review recommendation Technical Status Tomorrows discussion points

Meeting Goals Technical progress since review High level goals per system through January –We have the scheduled but like your assessment Sub system –Critical items to move forward –Manpower needs –Risk, problems Plans for run-13 and run-14 Heading off DOE requirement up front –Verification –Schedule slips DAQ, slow control discussion Software efforts ( has to ramp up).

Project Status CD2/3 review on July at BNL –Review went very well –A number of recommendation had to be fulfilled ahead of ESAAB approval meeting KPP and PEP getting finalized ESAAB scheduled for October 11 at 11 am

KPP discussion At the review GR brought up for the first time the issue of beam verification. This clearly got hold within ONP, even though OPA strongly discouraged this. This stand prevented the PEP to be finalized and a very large effort have gone into this issue from HFT, BNL HENP and also DOE. This in end caused delay even though we as project had all documentation ready in time. Outcome (though not approved given next slide). Not ideal but something we just have to live with- from scientific point of view not bad, but add lots of risk and dependences.

KPP text The capability of the HFT system to achieve the KPPs will be demonstrated through the measurement of subsystem functional parameters and detailed, realistic simulations using the full STAR detector simulation package and analysis software. The subsystem functional parameters will be obtained through bench tests, survey measurements, and the meeting of design specifications. The planned early finish schedule has the HFT system ready for installation into STAR approximately two months prior to the Run-14 start date (approximately December 2013). As verification of KPP's with beam is preferred, the project will attempt to demonstrate these using RHIC Run-14 Au-Au collision data.

Primary CD-2/3 recommendation MOUs were reviewed by ONP in July. Part of research vs. instrumentation resource division discussions and delegation within ONP. WBS 1.6 was revisited to include CMM, Database software. Added milestones at L3. These will be tracked by project monthly; also reported monthly to DOE. (Early Finish dates) ESS&H points completed. Evaluation of FY12 Continuing resolution (CR)

Secondary Recommendation & Comments Select technology for engineering run. Done- Ultimate Coordination of CF activities via L3. Generate assembly documentation for PXL and IST ladders. Continue effrorst to understand radiation environmebt. IST internal hybrid prototype often have issue. Look at mitigation strategies.! Be sure other STAR detector components that are integral to integration is consideraed carefully. (BBC, FGT).

Transition to operation Message from HM In addition, we want to modify the approach to the post-CD-4 effort that is needed to turn the HFT into a fully- performing physics instrument, i.e., the effort that is needed to bring the HFT system to optimal performance with beam. We would like BNL to start developing a detailed, project-like plan to achieve this in a timely way, which should include (the equivalent of) a resource-loaded WBS, milestones, and deliverables. This plan would not be a prerequisite to CD-2/3 approval. We will give you further guidance on this in the near future. These suggestions was also brought up at the June S&T review, and will be This is clearly a charge to STAR, BNL and the HFT project. It needs to be presented at CD-4 closeout. It has been discussed with BNL management and also iterated with Helmut as late as last week. It is still not determined from ONP what they really want. The PEP will now contain a stetement that such plan needs to be developed.

Funding For FY10,11 received 2,300 2,900 Received an additional 1,500k$ in Sept. from FY12 funds (as far I understand). Total on BNL books 6,800 (~40% total of all funds)

My view of sub-system status PXL –Readout, sensor, test well underway –PXL Insertion test is about ready; slipped compared to schedule (months) IST –Prototype sensor (Hamamatsu) on track –Ladder prototype test hampered by hybrid cable issues –SOW needs to be done ASAP SSD –Ladder Cards and readout well underway. –Watching the Nantes connection (sub-contracts delay and hurdles).

Integration & Global Structures IDS basically completed for run-12 installation. There has been some slippage due to extra work, and rechecks. Installation for run-12 on track Has affected some other activities. The run-13 open activities (beampipe, NEG coating, heating blankets, MSC) needs attention.

Carbon Fiber activities Carbon fiber workshop has multiple activities. –Global structures PST, MSC –PXL sensors Ladder Sectors –IST IST ladders, hybrid cable –SSD Supporting structures Coordination of these activities is important, and creates linkage between sub-system work.

Other Activities Sub-system safety review –PXL had first yesterday –Plan for these early so as few surprises as possible late –Interlock Slow Control development –Discussion with STAR S&C –Interface early also with Creighton Group; may have student available soon to provide interface. Software must be ramped up.

Management Track L3 milestones and cost with sub-systems. Use this as a tool to identify slippage early and follow up on this. Track cost and progress in WBS monthly. Continue the good work in documenting our progress in monthly reports.

Tomorrows discussion points Address issue brought up by sub-systems Review the point have have brought up.

Summary Thanks to many efforts we are getting funded; many technical issues have been resolved. Need to keep up the good work and coordinate efforts. Hopefully the management task will be less since review The time line is short, let us work to make sure this becomes a success for STAR and the physics program.