SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,

Slides:



Advertisements
Similar presentations
Cisco 6500 E-Series Chassis Up-grade
Advertisements

A+ Certification Guide
Assembly / Disassembly / Reassembly Computers. Chapter Objectives After completing this chapter you will: Understand how static electricity can damage.
Verigy V93000 Service Training
Build Your Own Computer Ed Evans Information in this presentation Copyright 2005 PC Media, Inc. All rights reserved. Reprinted with permission from
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Introducing the TLS Series Libraries. Qualstar TLS Library Systems  Full range of tape libraries –AIT –SAIT –SDLT –LTO  Intra-family scalability  Proven.
SGI Confidential Shelf Hardware. SGI Confidential Shelf Front View Canister Status LEDs Canister 0Canister 7 Canister Position Number Canister.
SGI Confidential Application Processor. SGI Confidential Application Processor Overview Application Field Replaceable Units The Application.
Module 8 Installation & Setup M1000e Chassis
Chapter 3: Computer Assembly Sabbir M Saleh Lecturer Department of Computer Science & Engineering University of South Asia Computer Fundamentals & Programming.
Chapter 4 Overview of Preventive Maintenance
Printer Installation Ben Wu A&S IT 09/18/2007. Outline  Preparation  Local Printer Installation  Network Printer Installation  Printer Sharing  Other.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
Assembling a Computer Safety Precautions CPU Installation
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Duties of a system administrator. A system administrator's responsibilities typically include:
Installing Virtualisation Software and Virtual Servers.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
LPO Library Partition Option Rod Rockoff. Library Partition Cards NEO 2000 and 4000 Part Numbers OV-LXN ( includes 8 port router ) –
1 Exercise 1 Computer Hardware. 2 Objectives for Exercise 1 When you complete this exercise, you will be able to:
Chapter 8 All About SCSI.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
IT Essentials: PC Hardware and Software v4.0. Chapter 3 Objectives 3.1 Open the case 3.2 Install the power supply 3.3 Attach the components to the motherboard.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 IT Essentials PC Hardware and Software 4.1 Instructional Resource Chapter.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
May Fiber Optic Technology Basics May 2008 WHY USE FIBER OPTICS?  Superior Signal Quality  Long Distance Signal Transmission  Protection from.
CompTIA A+ Certification 801 Support Skills
© Cisco Systems, Inc. All rights reserved. Cisco Public ITE PC v4.1 Chapter 3 1 Chapter 3: Computer Assembly – Step by Step IT Essentials: PC.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
Presentation on Assembling a Computer Presenting By: Neeraj Dhiman.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
PC Maintenance: Preparing for A+ Certification Chapter 8: Installing and Troubleshooting the Basic Components.
00:07 Building Your Own PC Building Your Own PCBy David Palmer.
HP2-K09 HP Supporting MSL2024 and MSL4048 Tape Libraries Thousands of IT Professionals before you have already passed their HP2-K09 certification exams.
PC Systems Building System Components Installation Procedures Sample PowerPoint Presentation.
SmarterStorage TS4500 R1 DST New models and Features Juli, 2014.
COMMUNICATION INFOTECH. BTS COMMISSIONING Switch of the bts cabinet & disconnect a bts connectors from DDF before offline start Disconnect the bts connection.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 23 Purchasing a PC or Building Your Own.
NETWORKING & SYSTEM UPDATES
Assembling & Disassembling of CPU. Mother Board Components.
Management and Maintenance of ICT Labs. Typical School Lab.
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
Unit 4, Lesson 10 Field Replaceable Units (FRUs) AOIT Computer Systems Copyright © 2008–2013 National Academy Foundation. All rights reserved.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Avaya IP600 Rack Mount Cabinet Installation –EXITEXIT 1 This slide show summarizes the installation procedures for the IP600 rack mounted cabinet (RMC).
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
FIRST: Start by opening the side flaps of the box, revealing her interior, where later will place each component.
CompTIA Server+ Certification (Exam SK0-004)
Managing HP Enterprise Virtual Array
Chapter Objectives In this chapter, you will learn:
Chapter 3: Computer Assembly
Computer and Information Technology for HKCEE
K TO 12 CHS MODULE FOR GRADE 9, PP
S12700 CSS Card Clustering 1 Components and Tools 2 Installing Cards
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Introduction to Computers
Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem
Chapter 3: Computer Assembly – Step by Step
What’s in the Box?.
Chapter Overview Computer Disassembly and Reassembly
Computer Repair & Maintenance
IBM System x Technical Principles V9
1.11: Robot Controller.
Presentation transcript:

SL500 Modular Library System

Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack, install & configure the library. De-install the Library. Configure switches, bridges and hubs. Label and route cables drives to other equipment. Verify and /or install library firmware.

Objectives Setup and operating performance. Diagram and document the installation. Update the site logs to reflect the customer’s subsystem configuration.

Prerequisites SL500 Principles of Operation SAN Concepts and Connectivity. L-Series Library course. LTO Ultrium course. SDLT course.

Personal Safety Safety Precautions Lifting Techniques Shoulder, Elbow, Wrist, and Hand Safety Fiber -optic Safety Rack Safety

Product Precautions Electrostatic Discharge (ESD) Damage Prevention  ESD Precautions  ESD Protection Procedure  Prepare the work Area  Access the Equipment  Replace components  Cleanup Fiber – optic Cable Installation  Cable routing  Cable Management  Connector protection

Planning the Installation General Information  Prepare the Installation location  Knowledge in SCSI principles  Knowledge in Fibre channel principles  Configuration Diagram

SL500 Tape Library Types Library with LTO Cartridge Slots Library with Mixed-Media Cartridge Slots

Library with LTO Cartridge Slots The Base module contains  50 cartridge slots  One or two tape drives  5 – slot cartridge access port(CAP)

Library with LTO Cartridge Slots base module

LTO Slot Physical Configurations Slot Numbering scheme  Four Integers 1.Library number 2.Library module number 3.Library row number 4.Library column number

Library with Mixed - Media Cartridge Slots

Library and Rack Dimensions

Library Components Weights

Library Environment Specifications

Power for Library Without Tape Drives

Power for Base Unit and Two LTO Tape Drives

Installing EZ Hardware Compatibility Issues

Installation Steps  Unpacking  Inspection  Preparation of Rack  Install Base Unit  Install Robotics Unit  Install Façade  Install an Expansion Module  Install the Drive Tray Assemblies  Install the Power Cables  Install the Library SCSI or Fiber Channel Cables  Inserting Cartridges  Locking the Front Door and Powering-on the Library

Base Module Accessory Kit

Expansion Module Accessory Kit

SCSI Cabling

Fiber Channel Cabling

Inserting Cartridges

Powering - on the Library

Recording the Configuration Library Configuration Information

Recording the Configuration Tape Drive Configuration Information

Security & Password

FRU and Spares Replacement  Library FRU list  Drive FRU list

Library FRU List  Cards  MPU2  MPW  RLB  RLC  RLE  RLM  Fans  Operator Panel  Power Supply  Robotics unit  Drive FRU list

Drive FRU List RLD Card Fan Tape Drive Brick

Remote Access Tools Stream Line Library Console Service Delivery Platform(SDP) Motive Insight ACSLS