PAUL SCHERRER INSTITUT CERN / Oct. 17. 2005 / P.A.Schmelzbach.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Cyclotron Refurbishing & Development Meeting March 6, 2008.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Wir schaffen Wissen – heute für morgen Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Andreas Lüdeke Paul.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
MODULE “STRATEGY DEVELOPMENT”
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
PAUL SCHERRER INSTITUT Experience with High Power Operation at PSI M.Seidel, PSI HB2008, Nashville.
The High Intensity Proton Accelerator of the Paul Scherrer Institute.
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
ENSI Swiss Federal Nuclear Safety Inspectorate ENSI ENSI Management System IAEA Regulatory Cooperation Forum, 18 September 2015 Dr. Hans Wanner, Director.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Department of Community Health Bureau of Health Systems Radiation Safety Section Bruce Matkovich, Section Manager.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Authorization and Inspection of Cyclotron Facilities Design, Layout and Shielding.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Paul Scherrer Institut
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Wir schaffen Wissen – heute für morgen muSR Workshop at FNAL Oct 17-19, 2012, Daniela Kiselev, Paul Scherrer Institut PSI, Paul Scherrer Institut Meson.
Mu2e Target Hall Remote Handling - Contamination Control, Schedule, Risk & Conclusions Ryan Schultz Deputy L3 Manager Target Station 11/17/2015.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Preparation of 60 Fe, 44 Ti, 53 Mn, 26 Al and 7/10 Be samples for astrophysical experiments.
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
High Energy Neutron and Proton Irradiation Facilities at TSL Alexander Prokofiev, , 6th LHC Radiation Workshop 1.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Do you believe in Operation Statistics
Radiation Protection Issues After 20 Years of LHC Operation
Perspective on future challenges for very high energy hadron colliders
Overview of LERF Status, Plans and Goals
Upgrade Strategy for the Experimental Vacuum Systems
PSI’s high intensity proton accelerator – an overview Mike Seidel, PSI
Radioactive waste management - status
SLHC-PP kick-off meeting, CERN 9 April 2008
Course Structure.
LCLS Personnel Protection System and Beam Containment System
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
Radwaste: status & way forward
Operation of Target Safety System (TSS)
Presentation transcript:

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach PSI Experience, Dealing with a MW Beam… Pierre A. Schmelzbach …in Switzerland

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach COCKCROFT-WALTON INJECTOR keV TRANSFER LINE 72 MeV TRANSFER LINE 590 MeV CYCLOTRON TARGET E TARGET M SINQ TRANSFER LINE SINQ OVERVIEW Protonentherapie (+ 2006) UCN (in construction) IP 3 mA /1.8 MW 2 mA /1.2 MW 2 mA /1.1 MW 1.4 mA /.8 MW

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Basic Considerations for Design and Operation Accelerators:Cyclotrons with large turn separation at the extraction Losses:Extraction from Injector Cyclotron, injection and extraction from Ring Cyclotron: < 0.5  A each Beam lines: < 1nA / m Local shielding Remote handling Repairs in hot cell located in machine / experimental hall

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Rebuilding of Target E / Beam Dump

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach TARGET E TARGET WHEEL ABSORBERS COLLIMATOR K1 COLLIMATORS K2 + K3

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Layout of the beam line between target E and beam dump

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Special tools Shielded flasks for transportation to hot cell Remote control of main functions (e.g. lifting defective component out of beam line shielding)

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Accelerator & Beam Line Protection Range of 590 MeV p in steel is 28 cm = welding torch ! The Run Permit System has to switch off the beam in less than 5 ms in order to avoid burning a hole in a vacuum chamber Transmission Halo Losses (Ioniz. Chambers)

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach We are not alone ! Swiss Authorities: BAG / OFSP (Swiss Federal Office of Public Health) HSK / DPSIN (Swiss Nuclear Safety Inspectorate) NAGRA (National Cooperative for the Disposal of Nuclear Waste) Burocracy - before - during - after

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach eventually…. + some others…

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach 1.Gen. description of the facility / use 2.Plan of controlled areas 3.Machine protection systems 4.Regulations RA-protection (site) 5.Regulations RA-protection (Control Room) 6.Operating regulations for personnel RA-protection systems 7.Concept personnel RA-protection systems (access control vaults) 8.Operating regulations accelerator Responsabilities Operation, emergencies,… 9.Access regulations to site 10.Quartely reports (Doses) Further authorizations needed for Release of radioactivity Hot cell operation Special user‘s facilities Basis for the authorization to operate the PSI proton facility

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach The good old times... Things become tougher ! Experience with the high current accelerator Start of the project was quite easy, first upgrade (<1.5 mA) also Upgrade 1.5 to 2 mA - only short test periods at higher current allowed first - delay >2 years because a long pending condition was not fulfilled ( controlled access to site [RA check of persons, vehicles]) Enhanced requirements on facilities for selective storage of material (be carefull with vocabulary and definitions) History, tracking of RA material (waste), e.g. ISRAM, specifications for waste / waste containers (HSK, NAGRA) Also: BAG frequent visits (about once a month), presentation of shutdown planning

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Experience with the installation of our new 250 MeV, 500 nA cyclotron (PROSCAN Project) BAG want: to be involved at a early stage (before you start to build something) submit plans and safety report early to supervise step by step the commissioning of the systems several requests for “authorization to operate xxxx” + progress reports Looks also at things that are not their immediate business (e.g. rf- systems)

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach Recommendations: (to solve a 3-dimensional problem: technology, law, psychology) Invite BAG to a first, general information on the project (Dr. Nicolas Stritt ?) Define the scope of the project (accelerator only, target a.s.o as separate projects). Feel what they want to have in the safety report (can be discussed !, they are reasonable people). Problem with “arbitrary” requirements. Safety report: present solutions that satisfy their standards ( not too little, but also not too much !). Operating regulations: clear information on who is responsible for what. They accept local rules if equivalent to their standards. They read safety report and operating regulations very carefully

PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach 4 MW Good Luck !