Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.

Similar presentations


Presentation on theme: "Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL."— Presentation transcript:

1 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL

2 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report EPICS Usage at PSI In transition Planned In use He Liquefaction SLS UCN Timing XFEL 250 MeV Injector Test PSI-XFEL PROSCAN XFEL Low Emittance Gun Test Operations Building Proton Superbuncher

3 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report New Operations Building ■ New "combined function" control room ► SLS ► Proton facility ► PROSCAN ► XFEL ■ New server room ■ New offices ■ New cafeteria

4 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report SLS Filling Pattern Feedback ■ Better charge distribution ■ Improved beam stability  Separate talk

5 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report SLS Beamline IT Infrastructure Upgrade ■ Old SLS control room became new server room for beamlines ■ New data storage ► Up to 30 TB per beamline ■ New network topology  Separate talk

6 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report Other SLS (PX) Beamline Improvements ■ High precision rotation stage  separate talk ■ Sample mounting robot  separate talk ■ Pilatus 6M detector

7 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report Proton Facility PROSCAN Proton Therapy UCN Ultra Cold Neutrons SINQ Spallation Neutron Source Gantry 1 Gantry 2 Optis 2 Optis Eye Cancer Therapy Ring Cyclotron

8 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report Cyclotron Upgrade ■ New cavities for beam current upgrade to 3 mA ■ Replace old CAMAC with new VME hardware ■ New superbuncher runs with EPICS ■ Long term future plans: ► Replace complete control system with EPICS ► Integrate pion/muon beamlines ► Upgrade network infrastructure

9 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report UCN (Ultra Cold Neutrons) ■ Spallation source under construction (start ~2009) ► 5K cold deuterium moderator ► neutrons <1µeV, 7m/s, 25km/h ■ Proton beam time structure is controlled with EPICS 1.Lead target 2.D 2 O moderator 3.Solid D 2 moderator 4.UCN guide 5.Valve 6.To experiments 7.Storage tank

10 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report PROSCAN ■ Dedicated accelerator for cancer treatment with protons ■ Over one year in operation ■ At the moment: Trying to replace accelerator control system with EPICS ► Problem: Can test only on weekends ■ Early 2009: Optis 2 ► Partially EPICS ► Patient treatment system is not EPICS ■ Late 2009: Gantry 2

11 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report PSI-XFEL 80 m Undulators Experiment Building 800 m tunnel SLS Aare Tunnel is a bridge here ! farm land Low Emittance Gun 400 m Linac

12 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report PSI-XFEL Schedule ■ 500 keV gun test dismantled ■ Setup of 4 MeV test ■ Building for 250 MeV test linac under construction ■ Milestone: Proof of principle in October 2010 ■ XFEL construction start in 2011 ■ XFEL operation start in 2016

13 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report Firewire Camera Server ■ Linux IOC with embedded HTTP server ■ Used for beam diagnostics at SLS, XFEL, …  See Mirosław Dach's talk at PCaPAC PC /dev/video EPICS server WWW server

14 Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Status Report Other controls activities ■ Upgrade of PCs to Scientific Linux 5 ► Many unexpected problems ■ Adaption of SLS controls tools for XFEL ■ Build up IT infrastructure for XFEL ■ Evaluation of embedded Linux IOCs ■ Evaluation of remote control (web access) for SLS beamlines ■ Planned: Upgrade of SLS IOCs to EPICS 3.14