RELATIONSHIPS OF RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM) TO OPERATIONAL READINESS & SUPPORTABILITY Bernard Price Certified Professional Logistician.

Slides:



Advertisements
Similar presentations
Maintenance Planning and Control : Modeling and Analysis
Advertisements

Bernard Price Certified Professional Logistician Supply Management & Model Theory.
Statistical Inventory control models I
Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.

Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Stracener_EMIS 7305/5305_Spr08_ System Availability Modeling & Analysis Case Studies Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering.
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics Operational Availability Mission Reliability Logistics Response Time Total Life Cycle Cost.
1 Logistics Measures and Considerations IEGR 459: Intro to Logistics Management and Supply Chain Sept. 19, 2011 Fall 2011 Maintainability System Effectiveness.
Summary of Revisions DoD Manual DoD Supply Chain Materiel Management Procedures 0.
Moody F061 ISE Conceptual System Design “Sets the Stage” State the problem Identify the need Conduct advanced system planning & feasibility analysis.
CG OM&S What is it? Where is it? Rotables * Audit What’s left?
The Drug Management Cycle – Distribution
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
1 Logistics Systems Engineering Availability NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Understanding Back-End Systems Chapter 9. Front-End Systems Front- end systems are those processes with which a user interfaces, and over which a customer.
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.
DEPOT AND ITEM LEVEL BUSINESS CASE ANALYSIS (BCA) & TOOL Bernard Price Certified Professional Logistician.
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
ICS321 – Management Information Systems Dr. Ken Cosh.
Inventory/Purchasing Questions
Slides 6 Distribution Strategies
LEAD-TIME REDUCTION IN MILITARY LOGISTICS By Yunus Emre KARAMANOGLU.
CUSTOMER ACCOMODATION
Introduction to Logistics. Exactly What is “Logistics?” Business Logistics –The planning, implementation, & control of the efficient & effective flow.
Stracener_EMIS 7305/5305_Spr08_ Supply Chain Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305 Systems Reliability,
Stracener_EMIS 7305/5305_Spr08_ System Reliability Analysis - Concepts and Metrics Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering.
VectorCSP. Questions How many people in here manage assets? How many of you know the condition of those assets? How long until the next calendar or hourly.
0 CHAPTER 3 Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows © 2009 Cengage Learning.
Module VI. CUSTOMER SERVICE - WHAT A Tool for Differentiation  Customer Service Is the Fuel That Drives the Logistics Engine  Logistics System Ensures.
Reliability & Maintainability Engineering An Introduction Robert Brown Electrical & Computer Engineering Worcester Polytechnic Institute.
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
BERNARD PRICE Certified Professional Logistician Supportability Optimization to Achieve Availability Goals in Acquisitions.
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Logistics Management LSM 730 Lecture 8 Dr. Khurrum S. Mughal.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
Unit-3 Reliability concepts Presented by N.Vigneshwari.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Maintenance Management [14]
The Supply Chain Management Guide 8. Customer Service.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Recoverable Service Parts Inventory Problems -Ibrahim Mohammed IE 2079.
Logistics.
ME Spring 2015 Systems Engineering, Part II Session 16 5 March 2015 Mr. Larry Hopp, CPL.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
IIMM, Bangalore Branch1.  They are ;  1)PRODUCTION  a)Production of H.D.P.E Pipes  b)Production of Tanks  2)STORE  3)MAINTAINANCE  4)DAISPATCHING.
Performance Based Logistics
Customer Accommodation
Summary of Changes to the
Chapter 2 Information Systems in Organizations
BERNARD PRICE Certified Professional Logistician
Certified Professional Logistician
ACHIEVING A SYSTEM OPERATIONAL AVAILABILITY REQUIREMENT (ASOAR) MODEL
Total Productive Maintenance and Maintenance Management
Supply Management & Model Theory Certified Professional Logistician
Jerry-Ann L. Oluya BEN-32.   Scheduling is to establish the timing of the use of equipment, facilities, and human activities in an organization. The.
ABB SACE Maintenance Preventive Maintenance Program
BUSINESS CASE ANALYSIS (BCA) & TOOL Certified Professional Logistician
Operations Management
GEOP 4355 Distribution Networks
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics
Single Stock Fund (SSF)
Understanding Back-End Systems
Operations Management
OUTLINE Questions? Comments? Any stories? Quiz Results Return Quiz
Operations Management
Business Logistics Management
Presentation transcript:

RELATIONSHIPS OF RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM) TO OPERATIONAL READINESS & SUPPORTABILITY Bernard Price Certified Professional Logistician

The Probability that the Equipment is Operating or in a Committable Condition to Operate at any Random Point in Time Quantitative Expression of User Need Prior to Fielding Operational Availability

The Experienced Probability that Reported Weapon Systems are considered Up to Accomplish their Mission Unit Commanders are Responsible for Readiness Rates of their Systems After Fielding Operational Readiness

Ao = UP TIME UP TIME + DOWN TIME = UP TIME / SYSTEM FAILURE (UP TIME + DOWN TIME) / SYSTEM FAILURE Readiness Rate = UP TIME UP TIME + DOWN TIME = NO. OF DAYS SYSTEM UP (NO. OF DAYS SYSTEM UP + NO. OF DAYS SYSTEM DOWN) Operational Availability & Readiness Rate Similarity

Ao = UP TIME UP TIME + DOWN TIME = UP TIME / SYSTEM FAILURE (UP TIME + DOWN TIME) / SYSTEM FAILURE UP TIME / SYSTEM FAILURE = DOWN TIME / SYSTEM FAILURE = MCTBF MTTR SYSTEM ALDT + Mean System Restoral Time per System Failure MSRT SYSTEM = Derivation of Operational Availability

Equipment Levels of Indenture LINE REPLACEABLE UNITS (LRUs) END ITEMSSYSTEM TOTAL WEAPON SYSTEM WITH ITS GFE READINESS REPORTED EQUIPMENT PRIMARY ITEMS BEING DEVELOPED/ACQUIRED SYSTEM WITHOUT GFE OR GFE ITEMS SECONDARY ITEMS REPLACED FORWARD ITEMS IMPACTING MAINTAINABILITY Other Terminology SHOP REPLACEABLE UNITS (SRUs) SECONDARY ITEMS USED TO REPAIR LRU OR HIGHER LEVEL SRU

Serially Configured Ao. Ao SYSTEM Ao 1 Ao 2 x Ao N =xx Ao SYSTEM Ao 1 Ao 2 Ao N = xx

MCTBF SYSTEM MCTBF 1 MCTBF 2 + MCTBF N = Serially Configured Reliability.

Mean System Restoral Time Breakdown in Models MSRT SYSTEM = MTR SYSTEM + CWT SYSTEM MTR - Mean Time to Restore with 100% Stock Availability Forward CWT- Mean Customer Wait Time at Forward Level per System Failure MTR SYSTEM = MTTR SYSTEM + MRDT SYSTEM MRDT - Mean Restoral Delay Time with Spares Available Forward

Spares are Not Collocated with Equipment Spares are Delivered Forward to Restore Contact Maintenance Team Restores Equipment Equipment is Evacuated to Restore Some ILS Elements May Not Be Satisfactory Personnel Lacking Appropriate Skills Personnel Not Available Non-Functioning TMDE Forward Forward Repair Documentation Insufficient Restoral Delay Time Contributors

Ao SYSTEM MCTBF SYSTEM MTR SYSTEM +CWT SYSTEM = + MCTBF SYSTEM Operational Availability Restated Ao SYSTEM MCTBF SYSTEM + = MTTR SYSTEM ALDT SYSTEM +

CWT = FILL 1 x 0 + (1 - FILL 1 ) x MTTO 1 CWT = (1 - FILL 1 ) x MTTO 1 FILL 1 - Probability of Filling an Order from Forward Level Stock MTTO 1 - Mean Time to Obtain a LRU at Forward Level Support Relationship of Customer Wait Time to LRU Logistics Response Time

DECENTRALIZED LOCATION DECENTRALIZED LOCATION DECENTRALIZED LOCATION DECENTRALIZED LOCATION INTERMEDIATE SUPPORT INTERMEDIATE SUPPORT CENTRALIZED LOCATION Traditional Supply Flow

CENTRALIZED LOCATION INTERMEDIATE SUPPORTS DECENTRALIZED LOCATION MANUFACTURER OR PLANT WAREHOUSE DISTRIBUTION CENTER OR REGIONAL WAREHOUSE RETAIL STORE DEPOT SUPPORT OR WHOLESALE LEVEL GENERAL SUPPORT DIRECT SUPPORT (AUTH STOCKAGE LIST) ORGANIZATIONAL SUPPORT OR SITE (PRESCRIBED LOAD LIST) STOCKAGE LOCATIONCOMMERCIALGOVERNMENT Inventory Distribution

Maintenance Flow DECENTRALIZED LOCATION INTERMEDIATE SUPPORT CENTRALIZED LOCATION Repair at Organizational or Unit Level Repair at Direct or Regional Support(s) Repair at Depot or Contractor P(1) P(2) P(3) Ship Out for Repair Ship Out for Repair THROW AWAY WASHOUT RATE Ship Out for Repair LOCATIONECHELON (J) NOTE: P(J) is percentage of repairs made at echelon J P(J) + Washout Rate = 1 3 J=1 M

MTTO 1 = RCT 1 x PCTREP 1 + (1-PCTREP 1 ) x (OST (1-FILL 2 ) x MTTO 2 ) FOR LRU THROWAWAY OR REPAIR AT CENTRALIZED LOCATION FOR LRU REPAIR AT THE INTERMEDIATE LOCATION OST - ORDER & SHIP TIME FILL - ORDER FILL RATE (STOCK AVAILABILITY) PCTREP - PERCENTAGE OF LRUs REPAIRED RCT - REPAIR CYCLE TIME MTTO 2 = OST (1- FILL 3 ) x MTTO 3 MTTO 2 = RCT 2 x PCTREP 2 + (1-PCTREP 2 ) x (OST (1-FILL 3 ) x MTTO 3 ) Determining Mean Time To Obtain Spares Values

Ao Adjustment Possibility. Ao ADJUSTMENT = MCTBMA – Maintenance Action Time Adjusted= MCTBMA / Ao ADJUSTMENT MCTBMA - Mean Calendar Time Between Maintenance Action Periodic Maintenance Actions that may cause Down Time: Preventive Maintenance Tear Down and Set up Software Change Actions Servicing Prior to and/or After Missions Ao SYSTEM

Primary Impacters of Operation Availability Critical Items Within Serial Configurations Critical Items that are Line Replaceable Units Demand Frequency of Critical Items (Reliability and False Pull Rate) Mean Time to Restore (Maintainability & Restoral Delay Time Forward with 100% Stock Availability) Stock Availability at Most Forward Retail Supply Level Order and Ship Time to Most Forward Retail Supply Level

Conditional Primary Impacters of Operational Availability Additional Mean Time to Restore (when forward level supply is not co-located with the system) Frequency of Scheduled/Periodic Actions to System or Serially Configured End Items (when servicing, preventive maintenance, etc. applies) Time to Perform Scheduled/Periodic Actions End Item Redundancy or Float Stock Availability (when failed end items are sent back for repair or thrown away) Number of Serially Configured Common End Items or LRUs in System

Secondary Impacters of Operational Availability Stock Availability of Critical Item LRUs at Intermediate Retail Supply Levels Order and Ship Time to Intermediate Retail Supply Levels Centralized Support Level Mean Time to Obtain Backorders of Critical Item LRUs

Conditional Secondary Impacters of Operational Availability  IF LRU IS NOT STOCKED OR REPAIRED AT INTERMEDIATE SUPPORT:  Stock Availability of Critical Item LRUs at Centralized Supply Level  Turn Around Time to Diagnose False Pulls if Performed  IF LRU IS REPAIRED AT INTERMEDIATE SUPPORT OR CONTRACTOR REPAIR & RETURN APPLIES INSTEAD OF USING DEPOT LEVEL SUPPLY:  Percentage Repaired at Intermediate Repair Level(s)/Contractor  Retrograde Shipping Time to Intermediate Repair Level(s)/Contractor  Turn Around Time for Intermediate Repair Level(s) Repairs/Contractor  Stock Availability of Critical Item Shop Replaceable Units (SRUs) at Intermediate Retail Supply Level(s)

Tertiary Impacters of Operational Availability Critical LRUs Within Redundant Configurations Stock Availability of Critical Items at Centralized Supply Level Administrative & Production Lead Times of Replacements (washouts, losses or non-returns) Percentage of Critical Item LRUs Repaired at Depot or Contractor Repair Facility Depot Level Repair Cycle Time Back Order Duration Time of Critical Item SRUs

System Effectiveness Product Effectiveness Probability System is Available to Accomplish Mission Support e.g. Operational Availability Readiness Rate Sortie Rate System Effectiveness Probability System Lasts Mission Without Failing Probability System Performs Appropriately In Mission Reliability Mission Basically Contractor Responsibility Typically Government and Contractor Responsibility Performance System

Relationship of RMS & Availability to System Effectiveness Capabilities Functions Priorities System Performance Reliability Maintainability Product Effectiveness Support Effectiveness Mission Use Supply Spares Mix Maintenance Concept Support Process Times Operations/Uses Efficiency Support Design for Supportability e.g. Logistics Response Times Impact of ILS Elements System Effectiveness Basically Contractor Responsibility Typically Government and Contractor Responsibility Supportability e.g. Operational Availability Readiness Rate Sortie Rate