BI-BOSS May 2014 CERN Vacuum Controls Quality Management

Slides:



Advertisements
Similar presentations
Configuration management
Advertisements

Software change management
Configuration management
HP Quality Center Overview.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Tools and Services for the Long Term Preservation and Access of Digital Archives Joseph JaJa, Mike Smorul, and Sangchul Song Institute for Advanced Computer.
An overview of the CERN CMMS
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Thomas Baron CERN Infor EAM User Meeting 26 June 2013.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Professional Informatics & Quality Assurance Software Lifecycle Manager „Tools that are more a help than a hindrance”
This chapter is extracted from Sommerville’s slides. Text book chapter
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Barriere O, Le Roux P
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Configuration Management (CM)
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
 Mathias Dutour / UAB Dev. team  UNICOS regular meeting  29 January 2009.
AGH TRAINEE AT 01 JULY – 30 SEPTEMBER INTRODUCTION 1. CERN 2. Vacuum Group 3. ICM Section 4. My tasks 2Magdalena Karpiel.
Elder Matias, Diony Medrano, Dong Liu (At Michigan State University - Nov 2011) IRMIS at CLS.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Jean-Roch Vlimant, CERN Physics Performance and Dataset Project Physics Data & MC Validation Group McM : The Evolution of PREP. The CMS tool for Monte-Carlo.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
Review of the processes released in the framework of the MMP Goran Perinić.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
Industrial Control Engineering ADE Rapid Application Development Environment.
Overview of Basic 3D Experience (Enovia V6) Concepts
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Vacuum Controls Quality Management
AMMW 2013 CERN Vacuum Controls Quality Management
CV PVSS project architecture
Georgia Gkioka TE-VSC-ICM National Technical University of Athens
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Software Developer for Vacuum Control System (BE3528)
E. Manola-Poggioli 05 December 2001 EDMS doc
Configuration management
Presentation transcript:

BI-BOSS May 2014 CERN Vacuum Controls Quality Management Fabien ANTONIOTTI TE-VSC-ICM 2014-05-27 Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Outline Strategy: Targets and Tools Standardization: Naming Convention Tracking Issues and Actions: VTL Asset Tracking: MTF Document Management: EDMS Topology: Layout Service & Controls Settings: Controls Configuration Service Processing an issue Timeline & Resources What else? Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Strategy: Targets and Tools Actions Tracking Assets Tracking Documentation Management Topology & Ctrls Management Target: Requests Reports Examples: Cabling Installation Repairs Target: ID (serial #) Behavior Lifetime Examples: Manufacturing steps Measurements Radioprotection Changed location Target: Technical knowledge Examples: Procedures Activity Reports Various information Target: Location Function Configuration Examples: Position Devices Settings Interlock Levels Cables Profibus Addresses Alarms Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Standardization: Naming Convention Essential for VTL, MTF, EDMS, Layout DB Is the 1st step towards homogenization: Each machine had a ≠ naming convention… But objects are interchangeable between machines 314 new codes (names) created: mostly inspired from VAC LHC usage Now integrated in Accelerators Naming Portal (EDMS1149103) For coherent/uniform use in: MTF (using LHC Quality Assurance Definition) Layout DB Documents VAC_DB Controller CPS SPS LHC VAC_DB NEW TPG300 VGC VRGC VRGP VRCG VRGPT300 Volotek VGCD - VRGA VGHC VRGPK HCVRGPT300-PF000001 HCVRGPT300-PF000001 VRGPT300 VRGPT300 VRGPT300 Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Tracking Issues and Actions: VTL Vacuum-controls Tracking Log http://cern.ch/VTL In production since Jan-2013 Stores all requests, managed by tickets To avoid spamming phone-calls/mails Implemented using REDMINE application: Based on programming language RUBY is a Web interface to a MYSQL Database Robust & customizable Widely used by Universities cost-free This is not a document/file repository (use rather EDMS, MTF, etc.) Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Using VTL Automatic Notification according to the subject to the contact persons (and their backups) Currently 1 800+ issues created 1300 using Industrial support (FSU) Analysis of the FSU activities: requests weekly planning validation of weekly reports checks of typical execution times performance evaluation verification of invoices (FSU weekly reports imported in VTL by script) Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Manufacturing and Test Folder (Infor EAM) Asset Tracking: MTF Manufacturing and Test Folder (Infor EAM) http://mtf.cern.ch Campaigns started Jan-2012: Labeling with Part-ID: Using specific/technical labels from BradyTM 1D: Code 128 (38.10 x 12.70 mm) 2D: Datamatrix (9 x 9 mm) Ongoing in LHC, Labs, Storage: ~13 500 labels (~ 60% of ICM total ~23 000) Chain verification: Measurements, Calibrations & Updates All TPG300 in LHC: 1 500+ items tested & identified (2 700 labels) MTF Implementation: Definition of proprieties & steps for each device type Imported information/data for ~4 500 assets (~30% of ICM total ~15 000) Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Document Management: EDMS Engineering Documentation Management System http://edms.cern.ch Is a Product Lifecycle Management platform Based on a commercial product: Agile PLM (Oracle) Engineering / equipment data and documentation (drawings, CAD, procedures, NCR…) are: Safeguarded & Organized Access Rights & Visibility : collaborative, sharing & protecting work Verified Approval Processes & Versioning Retrievable on the long-term Knowledge transfer between generations Since 2011: large effort to collect/produce docs & store them in EDMS New context TE-DEP-VSC-ICM created By Oct-2013: more than 210 documents created 76% use the ICM context Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Topology: Layout Service http://layout.web.cern.ch Controls settings: Controls Configuration Service https://cern.ch/service-co-config Already now for LHC, Layout views are directly used in VAC DB to produce the configuration files for PLCs & PVSS We are now working on the definition of: Functional positions: eg. “VRGPT.UA87.0108” or “VGPB.A4R8.R” Relationships/connections/hierarchies between Functional Positions Settings of the controls devices, attached to the FP, e.g. alarms, middleware… Level of details in the control chain In the future: UNICOS specifications will be produced directly from Layout DB and CC DB combined Applications to extract and format the information will be available Penning gauge TFA3 Cable Penning card TGP300 (interlocks) Profibus card (address) PLC Interlock cables Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

VAC DB synchronization Using QM tools Manual Actions Links LINKED LINKED Repair request for a TPG300 Identity, History HCVRGPT300-CR000001 Documents? NCR, procedures? Chain? Hierarchy, Settings? Actions ex: measurements Worksheets generated Problem found TPG300 replaced Request RP check on HCVRGPT300-CR000001 MTF link updated LINKED HCVRGPT300-CR000001 replaced by HCVRGPT300-CR000002 VAC DB synchronization Comment “NCR#9999999 initiated” Status “For repair” HCVRGPT300-CR000001 NCR#9999999 created and linked Close the case Repaired (Jobs) Status “Stored” NCR#9999999 closed PLC files PVSS files Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Standardization: SCADA SCADA Data-Servers: in 2012, migration from Windows to Linux & physically moved into the CCR building SCADA application: updated from version 3.6 to 3.8 in 2011 upgraded from version 3.8 to WinCC®-OA 3.11 in 2014 integrated and operational in the CCC (CERN Control Centre) new functionalities incorporated (e.g. MOON by EN-ICE) Tracking: Software Versioning service (SVN) used since 2012 all improvements & changes listed and sent to the users most important actions described in detail and recorded in EDMS Collaborations & Exchanges with: other Groups at CERN and outside Institutes EN-ICE (SCADA support) BE-CO (Data-Servers support) IT security team (“TN Disco test” held on Mar- 2013 & Jan-2014) Next Steps: SCADA archiving to be moved to an external and independent Oracle server preparation to a full convergence towards the CERN UNICOS framework, tailored for vacuum (partner­ship between VSC-ICM, GSI and Cosylab, laun­ched by EN-ICE) Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Timeline 2015 – 17 ICM QM in production Finalize structure 2012 – 14 Upload data to DBs (MTF & Layout & CCDB) Migrate VAC-DB to Layout-DB First version the VAC-UNICOS framework 2012 – 14 Implementation: naming convention Tracking and information treatment: development and commissioning; Collect and update detailed information Extensive labelling of assets Modifications and consolidations Manpower peak 2018 LS2 (second LHC Long Shutdown): consolidation & upgrades Deploy and commission VAC-UNICOS framework on LHC and its injectors Manpower peak 2010 – 11 QM-Plan: definition of the requirements Information: collection and centralization VAC-DB and SCADA: ergonomics & productivity improvements Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Only technical aspects Resources Up to 3.5 FTE The total: 230 men-month Only technical aspects of the Project Avg.: 2.7 FTE / year Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Resources The human factor is important: all the activities are concerned by Quality Management needs an underlying attitude and philosophy of work Essential activities perceived as time-consuming/tedious: information retrieval & recording equipment labelling tracking of actions (detailed and accurate) The QM plan may be delayed / compromised due to lack of: guidance motivation understanding Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Conclusion Everybody is involved in some way Well advanced: Homogenization: Naming Convention, methods & tools Centralization of information: actions, documentation, devices settings Preservation of knowledge Simple but efficient to maintain system up-to-date Still to be done: Labeling of assets (< 50 %) Asset data importation into MTF (~70 %) Definition of templates with keywords (NCRs, Jobs) Definition of vacuum controllers in Layout DB (In progress) Renovation and definition in Controls Configuration DB (In progress) Key points: Common/standard applications already widely used/supported at CERN Information availability, openness, transparency According/Conforming to the CERN MMP recommendations Everybody is involved in some way in aspects contributing to the improvement of QA Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27

Thank you for your attention ! Contact: fabien.antoniotti@cern.ch References: F. Antoniotti, “Status on the Quality Management of CERN Vacuum Controls ”, EDMS#1329683, AMMW13, Geneva, Nov-2013 F. Antoniotti et al, “Quality Management of CERN Vacuum Controls”, EDMS#1317779, ICALEPCS13, S. Francisco, Oct-2013 F. Antoniotti et al., “Developments on the SCADA of CERN Accelerators Vacuum”, EDMS#1317778, ICALEPCS13, S. Francisco, Oct-2013 F. Antoniotti, “Quality Management Plan in Vacuum Controls section”, EDMS#1310709 BI-BOSS 2014 Fabien ANTONIOTTI, CERN - TE-VSC-ICM BI - Beamline Operational Spares Strategy: ICM Quality Management, 2014-05-27