Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
BoRit Superfund Site Timeline
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Further Site Investigation Sutton Walls Former Landfill
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
Presentation to: Technical Advisory Committee Onondaga Lake.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
General Information on Florida’s Cattle Dip Vats.
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Contaminated ‘Brownfield’ site in south-eastern Michigan By Zhanyuan Cai And William Chow.
Gwinnett County’s Post Development Stormwater Management Program
DuPont Barksdale and Chequamegon Projects Update December 12, 2007 DuPont CRG Great Lakes Visitors Center.
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
Former DuPont Barksdale Works Project Update August 3, 2005 DuPont Corporate Remediation Group Great Lakes Visitors Center.
HONR 297 Environmental Models Chapter 2: Ground Water 2.3: Typical Quantitative Issues.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Former DuPont Barksdale Works Project Update December 14, 2005 Great Lakes Visitors Center DuPont CRG.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
DuPont Barksdale and Chequamegon Projects Update July 22, 2008 DuPont CRG.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
California Integrated Waste Management Board 1 Tracy Tire Fire Site Status Report Todd Thalhamer, P.E. December 2005 Agenda Item 11.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Results of 2001 Barksdale Site Investigation April 2, 2002 Presented by: DuPont Corporate Remediation Group.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
Melissa Boggs California Department of Fish and Wildlife, Office of Spill Prevention and Response.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
PORT OF TACOMA. [Insert Project photo as background] Project Update Parcel 88 Combined Habitat Project.
Former Naval Fuel Depot Point Molate December 8, 2014 Summary of IR Site 3 Remediation and Abatement Work to Date Point Molate Naval Fuel Depot Richmond,
Unity Ground Water Investigation Steve Faryan, USEPA.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
Proposed Plan for No Further Action
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Groundwater Remediation Status
Niagara River Area of Concern
Chemical Metals Industries, Inc. (CMI)
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Presentation of 2002 Barksdale Investigations and Path Forward
Chemical Metals Industries, Inc. (CMI)
Harbour Island Force Main Replacement
the path less traveled Termination of Post Closure Care
Presentation transcript:

Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center

December 14, 2004Former DuPont Barksdale Works Project Update2 Purpose of Presentation n Provide an update on alternative water supply work completed since early November. n Present a summary of other site work completed in 4Q2004.

December 14, 2004Former DuPont Barksdale Works Project Update3 DuPont Company Representatives n Brad Nave – Project Director, DuPont Corporate Remediation Group (CRG) n Cary Pooler – Project Manager, URS Corporation

Alternative Water Supply Project

December 14, 2004Former DuPont Barksdale Works Project Update5 Pipeline Construction Update Alternative Water Supply n Approximately 48,600 feet of main (ductile iron pipe and HDPE) and service lateral (copper line to homes) is specified in the current design. n To date, approximately 95% of the pipeline project (based on lineal footage) has been constructed. – All pipeline mains have been completed (6.25 miles). Final section of main was hydro tested on October 29th. – 86% of the laterals have been completed (~14,300 feet); 5 lateral installations remaining. – 19% of eligible homes are using municipal water (9 current connections).

December 14, 2004Former DuPont Barksdale Works Project Update6 Main completed Main to be completed Barksdale Municipal Water Project Main Pipeline Completed as of October 29, 2004

December 14, 2004Former DuPont Barksdale Works Project Update7

December 14, 2004Former DuPont Barksdale Works Project Update8

December 14, 2004Former DuPont Barksdale Works Project Update9

December 14, 2004Former DuPont Barksdale Works Project Update10

December 14, 2004Former DuPont Barksdale Works Project Update11 Pipeline Construction Update Alternative Water Supply n Majority of construction will be completed by the end of calendar year 2004, assuming: – No regulatory delays. – Outstanding contractor performance (construction and safety). – Tolerable weather. – No unforeseen or unmanageable technical issues. n Anticipate completion of most of the remaining service lateral lines and final hook-ups during the next several weeks. n A few private properties will have to be fully restored (final grading and seeding) in 2005, due to weather issues. Also, the road restoration in Birch Grove will be completed in 2005 per Barksdale Township’s request. n Wetland issues at two properties have yet to be resolved; therefore, these lateral lines may be completed in 2005.

December 14, 2004Former DuPont Barksdale Works Project Update12 Final Connection made Lateral Connections Remaining

Other Barksdale Site Work

December 14, 2004Former DuPont Barksdale Works Project Update14 Residential Monitoring n A new detection of 2,6-DNT was reported as part of the August data set. – Result estimated by lab due to low concentration. – Result was below Wisconsin Enforcement Standard. – Potentially affected home hooked-up to municipal today. n Carbon filters continue to be effective. n Official report of results will be issued shortly.

December 14, 2004Former DuPont Barksdale Works Project Update Debris Removal n Inspected 275 acres, primarily along ditches and creeks, for debris remaining from plant activities. n Identified numerous items, which included drums, pipes, sheet metal, equipment parts. n Screened items found for explosive residues. None found. n About 45 items removed to off-site landfill. Additional recovery work will be conducted in 2005.

December 14, 2004Former DuPont Barksdale Works Project Update Debris Removal – typical items

December 14, 2004Former DuPont Barksdale Works Project Update17 Site Investigation – Fall 2004 n Field Activities (Sept. – Nov.): – 16 soil borings sampled. – 11 new wells installed. – 36 wells sampled (25 existing and 11 new). n Preliminary findings: – Groundwater conditions near site boundary and burning ground appear stable. – No site related chemicals found below western TNT refining buildings. – Two new groundwater contamination source areas for east central plume identified; however, concentrations of site-related chemicals are low when compared to the Former Burning Grounds.

December 14, 2004Former DuPont Barksdale Works Project Update18 Miscellaneous Site Work n Continuing work with Adventus to evaluate a new generation of soil amendments to reduce concentrations of nitroaromatic/nitramine compounds in soil. – Generation 3 product uses nano-scale zero valent iron. – Preliminary results pending. n Continuing Georgia Tech research on destruction of DNT and TNT.

December 14, 2004Former DuPont Barksdale Works Project Update19 Home Value Protection Program n Three homes purchased to date. Two have been resold. One home demolished. n Home Value Protection Program will remain in effect until six months after alternative water is available. – Property owners will be notified in early 2005.

December 14, 2004Former DuPont Barksdale Works Project Update20 Questions or comments?