GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Job Creation, Skills Development and Empowerment in Road Construction Rehabilitation and Maintenance.

Slides:



Advertisements
Similar presentations
Presentation of the proposed Annex 19 – Safety Management
Advertisements

CIC Scope of Services Frances Paterson & Tony Broomhead.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
GAUTRANS DEPARTMENT OF TRANSPORT & PUBLIC WORKS ROAD PAVEMENT FORUM AUGUST 2000 GAUTENG DEPARTMENT OF TRANSPORT & PUBLIC WORKS.
Construction Industry Development Board development through partnership “Towards Uniform Conditions of Contract and Specifications in South Africa” South.
ESSnet STAND-PREP Work Package 2. WP2: Aim Systemise standards other than statistical methods and examine issues in the adoption of standards. Consider.
DEBI HOLTMANN SKILLS DEVELOPMENT ACT THE CONSTRUCTION SETA (CETA)
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Department of Public Transport, Roads and Works Labour intensity Strategy and Framework for the Implementation of Infrastructure Projects in Gauteng Road.
Promoting & Supporting SME Development: The case of Madagascar and Kenya Paul Malherbe Chief Operating Officer: Technical Assistance – Mentorship and Consulting.
CREATING OPPORTUNITIES – JOB CREATION WITH THE THIRD SECTOR LEARNING FROM COMMUNITY JOBS SCOTLAND Alex McTier 18 th September 2013.
Project Human Resource Management
COTO Road Materials Committee (RMC) Towards National Specifications Road Pavement Forum 07 November 2006 Elzbieta Sadzik.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
1 THE EXPANDED PUBLIC WORKS PROGRAMME 18 NOVEMBER 2003.
Sustainable Construction Strategy Tony Iles. Strategy Aims Raised significant expectations: –“step change in the sustainability” …. “drive continuous.
Technical Recommendations for Highways No 12 TRH 12
EXPANDED PUBLIC WORKS PROGRAMME
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
Diploma of Project Management Course Outline NSW Course Number Qualification Code BSB51407.
OPERATIONAL PROGRAMME Information Society 3rd Community Support Framework for Greece June 2001.
GOVERNMENT OF ROMANIA MINISTRY OF PUBLIC FINANCE MANAGING AUTHORITY FOR COMMUNITY SUPPORT FRAMEWORK Evaluation Central Unit Development of the Evaluation.
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
IASE National Conference Towards a Comprehensive Employment Strategy for People with Disabilities Dermot Mulligan Head of Labour Force Development Division,
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Action Plan Skills Building: Module 1 Getting Started: Preparatory Tasks and Considerations January 2013.
Civilution Congress 2014 CESA: A CODESA of Infrastructure Procurement Panel Discussion Infrastructure Procurement Civilution : Outcomes and Benefits to.
UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME.
PORTFOLIO COMMITTEE 20 OCTOBER 2004 MANAGEMENT OF HIV and AIDS IN THE PUBLIC SERVICE.
SUSTAINABLE LIVELIHOODS – EPWP AND TOURIST GUIDES 23 AUGUST 2011.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
6 June 2005Community Sector Funding Policy building our city building our community ACT Government Lee-Anne Aldwell Manager ACT Government Procurement.
Presentation to HAUC (UK) Wednesday 30 May 2012 RINA London.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
ABSTRACT Title: Developing National Formularies Based on the WHO Model Formulary Authors: Tisocki K 3, Laing RL 1, Hogerzeil H 1, Mehta DK 2, Ryan RSM.
PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
The EPWP and Conditional Grants in the Division of Revenue Bill 7 March 2006 Department of Public Works.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Legislation.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
The RDI Governance System Vasileios Pitsinigkos Head of Managing Authority of Eastern Macedonia - Thrace Region.
Ministry of Economy, Energy and Tourism 1 OP Competitiveness Progress of Implementation 2010.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
EIGHTH ROAD PAVEMENTS FORUM Programme and Status of Resolutions.
1 Progress Report on the Participation of the SETAs in the EPWP 17 November 2004.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
I Public Works I Parliament I Cape Town 1 Presentation to the Standing Committee on Appropriation 10 November 2015.
INTERACTIVE TRAINING ON IDP FOR COUNCILLORS ________________________
Roads and Transport Limpopo 02 August Infrastructure Budget allocation for 2011/12 Upgrading of roads=R770,273m Preventative maintenance= R375,
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
EPWP INFRASTRUCTURE PERFORMANCE INCENTIVE GRANTS TO PROVINCES AND MUNICIPALITIES Standing Committee on Appropriations and Portfolio Committee on Public.
DWAF: WATER SERVICES Regulations: Report to Portfolio Committee on Progress 23 May 2001.
Road Pavement Forum 11 May 2006 Elzbieta Sadzik APT Steering Committee.
ROAD PAVEMENTS FORUM CSIR CONFERENCE CENTRE 7/8 August 2000 Final Session.
Co-operation and co-ordination mechanism in guidance practise and policy development Cross-policy coordination at national level.
1 A Transformation Framework cidb National Stakeholder Forum 29 March 2016.
ITCILO/ACTRAV COURSE A Capacity Building for Members of Youth Committees on the Youth Employment Crisis in Africa 26 to 30 August 2013 ILO Instruments.
1 Writing good proposals. 2 What makes for a good OR proposal?
1 HSRC EPWP SEMINAR 07 JUNE 2016 Presentation by Lulu Mdletshe EPWP Co-ordinator: Department of Transport.
SMS Implementation Lessons Learned. 2 Sources ICAO Regional Workshop on Safety Management Systems (SMS) and State Safety Programme (SSP) Implementation.
GUIDELINES Evaluation of National Rural Networks
Incentive Grant Public Works Appropriation's Committee 29 June 2011
Labour Intensive Construction; Opportunities for Transformation cidb National Stakeholder Forum 29 March 2016.
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Accreditation Update Regional Municipality of Durham March 15, 2018.
European Semester Autumn Package
POVERTY ALLEVIATION INTERVENTIONS
Programme for Employability, Inclusion and Learning
Presentation transcript:

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Job Creation, Skills Development and Empowerment in Road Construction Rehabilitation and Maintenance Road Pavements Forum 6 May 2008

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Background  EPWP  Employment opportunities and training for >1 million unemployed in 5 years  Increased labour content on government funded projects  Application of appropriate labour-intensive technologies  Focus on low volume roads, pipelines, stormwater drains and urban sidewalks  Perception of inferior quality, cost and productivity  RAs generally only allocates LVRs to LIC&M at the exclusion of the larger projects to minimise risk  Developments in LIC technologies, labour optimisation and project management techniques have improved significantly  Now possible to integrate labour as a critical & measurable component for the whole of the road construction sector  GDPTRW best-practice guideline for formal and emerging sector to promote sustainable job creation and empowerment in all road construction, rehabilitation and maintenance projects  Previous HVS tests on LIC sections

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Project Team  GDPTRW  E Sadzik  Project Manager  R Kuhn/L Sampson  Authors/Contributors  J Hattingh  R McCutcheon  B Perrie  CSIR various (coordinated by P Paige-Green)

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Scope of Manual  To provide guidance to Road Authorities and their Consultants on:  Optimal labour components for specific design elements;  Appropriate contract documentation, specifications and tender evaluation procedures to encourage the use of labour;  Legal requirements related to the employment of unskilled and semi-skilled labour;  Quality and cost of labour related to group tasks and group balancing:  Training, mentoring and incubation programmes including the current requirements

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Benefits  Optimisation of the use of labour on all projects (new construction, rehabilitation and maintenance);  Increased sustainability of job opportunities through the optimisation of labour on all projects;  Increased use of appropriate labour -intensive technologies;  Increased involvement by the formal construction sector in job creation and mentoring of emerging contractors;  Improvement in performance of the emerging sector through, training, mentoring and incubation

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Document Structure  An introduction  Purpose and philosophy behind labour optimisation;  Project selection criteria  Highlight the type of construction activity  Relevance and appropriateness to labour-intensive construction  Indication of the typical employment potential of various road construction activities (details are also provided in Appendices 2 to 26);  Pavement Design  Philosophy  HVS testing  Material selection  Advice on suitable contract documentation, specification and tender evaluation procedures  Standard forms of contract are provided in Appendix 27  Guidelines on the legislation, labour requirements and organisation of projects including calculations of the required labour force  Additional information and calculation examples are provided in Appendices 31 to 34  Training, Mentoring and incubation

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Labour Optimisation

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Sustainability of job creation  Current programmes (eg EPWP)  Jobs created were temporary  Skills lost  Manual encourages the creation of sustainable skills and jobs for the road sector through:  Increasing the total labour input on all projects;  Increasing the skills levels of emerging contractors and labour through training, mentoring and incubation;  Funding of labour-intensive programmes through the Departmental budget rather than ad hoc special programmes;  Involving the formal construction industry in labour- intensive construction, in joint venture with the emerging contractors

GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Status of Document  Final comments and editing being included  Draft document available for review by (16 May)  Circulation of document to reviewers for comment (return end June)  Incorporation of comments (end July)  Launch of document (August)