1 Scheduling the TVA Hydro System Using RiverWare’s Optimization Suzanne H. Biddle, P.E. Tennessee Valley Authority.

Slides:



Advertisements
Similar presentations
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
® Cumberland River Basin 2007 Hydrologic & Hydraulic Drought Joy Broach – Aquatic Biologist Planning Branch - Environmental Section SWPBA Tennessee November.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
Aspinall Unit Seasonal Operation Goals Fill Blue Mesa Reservoir before end of runoff. Operate to the 2012 Aspinall ROD at the Whitewater Gage. Meet the.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
THE NICKAJACK DAM $74 million for a lifetime of cheap power, flood control, and recreation.
Climate and Management Alternatives in Snake River Basin Nathan VanRheenen and Richard N. Palmer Dept. of Civil and Environmental Engineering University.
June 26, PCWA - Middle Fork Project Project Operations
BUILDING STRONG ® South Platte CWMS Model Missouri Basin Forecasters Meeting January 29, 2014 South Platte CWMS Model Missouri Basin Forecasters Meeting.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Colorado Basin River Forecast Center Water Supply Forecasting Method Michelle Stokes Hydrologist in Charge Colorado Basin River Forecast Center April 28,
Reservoir and Diversion Data CBRFC Stakeholder Forum July 31, 2012.
Tennessee Valley Authority
Federal Columbia River Power System Operations Planning.
THE MISSISSIPPI RIVER. General facts: Third largest drainage basin in the World The Mississippi drains 1/3 of USA and a small part of Canada. Second longest.
Dr. David Ahlfeld Professor of Civil and Environmental Engineering The Westfield River Basin Optimization Model Demonstration:
WATER ISSUES IN THE EASTERN EUROPE:
Use of GIS in Determination of the Probable Maximum Flood at Nuclear Plant Sites Presented by: Monica Anderson, GISP Tennessee Valley Authority Carrie.
Applying Methods for Assessing the Costs and Benefits of CCA 2 nd Regional Training Agenda, 30 September – 4 October 2013 Priyanka Dissanayake- Regional.
Barbara Tolić, HEP Trgovina d.o.o. SEECOFF , Belgrade.
Seasonal Forecasts in Ethiopia: Hydropower, Ag-Econ & Flood Modeling NASA GHA 1 st Participatory Research Workshop and Project Meeting Addis Ababa 12 August.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
1 System planning 2013 Lecture L8: Short term planning of hydro systems Chapter Contents: –General about short term planning –General about hydropower.
Deksyos Tarekegn National DSS Specialist - Ethiopia
MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October.
ESET ALEMU WEST Consultants, Inc. Bellevue, Washington.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative Geneva, 8 – 10 December 2009 Flood Forecasting Issues in Ghana by J. Wellens-Mensah.
Engineering Hydrology (ECIV 4323)
James VanShaar Riverside Technology, inc
Modeling Development CRFS—Technical Meeting November 14, 2012.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Integrating tools to scope coordinated reservoir-floodplain management for climate resilience Jeff Opperman and Andy Warner, The Nature Conservancy.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
WISKI Open Water and Ice Bernard Trevor, M.Eng. P.Eng. River Forecast Section Environment and Sustainable Resource Development WISKI ESRD Users Conference.
Multiple Purpose Dam & Reservoir
Resource allocation and optimisation model RAOM October 2003.
St. Johns River Water Management District Hydrologic Modeling in Orange Creek Basin Hydrologic Modeling in Orange Creek Basin Dale Smith, P.E. Bureau of.
Fairy Lake Annual General Meeting Dave Macpherson Water Management Technical Specialist Parry Sound District Ministry of Natural Resources.
Tennessee River Systems Mississippi, Tennessee, and Cumberland River What are the major river systems of Tennessee? (7.3.3)
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
What is OASIS? Water resources simulation/optimization model
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Tennessee River Systems Mississippi, Tennessee, and Cumberland River What are the major river systems of Tennessee? (7.3.3)
Multi-objective Optimization
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
NATIONAL WEATHER SERVICE JACKSON, MS NEW ORLEANS/BATON ROUGE, LA Pearl River Basin Watershed Town Hall March 17, 2015
Model Overview Application of CALSIM II to Friant System.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Exploring Hydroelectric & Tidal Power. What is Hydroelectric & Tidal Power Hydropower is the using of the force of moving water to generate electricity.
Guide Curve Operations Partition reservoir storage into “pools” Each pool has a separate purpose Release (or avoid releasing) water to reach the “guide.
WATER RESOURCES DEPARTMENT
Ten Reasons to Use South Carolina’s Surface Water Quantity Models
Engineering Hydrology (ECIV 4323)
Upper Snake Reservoir Operations October 13, 2015
The Aral Game.
Drought Response Workshop
A sequential Simulation-Optimization Model for Water Allocation from the multi-Reservoir System in the Karkheh River Basin System, Iran M. Fereidoon1,2.
Information content of weather predictions for flood-control in a Dutch lowland water system Steven Weijs December 9, 2018 Section Water Resources Management.
Preciptation.
Engineering Hydrology (ECIV 4323)
Engineering Hydrology (ECIV 4323)
Integrating tools to scope coordinated reservoir-floodplain management
Presentation transcript:

1 Scheduling the TVA Hydro System Using RiverWare’s Optimization Suzanne H. Biddle, P.E. Tennessee Valley Authority

2 HL KNOXVILLE NASHVILLE CHATTANOOGA TN KY NC SC GA AL MS VA Watershed Power Service Area TVA region covers 40,000 sq miles

3 Average annual rainfall above Chattanooga is about 51 inches and runoff is about 22 inches

4 TVA operates the reservoir system to meet multipurpose objectives Navigation Flood damage reduction Power generation Recreation Water quality Water supply

5 Inputs Future value of water Hourly hydropower value Inflow forecast Initial conditions Objectives hourly generation preschedule (current day + 2 forecast days) 9 day optimization using marginal costs for water allocation daily hydro forecast (14 days) 9 day optimization using block costs for daily generation schedule 3 day optimization using block costs for hourly generation schedule River Scheduling issues two hydro forecasts each day

6 Current Day Observed Values Days Future Value of Water Days RiverWare 6-Hourly Forecast 14 Days RiverWare Hourly Preschedule 2 Days Optimization covers short term, but also considers long term tradeoff

7 Many reservoirs follow seasonal guide curves

8 These objectives are used in optimizing the hydro system Day 1 outflows are fixed Ending targets are fixed for non-storage tributaries and main river Minimum flow requirements Top and bottom of daily operating zone – non-storage tribs and main river only Minimum operations guides Flood guides Minimize spill Special operations Economic objective function

9 What does “economic objective function” mean? All operating constraints must first be satisfied Then, with any remaining flexibility: Maximize avoided operating cost + delta (value of water in storage)

10 Is water worth more this week or in future weeks?

11 After water is allocated, block cost data is used to determine which hours to run

12 The reservoir system is modeled as a whole for hydropower optimization