Heath and Safety Contractor Induction. AUTHORISATION TO WORK I On arriving at site, please contact your host via Reception Your host will provide a full.

Slides:



Advertisements
Similar presentations
Michael Smith, Safety Manager. FIRE SAFETY The main object of the fire safety arrangements is to save life. The fire alarm procedure should be followed.
Advertisements

Background Presenters Work done in preparation for WHS changes
Welcome to … The safety of all individuals working, or visiting the … facilities is of great imporatance to us and is our one priority. We would request.
(Company) Induction. Policies These can be found on all notice boards and you must spend the time to read them. Company have the following Policies: Health.
Fire or Emergency Procedures.  Fire or Emergency Procedures Please read the blue and white notices provided throughout the University These give details.
Emergency Evacuation Zayed University, Dubai Campus.
Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
Safety & Security Contractor Induction Property Management.
Fire Marshal & Medical Emergency Training Please Sign In
FLOOR WARDEN TRAINING Presented by State Risk Management 2011.
Fire evacuation information. Procedure on finding a Fire Sound the Fire Alarm by activating the Fire Alarm system Evacuate the building and proceed to.
INDUCTION Welcome to the Victorian Association of Performing Arts Centres (VAPAC) and Darebin Arts & Entertainment Centre’s (DAEC) Emergency Procedure.
Personal Emergency Evacuation Plans PEEPS
Heath and Safety Contractor Induction. AUTHORISATION TO WORK No work should be carried out unless you have been given authorisation from your host Contact.
6/27/20111 Emergency Evacuation Plans And Exit Routes Training Program NEW YORK MEDICAL COLLEGE Environmental Health and Safety Department.
Student Health & Edinburgh Napier University Health & Safety Team | Edinburgh Napier University.
Student Briefing College Of Engineering February 2011.
KUSU Commercial Services Student Staff Training Module 5 Fire Safety.
INDUCTION Welcome to the Victorian Association of Performing Arts Centres (VAPAC) and Frankston Arts Centre venue Emergency Procedure induction The Frankston.
© University of Reading Dec 2009 Health and Safety Induction For Working at Height University of Reading.
KING’S COLLEGE LONDON FIRE SAFETY INDUCTION EXPLAIN:  The purpose of the weekly alarm test and what it sounds like  Frequency of fire drills  College.
KING’S COLLEGE LONDON FIRE SAFETY INDUCTION  Weekly fire alarm tests  Frequency of fire drills  College Regulations  Building Emergency Plans FIRE.
Department of Automatic Control & Systems Engineering Safety Induction.
NEC Site Induction: Organiser & Contractor Construction (Design & Management) Regulations CDM.
Fire Safety Awareness for Students Be safe – stay safe. Check that you have understood the presentation and attempt the following questions. Please choose.
Health and Safety Information Wellington Campus 2013.
AWARENESS Make yourself familiar with fire exits, break glass points and extinguishers The fire assembly point is marked and can be found in the car.
Heidi Alderton, School Safety Advisor. IN CASE OF FIRE: Sound the alarm by breaking the nearest Break Glass point (located in each stair well) Notify.
Health and Safety Induction. Health and Safety Introduction Health and Safety Structure Health and Safety Policy Employee Responsibilities.
Fire evacuation information – Woodhill House
Indian Ridge Middle Safety and Emergency Plan
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
CDM Site Induction. Welcome to the ICC. Contents CDM Who’s who Welfare Hall Access Policy Site Rules Emergency Evacuation.
Emergency Action Plan What to do in the event of an emergency.
CDM Site Induction SCS FORMULATE HALL 1, RICOH ARENA 15 – 16 NOVEMBER 2016 CDM SITE INDUCTION.
NEC Site Induction: Organiser & Contractor
Evacuation Diagram – Reception
Health and Safety Induction
Student Health & Edinburgh Napier University
Fire or Emergency Procedures
2016 General information and resource training module
Student Health & Edinburgh Napier University
Information for Students
Health & Safety Team | Edinburgh Napier University
Health & Safety Team | Edinburgh Napier University
Health & Safety Team | Edinburgh Napier University
Health and Safety Induction
Fire or Emergency Procedures
Information for Students
Student Health & Edinburgh Napier University
Information for Students
EMERGENCY In case of an emergency DO THIS EVACUATION FIRE
Health and Safety Induction
Cleaner Colleague Induction Tour: Trainer Guide
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Information for Students
Health and Safety - Richard Quenby
Information for Students
Fire Safety St John’s Campus
Fire Safety City Campus
Online Volunteer Work Health & Safety Induction
Presentation transcript:

Heath and Safety Contractor Induction

AUTHORISATION TO WORK I On arriving at site, please contact your host via Reception Your host will provide a full health and safety induction A risk assessment must be completed and all relevant training certificates submitted prior to any work taking place Where a permit to work is required, no work shall commence until the permit has been authorised and issued by the College Representative. It is the contractors responsibility to view the Asbestos register – a copy is available on reception Obtain your Contractors Pass – this must be worn at all times

AUTHORISATION TO WORK II Please work in designated areas only, as identified by your host Whilst undertaking work, please report any issues to your host immediately On completion of your work, please notify your host and sign off all relevant permits and risk assessments On leaving site, your Contractors Pass must be returned to Reception

WORKING SAFELY All Contractors must adhere to the RNCM Contractors Code of Conduct. If you have not seen a copy of this you should request a copy and read through it before starting any work If given a corrective action from the College you or your management must take action immediately

EMERGENCY PROCEDURES - FIRE On hearing the fire alarm: If a continuous alarm tone sounds, evacuate the College by your nearest, safest exit and proceed to the fire assembly point on the over ground car park (marked on the College Plan) On discovering a fire: Raise the fire alarm using a break glass point Proceed to the fire assembly point on the over ground car park (marked on the College Plan) Remain at the fire assembly point until given an instruction to return to work Tests / Drills Contractors will be notified of any fire alarm tests or evacuation exercises on arrival

RNCM FIRE ASSEMBLY POINT & FIRE EXITS New Library Building Sir Charles Groves Halls Of Residence Reception Area Main RNCM Building Booth Street West Car Park Assembly Point Rosamond Street STUDIO THEARTE OPERA THEATRE LORD RHODES ROOM CONCERT HALL = Refuge Points Oxford Road Wing

EMERGENCY PROCEDURES – ACCIDENT/INCIDENT Report all accidents / incidents to Reception and your host.. For first aid treatment, please call Reception on Extension 300

HOUSEKEEPING & WELFARE Working areas must be cleaned and rubbish removed at regular intervals Washroom facilities are located throughout the college, and are available for contractors to use as required Food must be consumed in the restaurant area only Smoking is not permitted in the College. A smoking shelter is provided on the over ground car park All contractors must ensure that all waste produced on site is disposed of in the correct manner. The College expects all contractors to apply the principles of the waste hierarchy.

Asbestos Location 1 Asbestos board is contained in some of the wall cavities between the offices and rehearsal rooms in the Main Building Level 3. Do not drill or work in these cavities or on the inside walls of the entrance lobby’s to these rooms.

Asbestos Location 2 Asbestos is contained within the material fabric of the Opera Theatre stage fire curtain. This has been sealed and is inspected annually. Do not drill cut or fix anything to the curtain.

Asbestos Location 3 Asbestos cement board is contained in the first 3 light fittings on the upper level of the Opera Theatre disabled seating area. This should not be disturbed. If a fault occurs with any of these fittings, other than a lamp change the asbestos will have to be removed by a licensed asbestos removal company.

THANK YOU FOR YOUR ATTENTION