Update on WITSML deployment in BP - Energistics Public Meeting Dubai, 19 November 2008 Dr Julian Pickering IT Programme Manager Drilling & Completions.

Slides:



Advertisements
Similar presentations
1 The Networked Learning Environment. 2 Blackboards Product Strategy Leading institutions are harnessing the power of information networks to connect.
Advertisements

MKCL's World-class Academy for Vocational Excellence Management Courses MKCL's.
Life Science Services and Solutions
SPE WITSML: Technology to Business (T2B) for the Oilfield J
WITSML in Real Life Applications and Case Studies Zach Barfuss Knowledge Systems May 15, 2008.
Virtual Teams British Petroleum (BP)
Evolution 1. WITSML Life Cycle Timeline Years Version 1.0 Version 1.1 Version 1.2 Version
Bucharest, July 31, 2012 | Bitdefender 2012 Cloud Security for Endpoints Customer Presentation.
Chapter 1: The Context of SA&D Methods
WITSML Office Aggregrator
Using the WITSML™ protocol for analysis in Drillworks – past case studies and current applications Drew Swanson May 11, 2006.
WITSML Update Presentation to Energistics Regional Meeting, London
Update on WITSML deployment in BP - Energistics Public Meeting Houston, 28 May 2009 Dr Julian Pickering Field of the Future Business Deployment.
© Copyright IBM Corporation 2008 Thoughts on Current and Future Trends in Integrated Operations Tony Edwards BG-Group, Head of iValue iE2008 Organising.
Summary from the Strategic Work session Paris May 14th-15th 2007.
1 Copyright © 2008 Accenture All Rights Reserved. U.S. Insurance Company Mergers & Acquisitions Services; Product/Policy/Billing Trans Services Client.
Speaker Introduction John Shields Software Projects Manager, Baker Hughes, Aberdeen 30 years working for Baker Hughes 30 years working for Baker Hughes.
The LOGIIC Consortium Zachary Tudor, CISSP, CISM, CCP Program Director SRI International.
WITSML ® Enables Synchronous Remote Modeling and Surveillance via the Internet William Standifird, Vice President Operations.
FINANCIAL SERVICES INTEGRATION INDUSTRY SOLUTION.
1 © 2008 OSIsoft, Inc. – Company Confidential Customer Cases PI in Oil & Gas British Petroleum.
Summary Device protocols tied intimately to applications. A need to significantly reduce critical data update times. Current network bandwidth consumption.
The future of e-field operations Real Time Operations.
INTEQ Answers While Drilling SM John Shields Director of Software Baker Atlas/INTEQ Houston, TX.
E&pdct Benefits of WITSML to Drilling & Completions Presentation to Energistics 2 nd Annual Standards Summit Houston - 6 th November 2007 Julian Pickering,
BroadbandSuite Unleashing the Power Of Broadband October 15, 2006 Lisa Garza, Member Board of Directors, DSL Forum.
Colour of Ocean Data, Brussels, November 2002 Colour of Ocean Data: Discussion Panel Lesley Rickards British Oceanographic Data Centre.
Baker Hughes & WITSML John Shields Software Projects Manager Baker Hughes Aberdeen.
How eNet4S can benefit your project? eNet4S Software Solution Business Team Chief Technology Officer July 11, 2006.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Classification: Statoil internal Status: Draft
We set the standard Global Topology Well Site Well Site Well Site Well Site Regional Centers Global Center (Technical Specialists) Global Center (Technical.
RBC Supply Chain Solutions. Who we are ? RBC Sourcing provides e-procurement solutions through a unique blend of proven on-demand technologies, affordable.
WITSML Meeting Houston, May 15, 2008 WITSML end to end implementation: Results and way forwards at Total Raphael Henri-Bally, Total Geosciences IT systems.
Sense Intellifield is an independent supplier of products, systems and solutions for real time integrated operations to operators/contractors in the oil.
WITSML status and road ahead in StatoilHydro Energistics meeting june Lars Olav Grøvik.
Real time data in Statoil
Introducing… the Sustainable Energy 4 All Action Accelerator! Adam Cooper Senior Manager, Accenture Sustainability Services United Nations Global Compact.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
WITSML Paris 16-May-2007 Rick Morneau
Shell Exploration & Production Copyright: Shell Exploration & Production Ltd. 6/5/2016 File Title Shell taking the next step with WITSML May 2008 Update.
Kongsberg Intellifield
WITSML Public Seminar and Vendor Exhibition: Welcome Alan Doniger, Energistics CTO May 28, 2009.
WITSML Success & Progress David C. Johnson Product Manager (WITSML) Halliburton/Landmark.
Cloud Market Readiness Report Finance, Media, and Legal Sectors March 2014 Trend Consulting 2013.
Building a Permanent Infrastruture including in e-field operations Real Time Operations.
WITSML™ Drilling Standards Pemex 21 August 2008 Ciudad de México Alan Doniger, Energistics.
Using WITSML to deliver value in BP Presentation to public meeting 16 th May 2007 Dr Julian Pickering, Domain Lead Drilling & Completions BP Research.
Enabling the Digital Campus
Independent, integrated thinking.
WITSML ® Enables Synchronous Remote Modeling and Surveillance via the Internet William Standifird, Vice President Operations.
Encouraging Innovation – Empowerment vs Project Management Process.
1 1 Presenter / date if required Independent, integrated thinking.
e&pdct Using WITSML to deliver enhanced D&C performance in BP Presentation to public meeting 19/10/06 Julian Pickering, Domain Lead Drilling & Completions.
1 Future Consideration for WITSML from Total Products should migrate to the same version of WITSML Need provisions for backup in case of system failure.
Built on the Powerful Microsoft Azure Platform, Forensic Advantage Helps Public Safety and National Security Agencies Collect, Analyze, Report, and Distribute.
Welcome!. State of the company Community Today’s new currency DataFlex, VRW & DAI An invitation The year ahead.
WITSML direction in BP SIG Public Meeting – May 2006 Dr Julian Pickering Domain Lead, Drilling & Completions.
Presenter: Prof. Dimitris Mourtzis Advanced Manufacturing: Industry 4.0 and Smart Systems.
SDN & NFV Driving Additional Value into Managed Services.
READ ME FIRST Use this template to create your Partner datasheet for Azure Stack Foundation. The intent is that this document can be saved to PDF and provided.
Joint CIO Council and HR Deans & Directors Meeting
APPEA 2017 Miranda Taylor CEO.
Creating a culture of innovation
How Smart Networks are Changing Corporate Networks
Julian Pickering, Domain Lead Drilling & Completions
The future of e-field operations
BLACKVARD MANAGEMENT CONSULTING, LLC
Why ENGENIOUS?.
Government Finance Function
Presentation transcript:

Update on WITSML deployment in BP - Energistics Public Meeting Dubai, 19 November 2008 Dr Julian Pickering IT Programme Manager Drilling & Completions

2 Knowledge is the enabler of our business how our collective knowledge is applied makes BP distinct from our competition

3 Increasingly Real-Time −Decisions must be made during operations Increasingly Collaborative −Expertise is often remote from operating centres Increasingly International −Challenges with language, time zones, cultural differences Our business is changing …

4 Information sharing increases knowledge - Fast learning can save 10% in a wells programme Days Fast Learning Sequence Drilled Sequence Drilled Days Days From Spud Application of New Technology Loss of Key Personnel Forgetting Curve No Learning Sequence Drilled Days Sequence Drilled Slow to Learn Sequence Drilled Sequence Drilled

5 Why is WITSML important to BP? is the result of an industry collaboration to update the widely used American Petroleum Institute WITS standard for moving drilling data between rig and office based computer systems. is the result of an industry collaboration to update the widely used American Petroleum Institute WITS standard for moving drilling data between rig and office based computer systems. It provides data in a consistent XML format which is independent of service company systems and geographic location.It provides data in a consistent XML format which is independent of service company systems and geographic location. It underpins BP’s objective to achieve leading edge productivity in well delivery by providing enhanced real-time information sharing.It underpins BP’s objective to achieve leading edge productivity in well delivery by providing enhanced real-time information sharing. It facilitates standardisation in BP’s Advanced Collaboration Environments.It facilitates standardisation in BP’s Advanced Collaboration Environments. It provides a framework for smart tools deployment.It provides a framework for smart tools deployment. W ellsite I nformation T ransfer S tandard M arkup L anguage “The ‘right-time’ seamless flow of well-site data between operators and service companies to speed and enhance decision-making”

6 WITSML plus a standard architecture will deliver optimum value and accelerate deployment Time efficient Reduce cost Provide a platform for hybrid technology Encourage collaboration Make better use of skilled resources Simplify contracts

7 Real-time architecture using service company facility (proprietary)

8 Real-time architecture using service company facility (WITSML)

9 Integrated real-time WITSML architecture (BP hosted)

10 WITSML inter-operability testing The WITSML SIG is introducing compliance testing of WITSML products but we expect this to take a little while for adoption. Inter-operability between different software solutions is a major attraction of WITSML. This has caused us problems in existing deployments. As an interim measure, BP is conducting its own inter-operability testing in a dedicated WITSML laboratory hosted for us by SAIC in Aberdeen. We are inviting our principal vendors to submit products for inter-operability testing prior to deployment. The WITSML laboratory will be used also as a diagnostic environment during operations. The first activities of the WITSML laboratory will be to support UK North Sea and Gulf of Mexico operations.

11 The WITSML laboratory allows different hardware and software configurations to be tested Example 1 – Serial WITS data from Service Provider with offshore firewall Example 2 – Networked WITS/WITSML data from Service Provider with 2 offshore firewalls

12 Working together in Advanced Collaborative Environments (ACE) The Business Challenge: Optimised performance requires Near real time analysis and decisions Collaboration by geographically dispersed experts Bringing diverse and wide ranging expertise together Specific Examples Drilling abnormal situation management Multi-discipline collaboration Observe Act Decide Analyse

13 The new way of working in BP… Operations Multi Asset Support Centre – We are now designing all of our new offices to support multi discipline, multi asset collaborative environments. D&C information will be in WITSML format.

14 Conclusions A standard WITSML architecture brings new challenges and opportunities −It simplifies the award of contracts −It enables remote working and automation −It encourages the adoption of hybrid solutions −It speeds up the deployment of standard applications We are looking for continuous improvements in HSSE and efficiency We need to address the “big crew change”

15 A final thought … …..get ahead of the wave! Supporting human interaction, remote decision making and problem anticipation are opportunities for digital technology to add significant value to the global oil and gas industry. For D&C, WITSML is critical to making this happen.