1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 11 December, 2008.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
NAVAL REACTORS PROGRAM TMDE Status
Making Sense of the WIC EBT IAPD IAPD Session of the 2014 WIC EBT User Group Meeting July 23, :00 AM to 12:00 PM Presented by Cheryl Owens, MAXIMUS.
Effective Project Management: Traditional, Agile, Extreme
Configuration Management Backup/Recovery Project Review.
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
Project Process Discussion Adam D. Martinez Mgr, Market Ops Divisional Projects Organization ERCOT RMS Meeting May 10, 2006.
1 Universities Space Research Association SOFIA Program Options SSSC 18 February 2010 Mina Cappuccio SOFIA Science Project Manager NASA Ames Research Center.
Slide 1 Sterling Software Peter Sharer Sterling Software.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Development and Quality Plans
Technology Use Plan Mary Anderson 7/29/08 EDTECH 571 click to go to each slide.
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
Development plan and quality plan for your Project
Project Communications Management J. S. Chou Assistant Professor.
Planning. SDLC Planning Analysis Design Implementation.
Project Execution.
Project Management Lecture 5+6 MS Saba Sahar.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Introduction to Information System Development.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
MCCS Status Update SOFIA SITR Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Water Supply Planning Initiative State Water Commission November 22, 2004.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Joint Venture Conservation Business Model Roundtable December 12, 2006 Austin, TX Working with Work Groups: The PLJV Experience.
Candidate for Standardization Pilot Program - Status Report September 27, 2011 Michael Burshtin, Standardization Coordinator Dale Engelhardt, Vice Chair.
Systems Analysis and Design in a Changing World, Fourth Edition
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Simplifying the Budget Process
1 Universities Space Research Association Introduction, Charter and Feedback Eric Becklin SSSC 18 Feb 2010.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
1 Project Communications Management Lecture 11. Learning Objectives Describe the importance of good communication on projects and major components of.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 FLITECAM December 11, 2008 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 FLITECAM April 28, 2009 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
State of Georgia Release Management Training
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
U.S. Department of Agriculture eGovernment Program February 25, 2003 USDA Presidential Initiatives Meeting Chris Niedermayer, USDA eGovernment Executive.
Class-oriented metrics – Weighted methods per class, depth of the inheritance tree, number of children, coupling, response for class, lack of cohesion.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Chapter 10: Project Communications Management Information Technology Project Management, Fifth Edition.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Mission Planning Concepts
SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.
Systems Analysis and Design
Mark McKinnon EVLA Project Manager
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Chapter 4: Project Integration Management
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
ESF evaluation partnership
Presentation transcript:

1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 11 December, 2008

2 Major Progress Items SI airworthiness team recommended to AFSRB that HIPO be considered airworthy (pursuant to airworthiness TIM in May 2008) Sample HIPO data sent to the DCS for ingestion. Results not yet known to us. Status of upgrades (“Let’s use Mac Minis, and get better screens while we’re at it!”) –Mac Mini control computers, larger format flat panel displays documented and in service –Machining of parts for optional small, fast CCDs complete; documentation done. –A few minor changes responding to airworthiness findings and an ICD ECO –Much supporting documentation required: 14 new dwgs, 24 dwg revs, 9 doc. revs HIPO driven to Site 9 on November 3, on schedule HIPO Delta Airworthiness & Operations review successfully held November 5 –My apologies for the short fuse on this! Updated memo to AFSRB not yet received. Plans for HIPO ground tests of SOFIA completed HIPO Pre-Install Review successfully held November 14 HIPO installed on November 17, on schedule. Completed TC-HIPO-01 on 11/18, but work stalled thereafter by CDDS –Flexure internal to HIPO is now known to be ±0.1”, sufficient for SOFIA test purposes TRR for HIPO ground tests of SOFIA held 11/21; primary problem area the CDDS Rohacell insulation coated and painted, tools marked, processes clarified, …

3 Installation Changes to procedure compared to Waco –QA approval lines added throughout –Minor technical modifications HIPO cart change due to annoying problem in Waco Ballast weights on the floor needed to be moved –Complicated hand-off of roles and responsibilities Complicated in concept, straightforward in execution Problems encountered –GPS antenna line had been moved for another purpose. Fixed. –Quite a few bad fibers, mostly incorrectly seated or dirty. Fixed. –Intentional “problem”; trimmed Rohacell insulation to fit INF ID. –Tool control paradigm wasn’t quite settled yet. Settled now. Things still in the works –Scale not yet set up, so will weigh HIPO on removal –Rack mounting platform, UPS, MADS, CW rack crane not done

4 Installation, Cont’d

5 Current Summary Status Outstanding items:> MADS unit for SI racks > Platform for rack mounting

6 Budget Status High spending rate in first quarter due to ground test work. Total exceeds FY09 grant amount due to ground test work and funding being carried over from FY08.

7 HIPO Milestone Schedule

8 Remaining Work Summary Ground Performance Testing (for SOFIA, not HIPO) –Carry out GPS and SMA functional tests (Short HIPO commissioning tests) –Carry out as many of the HIPO tests of SOFIA as possible in the short remaining time –Carry out formal analysis and documentation of ground test results Documentation –Write HIPO-MCS interface document and test plan –Integrate with MCS to Tier 4 by whatever approach we decide on –Continue working on the HIPO operations procedures document –Provide input for EMI/EMC test plan, now part of an overall Combined System Test –Incorporate MADS units into the HIPO drawings and documentation system –Write the USRA Proposal Manual (for use by GI proposers) –Write the HIPO data analysis manual Upgrades –Ongoing control and data analysis software upgrades CCD67 support, stop/abort, GPS/NTP daemon, 2-channel coordination, MCS communication, … –Complete CCD67 implementation Science preparation effort at MIT and Lowell –Ongoing KBO orbit maintenance for future predictions –Annual observing runs at the Perkins to prepare for SOFIA science flights Understand problems related to precise differential photometry

9 QA - Issues and Mitigations These issues are two facets of the same general problem, not HIPO-specific Clarify and formalize QA processes - Major –Description: Need to feel our way through folding SI activities into DFRC’s operational culture in a workable, effective manner. There is no accepted precedent. –Impact on Science, Schedule, Budget: Frustration and confusion, additional time required –Mitigation: Define documentation content better - overlap and confusion in HIPO documents Just keep at it in good faith all around Educate QA personnel regarding SI procedures - Major –Description: Science instruments are foreign to the QA staff at DFRC. Lack of understanding slows progress and reduces value of QA activity. –Impact on Science, Schedule, and Budget: Frustration and confusion, inappropriate emphasis can result –Mitigation Just keep at it in good faith all around

10 DAOF Ground Ops Lessons Schedule –Allow 2 days for training, extra time for press, VIP tours, and lots of meetings Cryo, compressed gas, “Hazard Communication” SOFIA orientation, SOFIA evacuation training Logistical –No cafeteria or nearby place to eat. Best to bring lunch. –Refrigerators, microwaves available. No food in the lab; water only on the A/C –Day shift 7AM-4PM. Second shift ends 11PM. –No working alone, even in the lab. –Permanently mark any tool that might find its way on the aircraft. Tool control. Processes & procedures –DFRC has well-developed processes/procedures/docs we don’t know about –We do lots of things that are second nature to us that they don’t know about –Nothing “significant” gets done without a written & approved procedure with QA sign-off at various steps along the way. First approximation: things in your SSA. Notable Issues –LN handling, leak check, grounding, tool control all worked out. –LHe handling, hoist operation, software interaction w/ platform systems not settled

11