Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.

Slides:



Advertisements
Similar presentations
St. Croix River Crossing Project Public Information Meeting
Advertisements

Bridge Enhancements 07/22/2013 Route 47 Missouri River Bridge Bridgescape, LLC.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Signs Keep it Simple. Which are on ramps? Exits?
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.
From Island Estates Parkway to St. Johns County Line.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Bridges from all over the World! By: Maria Peloro & Christine Sniffen Bridges powerpoint project 2 nd period science.
Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
September 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Concrete Barrier placed at unauthorized median at Ch
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
High Bridge Re-Deck Project
Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
New Bridge Construction
US26: Cornelius Pass Rd -185th Ave
Capital Improvement Program
Highway 169 Bridge Replacement & Pavement Resurfacing
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Contract 60X10 Informational Meeting Weber I-55
Federal-aid Highway Program
Design Standards.
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Presentation transcript:

Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project

Aerial View Of Benicia Bridges New Benicia-Martinez Bridge Existing Benicia- Martinez Bridge

New Benicia-Martinez Bridge Project Remove Median Barrier and place floating slab Remove Asphalt and replace with lightweight fill. Marina Vista Road Complete Remaining work on Marina Vista to new Mococo rail crossing. South Approach Contract Work

New Benicia-Martinez Bridge Project 18” Asphalt Overlay Raise Mococo Bridge by 18” South Approach Contract Work

New Benicia-Martinez Bridge Project Existing Bridge Work Add New Bike/Pedestrian Walkway Demolish Center Median Benicia Martinez Replace 67 Deck Joints Replace Deck Sections

New Benicia-Martinez Bridge Project Replace Deck Joints - 67 Joints spaced 90’ apart Replace Deck Sections Stage 1 Stage 2 Expansion Joint Reconstruction

New Benicia-Martinez Bridge Project Deck Reconstruction Pier 3 to Pier 13 12’ wide replacement (Entire length of truss bridge). Pier 13 Pier 3 Deck Reconstruction Pier 3 to Pier 13 12’ wide replacement localized Areas Partial Deck Reconstruction

New Benicia-Martinez Bridge Project Deck Reconstruction – Typical Section

New Benicia-Martinez Bridge Project Expansion Joint Reconstruction

New Benicia-Martinez Bridge Project Existing Bridge With New Public Access Existing Bridge 74’ 12’11’ 6’ 11’ 12’ median Existing Bridge with New Bicycle & Pedestrian Path Southbound I ’ 12’ shoulder 8’ 12’ 11.5’ 11’ 8’ shoulder Southbound Northbound

New Benicia-Martinez Bridge Project Public Access At North Approach Existing Vista Point New Bicycle & Pedestrian Path

New Benicia-Martinez Bridge Project Bike Path Cross Sections 12’ 2’ 2% Typical Section 12’ 2’ Freeway Traffic Adjacent to Freeway Shoulder 2% 12’ 1.50% Bridge Traffic Existing Concrete Barrier On Existing Bridge

New Benicia-Martinez Bridge Project Mococo Road Public Access to New Toll Plaza MARTINEZ Marina Vista Road New Bicycle & Pedestrian Path South Approach Contract Work

New Benicia-Martinez Bridge Project Bike and Pedestrian Facilities

New Benicia-Martinez Bridge Project North Approach Contract Work Remove Toll Plaza

New Benicia-Martinez Bridge Project Demolish Over crossings Demolish Existing Toll Plaza New Pedestrian/Bike Path Realign I-680/I- 780 SB Traffic North Approach Contract Work Benicia