Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Similar presentations


Presentation on theme: "Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section."— Presentation transcript:

1 Route 47 Missouri River Bridge Bridgescape, LLC

2 Bridge Typical Section

3 Distinctive appearance so that bridge remains a symbol Stay within budget: “German Simple” Recognize views to bridge from downtown/riverfront Maintain views to downtown from the bridge Keep design subtle; historic feel with minimal detailing Light pedestrian/ bicycle trail but not entire roadway; Lighting should enhance structure, not draw attention to itself. Committee Design Goals (4/18/2013)

4 Previous Committee Selections: Variable Depth Girders ** ** MoDOT Funded Pier Shape – Gothic Pier ** One (1) Overlook Located at Pier 7 ** Railing – 27” Concrete Wall with Vertical Railing Element Girder Lighting – Girder Wash Fade Pier Lighting Overhead Pier Element – Curved Truss w/ Sun Shade Low Level Trail Lighting

5 Previous Committee Prioritization: Enhancement Priority Decorative Railing 1 Girder Lighting 2 Pier Lighting 3 Overhead Element 4 Trail Lighting 5

6 View from Washington Riverfront Park

7

8 Aerial View of Overlook

9

10 View from Pedestrian/ Bicycle Trail

11

12 View from Northbound Traffic Lane

13 View From Northbound Traffic Lane

14 View from South Approach of Existing Bridge

15

16 (w/ East Face Girder Lighting )

17 View from Trail Below Bridge

18

19 Preferred Enhancement Package Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting PrioritizationEnhancementEstimated Cost (4)Estimated Cost (4A) 1 Decorative Railing (Addition to MoDOT Credit) $120,000 2 Girder Lighting – Fade (west face only) $587,000 Girder Lighting – Fade (east and west face) $1,133,000 3 Pier Lighting $172,000 4 Overhead Element (w/ lighting) $225,000 5 Trail Lighting (full length) $137,000 SUBTOTAL $1,241,000$1,787,000 3% Inflation for 3 years (9.27%) $115,000$166,000 TOTAL $1,355,000$1,953,000

20 Preferred Enhancement Package $1,355,000 Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (west face only)

21 Preferred Enhancement Package $1,355,000 Decorative Rail + Girder Lighting + Pier Lighting (west face only) + Overhead Element + Trail Lighting

22 Preferred Enhancement Package $1,953,000 Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (east & west face)

23 Project Schedule Final Enhancement CommitmentAugust 16, 2013 Public Hearing (Right-of-Way)October 2013 Final Enhancement Funds Secured August 2014 Open Construction BidsSeptember 2016 New Bridge Open to TrafficFall 2018 Project Complete Summer 2019

24 Thank You for your Participation