Alistair Steele Network Connected Batteries
2008 SSEPD Energy storage projects kW Flow Battery 1 MW NaS Battery 2 MW Lithium Battery 3 x 25 kW Lithium Batteries
Shetland 1MW Battery
Installed 1 MW / 6 MWh NaS battery Significant safety incident in Japan has halted progress Currently awaiting results of detailed investigation before making a decision on project status
LV Connected Energy Storage
Project drivers The uptake of low carbon technologies is already having an impact on how we operate our LV networks: - Solar PV - Heat pumps - Electric vehicles Traditional solution is to replace cable / associated plant Can energy storage be used to mitigate these effects? Is there an operational / economic case over existing solutions?
Overview Small array to prove functionality 3x single phase, 25kVA batteries connected at 230V Located towards the end of the circuit for SSE Zero Carbon Homes project Determine operational issues and benefits: Peak lopping demand & generation Voltage support from real / reactive power Aggregated reduction in peak demandand phase balancing
Network location of the batteries Low voltage connected battery project
Network location of the batteries Low voltage connected battery project
Site photographs Low voltage connected battery project
Installation photos – Chalvey, Slough Low voltage connected battery project
Installation photos – Chalvey, Slough Low voltage connected battery project
Communications schematic
Low voltage connected battery project G59/2 commissioning
Low voltage connected battery project G59/2 commissioning
Low voltage connected battery project Safety & comms testing
Presently have a comms fault internal to the battery in two of the units Working with manufactured to resolve situation Basic test programme started July 2012 – moving into detailed testing of the units to flatten demand and manipulate voltage Learning will feed into the larger project rollout under Tier 2 Next steps
Project within timescales / budget Safety case / risk assessment completed All three battery units successfully installed Manufacturer commissioning and G59 compliance completed Radio communications working as intended Enmac integration complete Test programme to run for 2 years Formal learning report released 2014 Summary
Orkney Energy Storage Park
Orkney battery - Technology
Orkney battery - Service Based Contract Battery not owned or operated by network business Service procured – Constraint management Battery owner free to trade across multiple markets