Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.

Slides:



Advertisements
Similar presentations
A CASE STUDY in actual energy conservation
Advertisements

Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
eQuest Quick Energy Simulation Tool
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Saving Energy and Reducing Costs in RI Hotels & Restaurants February 24, 2010.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
ENERGY CONSUMPTION: MANZANITA HALL ENERGY UPGRADES BEN COHNDANNY GARNETT AUSTIN FROGGEPAUL SAIGEON MATT DUNCAN.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
Phoenix Convention Center Phoenix, Arizona Keys to Energy Behavior Change Solution Showcase Retained Energy Savings: Putting It into Practice Mike Van.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Targeted E4 Re-Tuning at GSA Facilities Integrated Energy Low/No Cost Solutions through Building Automation.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
Marriott Corporate Headquarters
Phoenix Convention Center Phoenix, Arizona District or Distributed Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Overview of Data Center Energy Use Bill Tschudi, LBNL
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
Lighting Beyond the Bulb LED Lighting and Lighting Management Solutions Todd Smith
Energy Conservation Building Upgrades Alma School District.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Robert Greenwald, P.Eng, MBA February 26, 2004
Sean Weber Energy Engineer
The Data Center Challenge
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry Nicole Bulgarino Ameresco, Inc. August 12, 2015

Energy Exchange : Federal Sustainability for the Next Decade 2 Project Background Silver Spring Metro Center 1 208K SF Construction of this nine-story office building completed in 1987 Occupancy is approximately 700 All electric heating & cooing Initial EUI 120 New Carrollton Federal Building 1.1M SF Completed in 1994, consists of three nine-story office towers connected by “public level” on the ground floor Occupancy is approximately 5,000 All electric heating & cooling Initial EUI of 115

Energy Exchange : Federal Sustainability for the Next Decade 3 Project Highlights Integrated ECMs Lighting & Advanced Controls - 15% energy reduction Chiller System Optimization - 7% reduction Building Controls - 30% reduction Other improvement measures - 9% reduction Infrastructure measures - 1% reduction Renewable Energy Solar Thermal & PV System Geothermal Field Economics $45 M Project Implementation Costs 22-Year Performance Period $4 M Rebates

Energy Exchange : Federal Sustainability for the Next Decade Holistic & Comprehensive using integrated ECMs 4 Project Approach Identify load reduction measures Evaluate energy and water conservation measures which reduce energy and add customer value Evaluate energy efficiency upgrades Include renewable systems Assist agencies in meeting their respective High Performance and Sustainable Building goals Maintain stakeholders goals while minimizing disruption to tenants. Upgrade infrastructure – a major customer goal

Energy Exchange : Federal Sustainability for the Next Decade 5 Baseline Establishment Used eQUEST to Model Calibrated Models to Actual Utility Bills 115 kBtu/sf per year – all electric

Energy Exchange : Federal Sustainability for the Next Decade Roof Replacements – 33,000 SF Additional insulation replaced Additional Window Panes South facing lobbies Integrated blind system at Silver Spring Reduces infiltration, solar gains Augment Bi-fold Doors with Revolving Bi-folds open for 30 seconds Allow use of revolving door in lieu of bi-folds 6 Load Reduction - Building Infrastructure Improvements

Energy Exchange : Federal Sustainability for the Next Decade 7 Load Reducing ECMs: Lighting Replacement of fixtures in all areas including garageExisting Fixtures: 2x2 with three F40 Biax CFLs Measured load at 115 watts average Spaces over lit at foot-candles New Fixtures: 2x2 LED fixture Dimmed to 25 watts Provide the required 30 foot-candles Reduces cooling load Utility Rebates = $1,000,000+$11.8 per watt to install

Energy Exchange : Federal Sustainability for the Next Decade 8 Conservation ECMs: Lighting Controls Existing: Centrally Controlled via contactor panels Turns lighting circuits on and off at scheduled times Older DOS based system – not very user friendly New DALI system (digitally addressable lighting interface) Open Protocol (GSA preferred) DALI multi-sensors and local controls daisy chained with fixtures (occupancy and light level) Over 2,000 dynamic occupancy sensors Each fixture becomes individually addressable Graphical user interface

Energy Exchange : Federal Sustainability for the Next Decade Cooling system ECM Overview Reduce Light and other Load Replace & Resize Chillers Add Chiller-Heater “Waste” Cooling, Heating to Domestic Water Geothermal Field 9 Deep Retrofit of Space Heating & Efficiency Cooling System Upgrades

Energy Exchange : Federal Sustainability for the Next Decade 10 Chiller Plant Upgrade & Heat Recovery

Energy Exchange : Federal Sustainability for the Next Decade 11 Geothermal Well-Field

Energy Exchange : Federal Sustainability for the Next Decade 12 Deepest Energy Retrofit – Comprehensive DDC Controls Existing Building : Electric controllers with pneumatic actuation and pneumatic VAV boxes No feedback on DDC front end Requires annual calibrations Reactive maintenance Building designed with 200,000 CFM of outside for 6,000 occupants (33 CFM per person) Proprietary communication protocols New Control System All DDC with electronic actuation (removing compressors) Proactive maintenance C02 demand control ventilation will cut OA in half

Energy Exchange : Federal Sustainability for the Next Decade 13 Lighting and HVAC Controls Integration HVAC Control Strategies Demand-based reset schedules Optimum start and stop Chilled water flow matching (primary and secondary) Variable speed primary chilled water Lighting control system will pass occupancy sensor status to HVAC control system Allows to reduce outside air, overall airflow, VAV temperature deadbands will increase allowing more float of space conditions More aggressive during overtime mode

Energy Exchange : Federal Sustainability for the Next Decade 14 Integrating Renewables

Energy Exchange : Federal Sustainability for the Next Decade Challenges of complex project – Extensive coordination with multiple stakeholders within GSA for development, build, and M&V – Multiple Design reviews – Project runs 7 days a week, 20 hours a day during the week, 12 hours on the weekend – Work is always moving throughout the building. Vertical pipe runs require working on multiple floors and different ECMs – Planning, accessing secure areas, specific delivery requirements – Lengthy badging process – Work cannot impact tenants – Long-term savings guarantee 15 Challenges

Energy Exchange : Federal Sustainability for the Next Decade Integrative design & appropriate M&V Plan Project champions – National GSA office – Building Facility Manager – Project facilitator ECMs saved with design compromises – PV array and rain gardens – Window films and roof replacement Well-structured communication plan Transition Plan for systems NDER program – Standardization of processes – Streamlining of legal and logistical hurdles – Potential for improvements in commissioning of integrative design 16 Keys to Success

Energy Exchange : Federal Sustainability for the Next Decade Thank you for your time! Insert photo here: W: 5.04 in / 1512 px H: 5.72 in / 1716 px Thank you for your time! Questions?