THEMIS Mission CDR -UCB, June 14-18, 2004 Search Coil Magnetometer (SCM) MCDR Alain Roux, CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte*

Slides:



Advertisements
Similar presentations
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
Advertisements

THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
FGM peer CDR FGS - 1 Berlin, April 6, 2004 FGS Mechanical Design Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
FIELDS MEP Thermal Vacuum Cycling iPER
Double Star: Experiment Activities
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz
SPF MAG Quarterly Report – Feb 2015
Double Star: Table of Contents
Spacecraft Interface and I&T
CINEMA System Engineering
(EFW Systems Engineer) University of California, Berkeley
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
Double Star Progress Meeting #3 Beijing 2 July, 2002.
FIELDS SCM Thermal iPER
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Summary FM design overview (As built) Documentation FM performances.
University of California, Berkeley
The Magnetic Loop Antenna (MLA)
Presentation transcript:

THEMIS Mission CDR -UCB, June 14-18, 2004 Search Coil Magnetometer (SCM) MCDR Alain Roux, CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte* =>C.Coillot Lead Engineer: A.Bouabdellah Technicians: D.Alison & S.Ruocco *Till june 2004

THEMIS Mission CDR -UCB, June 14-18, 2004 Technical Manager: Bertrand de la Porte team management, general schedule Lead engineer: Christophe Coillot SCM support: design, manufacturing: Sensors : design, manufacturing, tests, PA: electrical design, tests procedures, EM&FM tests. Sniffer design, manufact. & tests Engineer: Abdel Bouabdellah ICD&PAIP management, Vibration tests, PA: PCB cabling, design of housing, manufacturing, PA I/F. Technician: Dominique Alison PA/PCB design, Manufacturing sensors, I/F PA: design, manufact., tests Technician: Sébastien Ruocco Sniffer & tests: Technical Manager: Christophe Coillot team management, schedule. SCM support: manufacturing, schedule, Sensors : manufacturing, EM&FM tests, PA: tests procedures, EM&FM AIT Lead Engineer: Abdel Bouabdellah ICD&PAIP management, Vibration tests, PA: PCB cabling, manufacturing, PA I/F general schedule. Integrations. Technician: Dominique Alison PA/PCB design, Manufacturing sensors, EM&FM tests&integrations Technician: Sébastien Ruocco PA: FM tests. Sensors: FM tests. Integrations Team re-organisation

THEMIS Mission CDR -UCB, June 14-18, 2004 IN.SCM-1. SCM shall provide a critical test for the role of waves at substorm onset, in various models (with EFI). Compliance. IN.SCM-2. SCM shall measure the 3D AC B-field from 1 Hz to 4kHz. Compliance. IN.SCM-3. The SCM sensitivity shall be better than and 0.1 kHz. Compliance IN.SCM-5. The transfer function of the SCM sensors (amplitude &phase) shall be known with an accuracy better than 5%. Compliance. Tests of EM will be made in Chambon la Forêt, end of June. IN.SCM-6. On each spacecraft the 3 magnetic antennas, shall be held orthogonal by a structure procured by CETP Compliance. Structure meets specs : mass, vibrations (modeling, and vibration tests) Sensor requirements

THEMIS Mission CDR -UCB, June 14-18, 2004 Sensibility EM (pT/sqrt(Hz) Fréquency (Hz)

THEMIS Mission CDR -UCB, June 14-18, 2004 Design includes EPR remarks and numerical simulation results. Interface is completely defined (cf. P. Turin). EM structure delivered by GdTech to CETP: May 17th. 3-axis structure

THEMIS Mission CDR -UCB, June 14-18, 2004 PA Design by 3D+ Mechanical characteristics: 2 amplification levels 3 radiation shielding levels Dimensions: 20 x 20 x 15 (mm) Weight : 15 g Pre-Amplifier module

THEMIS Mission CDR -UCB, June 14-18, 2004 PA Layout on PCB&box a

THEMIS Mission CDR -UCB, June 14-18, 2004 ItemSpecificationStatus Search Coil Size Search Coil Mass 175x175x175 mm 600 g 176x176x176 mm 608 g (+/-8) Most masses meas. Pre-Amp Size Pre-Amp Mass Pre-Amp Power 80x70x40 mm 200 g 90 mW 109 x 94.9 x 30mm 200 g (measured) 86 mW (measured with EM) Power &mass summary

THEMIS Mission CDR -UCB, June 14-18, 2004 Operations When ON, SCM is continuously measuring the magnetic field up to 4 kHz. Once per orbit a calibration is run for 30 secs (default) After 60 seconds, the Calibration is automatically turned off.

THEMIS Mission CDR -UCB, June 14-18, 2004 Test Matrix Model I/F EM FM Item PA SC PASC+PA SC PASC+PA Electric. Verificat.XXXXXXX Full Calibration XX Mech. I/F,M, CoG, MoIXXXX VibrationsQQAA Thermal tests (cycles)QQAA Thermal Vacuum Q.idpuA.idpu Interface to IDPUX Pre-integration UCBXXXX Integration to S/CXX

THEMIS Mission CDR -UCB, June 14-18, 2004 Test plans : SC After winding of internal tube Verification of Impedance Done (EM) After potting of the magnetic core Verif. of imped. Magnetic flux resp. (with PA Done (EM) After overall pottingVerif. of imped. Magnetic flux resp. (with PA To be done end of june EM After 3-axis assembly, and connect. to PA Transf. funct. (SC in mu- metal box, metrology, vibr., temp. limit, Full cal. in Chambon Begin of july EM After delivery to UCBTherm. Vac (with S/C)

THEMIS Mission CDR -UCB, June 14-18, 2004 Test plans: PA cubes Single flexElectrical verification Offset adjustment Done (EM&FM) Done(EM) After cube assembly &potting Electrical verification Temperature test* (-50° - +60°) Done(EM &FM) Done(EM) * Takes into account changes suggested during CDR peer review

THEMIS Mission CDR -UCB, June 14-18, 2004 Test plans: full PA box After PCB cablingElectrical verificationDone EM After assembly in the housing Electrical verification Metrology Vibrations Full range temp. tests Done TB done Done Connect. with SCTransfer funct.,SC in mu- metal box. Full cal. in Chambon End of June After delivery to UCBThermal vac. With IDPU

THEMIS Mission CDR -UCB, June 14-18, 2004 Bench test configuration

THEMIS Mission CDR -UCB, June 14-18, 2004 Mag. calibration: Chambon

THEMIS Mission CDR -UCB, June 14-18, 2004 Interface verification at UCB An interface model has been built and sent to UCB to test I/F to IDPU. Same Power, Command, analog output interfaces Power and Cal Mode identification by LED Cal Signal re-injected to the input A signal generator can be connected to each input

THEMIS Mission CDR -UCB, June 14-18, 2004 Pre-integrations at UCB After delivery to UCB (Incoming Inspection, Bench Test) Sensor in the mu-metal box Electrical Integration Power ON and functionnal test Validation can only be done by analysis of telemetry data I&T at UCB

THEMIS Mission CDR -UCB, June 14-18, 2004 I&T at s/c level Integration on the spacecraft Mechanical Integration of the PA, connection to the boom harness Sensor in the mu-metal box Electrical Integration (bounding, isolation) Power ON and functionnal test Validation can only be done by analysis of telemetry data

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM tests at s/c level: 1 Initial configuration: The sensor is inside the mu- metal box, connected to the PA via the boom harness Requirement: keep the sensor in the mu-metal box until all experiments are integrated in the spacecraft (mission operation test)

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM tests at s/c level: 2 WHAT CAN BE DONE WITH THE SENSOR IN THE MU- METAL BOX? Verification of the labelling of axis (X,Y, Z) (Re)-verification of the end-to-end calibration Phase relation between the 3 components (for the waveforms) Measure the conducted noise SCM/EField timing reference [and inter-calibration]

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM integr. at s/c level: 3 SENSOR MOUNTED ON THE BOOM PA saturated by the 50/60 Hz (except in an EMC chamber). No measurement possible but a major failure would be detectable. INSTALLATION OF THE MLI: preferably at the last moment, before s/c vibration tests.

THEMIS Mission CDR -UCB, June 14-18, 2004 EMC tests at s/c level CETP can help analyse the AC radiated noise around the spacecraft. A « magnetic sniffer » has been built and delivered to UCB. In order to avoid the saturation by the 50/60 Hz, the analysis is separated into two bandwidths: below 50 Hz and above 300 Hz (5th harmonic).

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM integr.; team support The SCM team will support all critical activities, for the integrations. However, due to the large number of satellites, a strategy should be implemented to limit the number of travels, cost and time spent Support EM integrations in any case The FM will be delivered 3 by 3 and the level of support for each test will be agreed upon with UCB Capability of remote access/support should be implemented

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM schedule- Key dates EM delivery to UCBJuly 2004 EM pre-integrations at UCB July D cubes (FM) delivery to CETP July 23th, 2004 FM1,2, and 3 availability:Sept. 24 th, 2004 FM4,5, and 6 availability:Nov.10 th, 2004

THEMIS Mission CDR -UCB, June 14-18, 2004 Status of questions/RFA’s SCM-1 Ground ing & testing Concern that grounding and shielding is not yet defined—need to make sure all documents are consistent. This was an action from the last review, but understand that this is common for CDR-level fields missions. Grounding review (end of may) UCB&CETP agreed upon: Coils&shields of each SCA  GND (not to CGND) Thermal blanket  CGND Overall shielding of boom cable by conductive tape. Backshell of PA connector also shielded No need to shield SCA connect. SCM-2 Simult. Firing of actuat. Ensure that both actuators are fired simultaneously, at temperature and voltage extremes during testing. (Slavin—based on Double Star dual boom deployment failure.) The mag-booms are released simultaneously

THEMIS Mission CDR -UCB, June 14-18, 2004 Status of questions/RFA’s SCM-3 Tests of 3D components beyond predicted levels CETP should ask 3D to test components beyond the predict levels. Most electronic parts are tested at greater levels individually than at assembly level. Done; new test procedures defined with UCB&3D; temperatures ranges extended by +/-5° SCM-4 PCB mounted on 4 corners PCB mounted on four corners. Is this adequate for limit loads for deflection [probably okay, ~4mm standoffs] and strength? Recommend calculation to ensure populated board does not exceed strength limits. It is not typical to calculate the strength requirement of boards. Vibration test performed successfully. SCM-5 Wires inside PA box Wires from connectors to board are long. The wires should be laid out differently (increase board size, glue the longest wire on the PCB?) Longest wires are now glued

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM-6 details SCM-6 (cnd.) Summary of THM-SYS-005: SC(antennas) qualified by CETP (thermal cycling) without vacuum. TV test at s/c level. PA qualified in temperature (currently done) by CETP, without vac.. TV done at UCB, together with IDPU.

THEMIS Mission CDR -UCB, June 14-18, 2004 Status of questions/RFA’s SCM-6 Thermal vac./thermal air cycling UCB and CETP need to have an agreement on how many thermal vacuum or thermal air tests cycles are performed before delivery (by s/c CDR) THM-SYS-005 calls out the required cycles & temperatures SCM-7 Thermal levels Thermal levels should come from document such as environmental requirements. We are adding a reference to "THM-SYS-005 Instrument Payload Verification Plan and Environmental Test Specification" to the ICD SCM-8 Test sequencing Details of test sequencing, configuration (are sensors connected to pre-amps during testing)-Teams have begun to discuss; more meetings between the I&T lead, PM, SE and CETP would be beneficial. Marc Kaylor (Swales) is drafting the basic probe flow, so that Rick Sterling can insert the details of the SCM tests.

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM-9 Review EMI/EMC levels relative to FAST Rick Schnurr volunteers to review EMI/EMC levels relative to FAST, and tell UCB which levels may present difficulties (noise in the chamber). Data has been provided to Rick. SCM-10 Populating boards in advance Recommend populating boards in advance of 3D cube arrival, to help schedule Agreed SCM-11 Nickel plating of small objects far away from sensor Would be beneficial in magnetics plan to note: don’t consider nickel plating small objects far away from sensor (such as nickel coating on 3D cubes). Although not specifically called out in the magnetics plan, the use of nickel plating has been tested and tracked. The SCM Pre-Amp 3D Plus modules were tested in Braunshweig in Dec. and determined to have a magnetic moment well within the requirements for THEMIS. Status of questions/RFA’s

THEMIS Mission CDR -UCB, June 14-18, 2004 SCM-12 Thermal treatments on e-box. Thermal treatments on e-box is in need of definition. The thermal treatments have now been defined by UCB. The top of the preamp will be anodized but the rest of the box can remain alodine. SCM-13 Chambers used for EMI/EMC tests The chambers used for EMI/EMC tests usually do not present a clean AC magnetic environment. This is why tests on subsystem with a search coil inside a large mu-metal chamber are important when a careful verification is needed. Such a facility exists in France at Chambon-la-Foret. We believe this is a recommendation to do what we have planned. So the response is to keep going as planned. Status of questions/RFA’s

THEMIS Mission CDR -UCB, June 14-18, 2004 Ressources (mass & power) are compatible with allocation. Tight schedule, yet delivery dates for EM and FM are compatible with the schedule of the project. PA cubes (EM) meet requested performances. PA box passed temp. & vibr.tests ; no problem. Sensitivity meets specs Antenna structure (EM) delivered. Meets specs. Summary