Bharat Sharma Nepal POPULATION & HOUSING CENSUS OF NEPAL: AN EXPERIENCE OF OUTSOURCING REGIONAL WORKSHOP ON CENSUS DATA PROCESSING 15-19 September, 2008.

Slides:



Advertisements
Similar presentations
MICS4 Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of Data Processing System.
Advertisements

National Statistics Office Republic of the Philippines.
Managing data using CSPro
PROCESSING TOURISM SURVEY DATA Tourism Statistics and Information Management Workshop (October,2005 Jolly Beach Antigua) Presented by: Winfield Griffith,
© Prentice Hall CHAPTER 15 Managing the IS Function.
Census Dates  September 2010, or  Six months after elections to ensure smooth conduct free from any political clashes.
COMMITMENTS FROM THE NSDS ON THE REGIONAL STRATEGY (INDONESIA CASE) BADAN PUSAT STATISTIK SURYAMIN Chief Statistician, BPS-Statistics Indonesia ASEAN Regional.
“MEZAN” Case Management Program At Palestinian Courts.
GHANA STATISTICAL SERVICE IPUMS – Country Report: Ghana.
Introduction of Internet Survey Methodology to the Emirate of Abu Dhabi Andrew Ward, Maitha Al Junaibi and Dragica Sarich.
Brief Overview of Data Processing of Afghanistan Household Listing, Pilot Census Results, Population and Housing Census and NRVA Survey Brief Overview.
The 8 th ECO National Focal Points on Economic Research and Statistics ( April 2011, Baku, Azerbaijan) Country Report of the I.R. Iran Statistical.
1a Job Descriptions for Personnel Involved in PAT Implementation Materials Developed by The IRIS Center, University of Maryland.
Data capture of the PHC 2002 (Uganda) Experiences and lessons leant.
Manual Data Processing of Census Data 2004 Population and Housing Census Statistics Sierra Leone Thekeka Moses Conteh Sierra Leone.
Census Census of Population, Housing,Buildings,Establishments and Agriculture Huda Ebrahim Al Shrooqi Central Informatics Organization.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
HOUSEHOLD SURVEY PROGRAMME IN UGANDA: PAST EXPERIENCES AND FUTURE PLANS By James Muwonge Uganda Bureau of Statistics OCTOBER, 2009.
Experience of Vietnam in Census Mapping and Household Listings General Statistics Office of Vietnam.
Sterling Chadee Director of Statistics. The processing of the data from the field enumeration began in July 2011 until September All data processors.
1 Meeting on the Management of Statistical Information Systems (MSIS 2010) (Daejeon, Republic of Korea, April 2010) NIS ICT Strategy in the Production.
International Conference on the Millennium Development Goals Statistics (ICMDGS) Manila, Phillipines Octopber 1-3, 2007 Statistical Problems for Monitoring.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys United.
Workshop on International Standards, Contemporary Technologies and Regional Cooperation, Noumea, New Caledonia, 04–08 February 2008 Results Generated from.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Bangkok,
Software Systems for Survey and Census Yudi Agusta Statistics Indonesia (Chief of IT Division Regional Statistics Office of Bali Province) Joint Meeting.
Second International Workshop on Economic Census Seoul, Korea, 6 -9 July 2009 Shanker Lal Shrestha Central Bureau of Statistics Nepal Data Collection and.
The Central Bureau Of Statistics Sudan. Sudan has had a statistical system for nearly one hundred years. Soon after independence in 1956, the Department.
Multi-modal of data collection for the 2010 Population and Housing Census National Statistical Office, Thailand (Daejeon, Republic of Korea, April.
Country Report (Iran) Hamidreza Pouyanfar Senior Expert of Communications and Storage Statistics Statistical Center of Iran Statistical Center of Iran.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Status of Data Capture Technology in Population and Housing Censuses in the ESCAP region Statistics Division ESCAP.
Population Census and PES 2006 Hudha Haleem Statistical Officer Department of National Planning Statistics Section MALDIVES.
2008 Population Census of Cambodia Post Enumeration Survey Mrs. Hang Lina Deputy Director General National Institute of Statistics, Min. of Planning Regional.
Data processing of the 1999 Vietnam Population Census.
Data processing of 2000 population and housing census of Mongolia Munkhbadar Jugder, Senior officer of Population and housing census bureau, NSC of Mongolia.
Use of Technological tools in the Dissemination of Census Data Central Statistics Organization Afghanistan United Nations Workshop for South Asian countries.
Data Processing of the 2010 Population and Housing Census September 2008, Bangkok, Thailand National Statistical Office, Thailand.
UNSD-UNESCAP Regional Workshop on Census Data Processing: Contemporary technologies for data capture, methodology and practice of data editing, documentation.
Preparations for 2011 Census in India Office of the Registrar General & Census Commissioner, India Workshop on Census Data Processing Bangkok 15 th – 19.
Workshop on the Improvement of Civil Registration and Vital Statistics in the SADC Region, Blantyre, Malawi, 1 – 5 December 2008 Integration and coordination.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Asunción,
Third Regional Workshop on Production and Use of Vital Statistics May 2014, in Daejeon, Republic of Korea Presented by: Ashok Kumar Bhattarai, Director.
Relation of Census of Agriculture with the Population and Housing Censuses.
Benjamin Sila Samoa Bureau of Statistics ‘Data Collection on rural enterprises & services through Ag Census’ FAO Roundtable Meeting on Programme for the.
CENSUS DATA ANALYSIS TOOLS, AREAS, ISSUES & NEEDS Neena Sharma, IAS Director of Census Operations, Uttar Pradesh Office of the Registrar General & Census.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Bangkok,
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Asunción,
Methods of Statistical Analysis and Dissemination of Census Results in Guyana MORGAN CLITUS DIAS SENIOR CARTOGRAPHER BUREAU OF STATISTICS GEORGEOWN,GUYANA.
Data Preparation and Description Lecture 24 th. Recap If you intend to undertake quantitative analysis consider the following: type of data (scale of.
International Seminar on Official Statistics : meeting Productivity and New Data Challenges Tianjin, China, October 2013 DAW Chaw Chaw Assistant.
GHANA STATISTICAL SERVICE IPUMS – Country Report: Ghana BY N.N.N. Nsowah-Nuamah (Deputy Government Statistician)
2010 World Programme on Population and Housing Censuses Workshop on Civil Registration and Vital Statistics in the UNESCWA Region Cairo, Egypt, December.
UNSD-UNESCAP Regional Workshop on Census Data Processing: Contemporary technologies for data capture, methodology and practice of data editing, documentation.
ADMINISTRATIVE STRUCTURE OF A COMPUTER CENTRE. The administrative structure is being organized in such a way that a skilled professional personnel is.
Census Mobile Data Capture Using CSPro in Lesotho
Quality assurance in population and housing census SUDAN’s EXPERIANCE in QUALITY assurance of Censuses By salah El din. A . Magid OUR EXPERIANCE IN 5.
Post Enumeration Survey Census
Population and Housing Census of Nepal: History, Lessons learned, and Initial planning for 2021 census Mahesh Kumar Subedi & Prakash Poudyal Central Bureau.
United Nations Regional Workshop on the 2020 World Programme
Software Systems for Survey and Census
United Nations Regional Workshop on the 2020 World Programme
Turkish Statistical Institute
Population and Housing Census 2015, and Challenge
Lao in Census Quality Assurance
Timor-Leste Country Presentation
Country Report of the Statistical Center of Iran for Workshop on Integrated Economic Statistics and Informal Sector for ECO Member Countries November.
Turkish Statistical Institute Demographic Statistics Department
Presentation transcript:

Bharat Sharma Nepal POPULATION & HOUSING CENSUS OF NEPAL: AN EXPERIENCE OF OUTSOURCING REGIONAL WORKSHOP ON CENSUS DATA PROCESSING September, 2008 Bangkok, Thailand

Background Information  The statistical system of Nepal is decentralized.  Censuses and large-scale surveys are conducted by the Central Bureau of Statistics (CBS) while the current statistics are generally collected by respective ministries, departments and agencies.  Of all the censuses and surveys, the most crucial statistical activity to provide benchmark of population - its distribution growth and their socio-economic characteristics at the lowest level of administrative unit is population census.

Background Information  Central Bureau of Statistics at present, is responsible for conducting population censuses.  Population censuses are the main sources of data that can provide the state of population at a specified time.  The first population count was undertaken in 1911 in Nepal.  Since then, the process has been continuing in every ten-year.  The 2001 Population Census was the tenth in a series of these censuses.

Background Information  Preparations for the coming 2011 census are already underway which marks one hundred years of census taking in Nepal.  Four censuses taken before the 1952/54 census are known as “head counts”.  The earlier censuses of Nepal were not that precise as compared to the modern censuses.  The 1952/54 census was taken in two parts of the country in two different years.  A synchronized census was taken in  After 1961, a census has been taken in every ten years.

Data Processing/ Database Management  Censuses up to 1961 were manually processed and tabulated.  The computerized processing and tabulations were done only from 1971 Census. Data capturing process is still manual.  At present the CBS has a small in-house data processing unit capable of processing and analyzing small scale survey data.

Data Processing/ Database Management  CBS has been relying entirely upon the National Computer Centre (NCC) for the data entry, processing and analysis of census data in the past since 1971 to  In 2000, government of Nepal collapsed the NCC.  The 2001 Population Census data was processed and analyzed at the Central Bureau of Statistics, which contributed towards institutionalization and sustainability of the data processing job in the Bureau.

Outsourcing  Due to the limited physical facilities like space, computers and personnel that were available at the CBS, data entry along with coding and editing works of the 2001 census questionnaires was outsourced to two private agencies.  For the selection of private parties criteria were prepared by the Bureau.  The bidder parties were visited for checking physical capacity like number of micro-computers and space available and the parties were short listed.  Financial proposal was called from the short listed (or pre- qualified) parties and finally two parties were selected for the job.  Due to bureaucratic processes the data entry work was delayed for about 45 days from the originally planned schedule.

Monitoring & Supervision  Two Statistical Officers were deputed in each of the data entry centers to supervise and monitor the data entry work and report to the data processing expert stationed in the Bureau.  The data entry progress was regularly updated and briefed to the Population Census Section Chief who ultimately briefed the Director General of the Bureau with all the latest updates.  Data were transmitted daily from data entry points to the CBS.  Data entry programs were provided by the CBS.  The data verification was done by the contractor first and then re-verified and supervised by the CBS.

Monitoring & Supervision  Data editing and coding manuals were developed in the CBS and given to the parties doing the data entry work.  Due to the large volume of editing and coding to be done, skipping of editing rules and miscoding of data field was found frequently.  So the CBS had to seriously monitor the editing and coding work. Such type of errors was discouraged by the central supervision.  One party worked in three shifts while the other one worked in two shifts.  Both the parties worked 12 to 14 hours per day.  Nearly 400 coding and data entry operators were hired and trained by private parties for the job.  The data entry work was completed within a period of 5 months.

Monitoring & Supervision  For the data entry program, the CBS personnel provided training for the supervisors and supervisors later gave training to the operators.  Data were entered in the networking environment. All terminals were linked to file servers and access security was maintained.  It was found in some cases that some operators tend to skip field to increase the number of records entered.  Such operators were fired and the program was modified to minimize this type of error.

Data Processing/ Database Management  A census data processing unit was established at the Population Section of the CBS with one data processing expert, two statistical officers and two subordinate staffs in system design and programming under the supervision of the Deputy Director of the Section.  For data processing and tabulations, the CBS used one Pentium IV, four Pentium III along with two high speed laser printers and one dot matrix printer in Windows NT under Local Area Network environment.  The data processing expert was made available by the UNFPA for all these purposes.

Data Processing/ Database Management  Data from private parties were transferred to the CBS through dial modem and later on through CD-ROM also.  At the CBS basically two types of check were done: completeness of data and accuracy and consistency of data.  The number of missing wards was determined after a thorough check of the questionnaire for each ward.  Data from private parties were transferred to the CBS through dial modem and later on through CD-ROM also. At the CBS basically two types of check were done: completeness of data and accuracy and consistency of data.

Data Processing/ Database Management  The number of missing wards was determined after a thorough check of the questionnaire for each ward.  Nearly two percent of the entry completed questionnaires were verified.  During verification, if the percentage of error found was higher than the tolerance limit then the data entry work was repeated in such wards.  In this process, supervisors had to physically check the questionnaires.

Software used  Integrated Microcomputer Processing System (IMPS) was used for data entry, editing, verification and management of census data.  STATA and SPSS Software Packages were used for the tabulation of the census  Report designing and layout on MS Office (like Excel and access).

Lesson learnt/Issues/Challenges of outsourcing of Data keying  Census results was produced much faster (Data entry was completed within 5 month) and more economically than in the past censuses, might also be due to new technology and high speed computer facilities.  Reduces the cost of human resources, because permanent staffs will not need for coding, editing and data keying.

 More attention should be given for selecting private parties; institutional capacity, available space, manpower etc  Strong monitoring and supervision mechanism will be needed, in some cases careless of coder, editor and data entry operator was found.  Coder, editor and data entry operator might not be professional or familiar with data, so intensive training will be needed.  Very clear coding, editing and data entry manual should be developed. Lesson learnt/Issues/Challenges of outsourcing of Data keying

Lesson learnt/Issues/Challenges  Consistency check and data verification mechanism should be strong.  The data entry centres should linked with the Data Processing Unit, through appropriate communication links and modem, which facilitate for verification.

THANK YOU