RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
Innovations in Multi-Modal Transit Mapping Margaret Carragher E.I.T Advisor: Dr. Kari Watkins P.E. October 16, 2013 GIS in Transit Conference, Washington.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Designing Shuttle Services for Niche Markets Presentation to: APTA 2009 Bus & Paratransit Conference & International Bus Roadeo/ Bus Rapid Transit Conference.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Cellular Mass Transit (CMT) CMT4Austin.org. SOLUTION: Cellular Mass Transit Circulator Routes would converge on each Transit Center.
The Sustainable Communities Partnership and U.S. DOT’s Livability Initiative 6 th Annual East and Southeast Fort Worth Economic Development Summit Don.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
Lecture 5 Bus Rapid Transit, ridership estimation procedures and headway requirements Dr. Muhammad Adnan.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Personal Rapid Transit Fort Carson Community Sustainability.
New Shuttle Routes. Current Health Sciences Shuttles – Four (4) different primary routes with excessive stops – A few single purpose routes – “Concierge”
Three Phases of Commuting Trip 1.Collection Phase – the trip from home to the main travel vehicle Cost: a.basically zero for automobile b.time costs and.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Miao(Mia) Gao, Travel Demand Modeler, HDR Engineering Santanu Roy, Transportation Planning Manager, HDR Engineering Ridership Forecasting for Central Corridor.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
Public Transit in Sacramento
Helena Inclusive Transit Planning Grant Round 2 Service Improvement Planning -Recommended Local Transit Service Improvement October 21, 2014 Presented.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Transit Estimation and Mode Split CE 451/551 Source: NHI course on Travel Demand Forecasting (152054A) Session 7.
Bus Management System in SEOUL Metropolitan Area.
Public Infrastructure Management Public Transit. What is public transit? Modes.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
1 The Aggregate Rail Ridership Forecasting Model: Overview Dave Schmitt, AICP Southeast Florida Users Group November 14 th 2008.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Business Logistics 420 Public Transportation Lecture 18: Demand Forecasting.
TRB 88th Annual Meeting, Washington DC January, 2009 Huan Li and Robert L. Bertini Transportation Research Board 88th Annual Meeting Washington, DC January.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
Ying Chen, AICP, PTP, Parsons Brinckerhoff Ronald Eash, PE, Parsons Brinckerhoff Mary Lupa, AICP, Parsons Brinckerhoff 13 th TRB Transportation Planning.
Capabilities Overview Regional Public Transportation Authority Coyote Crisis Collaborative Community Workshop April 26, 2012.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Report Samples. 2 Stop Report Shows where, when and for how long an item has stopped.
Business Logistics 420 Urban Transportation Fall 2000 Lecture 2: The Scope of Public Transportation Services.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
1 Transit Capacity Constraint Presented to: TPB Technical Committee April 1, 2005 Lora Byala Washington Metropolitan Area Transit Authority Office of Business.
1 City of Phoenix Public Transit Department Phoenix – It’s Hot…. But not enough to fry an egg on the sidewalk.
1 Mountain Metropolitan Transit Sustainability Committee March 20, 2009 Presented By: Sherre Ritenour & Tim McKinney.
1 Presentation to TAC May 20, 2009 Priority Corridor Network (PCN) Evaluation Project Introduction.
Getting & Using Transit Data John Semmens Laissez Faire Institute & Arizona Transportation Institute.
30th CAITR University of Western Australia December 12, 2008 Robert L. Bertini and Huan Li Conference for the Australian Institutes of Transport Research.
Client Name Here - In Title Master Slide 2007/2008 Household Travel Survey Presentation of Findings on Weekday Travel Robert E. Griffiths Technical Services.
Report Samples. 2 PinPoint GPS Tracking Systems Stop Report Shows where, when and for how long an item has stopped.
Making Headways Smart Card Fare Payment and Bus Dwell Time in Los Angeles Daniel Shockley Fehr & Peers Julia Salinas Los Angeles Metropolitan Transportation.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
GWRideConnect Program and Services FY GWRideConnect Program Scope TDM Agency operated by the GWRC Commission that serves the residents of Planning.
December 4, 2008 Preserving the American Dream 1 1 Faster by Bus By Gabriel Roth.
Transit Choices BaltimoreLink Ad-hoc Committee Meeting January 12, 2016.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Regional Transit Framework Study Regional Council September 24, 2008.
GMT NEXT GEN TRANSIT PLAN CATMA ETC MEETING
Macroscopic Speed Characteristics
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
Streetcars, a better way to go!
D Line Station Plan Overview
D Line Station Plan Overview
A B A B C D C D A B A B C D C D A B A B C D C D A B A B C D C D
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
D Line Project Overview
Rural Transit Stop Design Guidelines Prof Omer maaitah
Presentation transcript:

RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering

 Introduction  Transit Service Modes  Route Planning Elements  Route Planning Exercise  Additional Considerations Session Overview

Transit Service Modes Commuter Rail Light Rail Streetcar Bus Rapid Transit Rapid/Express Bus Local Bus Circulator Rural Transit Paratransit

Rural Transit Services ModeFrequency Stop Spacing (miles) Relative Capital Cost / Mile Relative Oper. Cost / Passenger Demand ResponseNA $$$$$ Deviated Local BusLow – Mod1/8 – 1$$$$ Local BusLow – High1/8 – 1/4$$$

Rural Transit Service

 Land Use Origins Destinations  Performance  Running Time  Fleet Requirements  Cost  Other Route Planning

 Annual budget of $350,000  Plan up two (2) routes on map Data says…  Assume local fixed-route bus mode  Cannot exceed 10 miles\route  Identify activity centers served Shopping, medical, work, educational…  Calculate running & cycle time  Calculate fleet requirements Route Planning Exercise

8-Mile Route

 Survey:  Demographics: Data says…

Route Planning Running Time Distance / AVG. Speed X 60 Miles / MPH 5miles / 20mph X 60 = 15 min

Route Planning Fleet Requirements Cycle Time* / Headway Minutes / Minutes 60 min / 20 minutes = 3 Buses *Cycle Time = Round Trip Running Time + Operator Layover

Route Planning Gross Annual Operating Cost Daily Trips X Trips per mile X Days X Rate per Mile 26 Trips X 255 Days X 5 Miles X $3 = $99,450

 Why the change?  Analysis  Communication with Officials Public Partners  General items  For more info on deviated routes visit: Additional Consideration