Submission on the cogeneration of electricity 25 July 2013.

Slides:



Advertisements
Similar presentations
Optimum Prime Mover Sizing in Combined Heat and Power Systems
Advertisements

Overview of the South African Renewable Energy Independent Power Producer Programme (IPP Program) Bruce Linke Finance and Projects 30 April 2012.
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
1. What Do We Know About Our Energy and Climate Policy? John W. Rowe Chairman and CEO, Exelon Corporation Grand Challenges of the 21 st Century Conference.
JBIC’s New Operation for Environmental Projects “GREEN” Takahiro Hosojima Chief-representative in Rio de Janeiro Japan Bank for International Cooperation.
MIDA BIOMASS CONFERENCE JUNE 2015
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
China’s Sustainable Energy Policy
Energy Efficiency in the Power sector Mariangiola Fabbri WWF EPO - Climate and energy unit Ad Hoc Group on Energy Efficiency, 27th March 2006.
Starting a Community Woodfuel Initiative - Biomass Funding 28th November 2009 Ian Cowe Biomass Development Officer Forestry Commission Scotland Aberdeenshire.
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
Rory McIlmoil, Downstream Strategies. Introduction to distributed energy The case for distributed renewable energy Opportunities for developing distributed.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Energy Portfolio Committee Public Hearings on Cogeneration of Electricity 25 July 2013 K.M. Nassiep CEO-SANEDI General Introduction to Cogeneration (Context.
SOURCES OF ENERGY IN POLAND by Jakub Chojnacki.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
COPYRIGHT © 2010 BALLARD POWER SYSTEMS INC. ALL RIGHTS RESERVED B A L L A R D P O W E R S Y S T E M S PUTTING FUEL CELLS TO WORK NOVEMBER 2010 Utilizing.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
Event Location Event Date and Location ADC WINTER FORUM | PAGE 2 Development Issues Energy Project Siting Considerations Tom Graves, Burns & McDonnell.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Energy Efficiency – The First Fuel The Danish Experience Jiangsu - May 21st 2015 Counsellor Christian van Maarschalkerweerd – Embassy of Denmark.
Capital District Regional GHG Inventory CDTC Planning Committee Meeting 10/1/2014 GHG emissions (MTCDE)
EU Environmental approximation in the WB and Turkey- ETNAR Conference Climate, transport and energy policy analysis in Serbia Zvezdan Kalmar Leona Mezei.
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
CONFIDENTIAL AND PROPRIETARY Any use of this material without specific permission of The Birchman Group is strictly prohibited. The Birchman Group “Non-Fossil.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Demand Response How to make money by not using electricity?
And the Technologies to use it. Tina Kaarsberg, PhD House Science Committee, Energy Subcommittee For For Producing Energy:
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
Intermediation of Small-Scale Carbon-Financed Clean Infrastructure Projects – The Development Bank of Southern Africa’s Experience and Prospects Rob.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
New Zealand Bioenergy Update Ian Nicholas. Image goes here Why Bioenergy in NZ?  Renewable  Carbon Neutral  Predicted and managed  Stored and transported.
15 November 2011 Response to NCCRWP EKC 1 Response to the NATIONAL CLIMATE CHANGE RESPONSE WHITE PAPER 2011 Presented to The Portfolio Committee on Water.
1 Cogeneration in the Forest Products Industry January 2008 by Phil Zirngibl.
World Energy Outlook 2015 Deputy Director General Petteri Kuuva WEC Finland, 23 Nov
Energy for Urban Development in Thailand by Munlika Sompranon 24 June 2015 National Dialogue on the Urban Nexus in Thailand.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
Presentation to Select Committee on Economic Development
An embedded cogenerators response Andrew Carr
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
UNFCCC COP 19 The case of Turkish Industry on transition to low carbon economy: Opportunities and Challenges.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Umwelt und Infrastruktur Regional Energy Advisory Platform – East Africa 1, November 19th, 2008 The Clean Development Mechanism (CDM) in Eastern Africa.
Seite 1 Seite Seite 1 Renewable Energy & Efficiency Energy open the pathway to affordable sustainable energy Presentation by Dr.
About Us Overview Off Grid Technologies is a premier engineering & consulting firm that specializes in renewable energy projects in commercial, industrial,
Chapter 4 An Enduring Energy Future. Cont. キ Central electric generating stations will continue to be part of the electricity supply system in order.
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
PRESENTATION TO PORTFOLIO COMMITTEE ON ENERGY 25 JULY 2013
ELECTRICITY PRICING POLICY AND IMPACT ON THE MULTI YEAR PRICE DETERMINATION BY NERSA Matthews Bantsijang 7/6/2018.
NS4960 Spring Term, 2018 China: Expanded Renewables
ENERGY STORAGE IN ENERGY POLICY URUGUAY 2030
City Council April 30, 2018 Item 13
Progress on the Renewable Energy IPP Procurement Programme
OUTLINE RE Programme Objectives Integrated Resource Plan
Presentation transcript:

Submission on the cogeneration of electricity 25 July 2013

Introducing Prana Energy The type of projects covered by our submission Characteristics of Waste Energy Recovery projects What we need from Government Questions AGENDA

Introducing Prana Energy

Prana Energy Prana Energy started developing cogeneration projects in 2006; We are considered to be one of the leading project developers in the cogeneration space; We formed a JV with Exxaro in 2007 (“Exxaro On-Site”) with the specific aim of the JV being developing cogeneration projects as these projects were perceived to be the “low-hanging fruits” back then; Exxaro On-Site submitted cogeneration projects with a combined capacity of 930 MW into Eskom’s Pilot National Cogeneration Programme (“PNCP”) in 2007 but withdrew these due to a poor PPA; We have roughly 200MW of projects which can be delivering electricity within 24 months if an appropriate regulatory environment existed

The type of projects covered by our submission

Combined Heat and Power (CHP) Electricity recovered from waste Pulp and Paper Sugar Biomass Natural gas Etc. The co-generator has significant control over the fuel source The co-generator has no control over the fuel source - at the end of an industrial process Ferrochrome smelters Ferromanganese smelters Cement kilns Steel manufacturing Etc. Not covered by our submission Covered by our submission

Characteristics of Waste Energy Recovery projects

Cogeneration from waste energy recovery Quick to implement relative to new-build coal (circa 24 months) As “green” as electricity from wind, solar and hydro – i.e. it reduces carbon emissions It also typically have further environmental benefits – e.g. reduced air pollution The grid connection points are already in place – no additional transmission infrastructure required The electricity is not exported back into the grid as generation is typically less than the on-site consumption – i.e. reduced grid losses Fantastic grid alignment (almost like base-load) – see next slide

Fantastic grid alignment If the demand from the industrial process on Eskom is HIGH, the cogeneration plant produces A LOT of electricity If the demand from the industrial process on Eskom is LOW, the cogeneration plant produces LESS electricity

Economic Comparison of Technologies c/kWh Avoid peaking / mid merit plant costs? Avoid deep grid connection costs Reduction on transmission losses Solar (PV) 140 * X  / X Solar (CSP) 165 * X  / X Wind 100 * X  / X Hydro (small) 106 *   / X Biogas 80 *   / X Biomass 140 *   / X Natural Gas **   / X Coal **   / X Peaking (diesel) **   / X Energy recovery  * Based on REIPPP round 3 caps ** Estimates

What we need from Government

1.We need continuity of policy.... We have been developing 2 cogeneration projects (Waste Energy Recovery) with generation capacity of 60MW; These projects are only viable if there is an IDM type subsidy available but given that this was the case until April of this year, we spent in excess of R15m on developing these projects; In April, the IDM subsidy was abruptly taken away as part of NERSA’s MYPD3 ruling; No alternative is being offered... i.e. a total discontinuity in policy These projects may have to be terminated at a time when the grid desperately needs it The Prana projects are not the only casualties

What we need from Government (cont.) 2.The cheapest / quickest / best way to make these projects happen is a once-off up-front capital subsidy This is similar in nature to the IDM subsidy which existed at Eskom for cogeneration projects until March / April this year and which already enabled a number of cogeneration projects successfully Our request is that the IDM subsidy which previously existed within Eskom be re-activated (very easy to do) until such time as an alternative mechanism exists (as per the NERSA ruling) Our further request is that sufficient funding be made available to Eskom (from an alternative source?) and that they be given a temporary mandate to tailor the amount of the IDM subsidy to enable these projects as long as pre-agreed economic and commercial criteria are met

Up-front capital subsidy Subsidy makes the price of cogenerated electricity comparable to that of Eskom

Up-front capital subsidy (cont.) Cheap.... the IDM subsidy at ZAR 5.25m/MW works out to roughly 8 c/kWh for the Prana projects already submitted to Eskom. It is far cheaper than anything else but the size of the subsidy required will differ from project to project Quick.... the IDM infrastructure and legal framework already exists at Eskom and is being used for other energy efficiency projects Alignment of interest.... There is perfect, self-regulating alignment of interest as the owner of the cogeneration plant has to provide the rest of the capital – i.e. there is a very strong incentive to make sure the plant produces electricity A proven mechanism... It already worked in South Africa and is widely used internationally

Thank you