GLAST LAT ProjectMarch 24, 2003 6D Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 6D: Composite Panel Fabrication.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 1 Gamma-ray Large Area Space Telescope Status of the EM Vib Tests GLAST Large Area Telescope: GLAST Large.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectPeer Review, March 24-25, E2 1 Gamma-ray Large Area Space Telescope 7E2: EM test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TART recommendations implementation and qualification program results Alessandro.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
Procedure for MCM rework on tray MID 070
Mini-Tower test results
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication Thomas Borden Stanford Linear Accelerator Center Tracker Subsystem Engineer Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Agenda Facilities Tray Description and Types Manufacturing Flow Plan Tooling Quality Assurance Trays Production and EM Results Conclusions

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Facilities Carbon- Fiber Wall Plyform SpA, Varolo Pombia; Prime Contractor to INFN for Tray Fabrication and Assembly, –Subcontractor for closeout machining –Subcontractor for insert machining INFN Pisa; ESPI Test of bare panels –Holographic test –System can detect de-lamination defects in face sheets, between face sheet and honeycomb and between face sheets and closeouts Centrotecnica, Milan; Tray vibration testing of panels with bias circuits and tungsten –Qualification levels –Verification of fundamental frequency –Workmanship

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tracker Mid Tray

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tray Types Tray TypeHoneycomb Core Face sheet Plies Tungsten Converter MID1 lb/ft 3 43% Xo LIGHT1 lb/ft 3 4NO HEAVY3 lb/ft 3 618% Xo TOP1 lb/ft 3 43% Xo BOTTOM3 lb/ft 3 6NO

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Manufacturing Plan Production Flow Diagram Machine Closeouts (outside Vendor) Dimensional Verification of Closeouts Install Inserts ref I.L & I.L Dimensional Verification of inserts Incoming Material receiving Inspection ref I.L Face Sheet Lay-up ref I.L Assembly of Face Sheet with Honeycomb with Redux 312 UL Assembly of Face Sheet/Honeycomb and Closeouts ref I.L Dimensional Verification and ESPI Testing (workmanship)

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Manufacturing Plan Production Flow Diagram Cont. Assembly of Tungsten to Panel Ref I.L Assembly of Bias Circuits to Panel Ref I.L Final Trimming and Cleaning Ref I.L Final Dimensional Verification, weighing and QA Ship to INFN Ref I.L All assembly processes per LAT-PS Workmanship Vibration Testing at Centrotechnica

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tooling All assembly tooling documented and released All assembly tooling, and procedures, “proof tested” with EM hardware Additional copies of “standard” tray tooling in production Sufficient tools available to support production rate of 10 standard, 4 thick, one top and one bottom tray(s) a week

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tooling Tray assembly bottom plate Tray assembly top plate

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tooling Closeout bars

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tooling Closeout Insert Assembly Tool

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Quality Assurance All processes controlled by ISO approved procedures at Plyform (I.L , I.L , I.L ) Regular INFN-Pisa oversight at Plyform Data Base Developed Nonconformance Reporting –Plyform nonconformance reporting system per I.L. 02- –LAT-PS specifies the following major Nonconformance reporting limits require halting production: Rejection during dimensional inspection of more than 4 of the trays produced out of a continuous sample of 40 trays. Rejection during dynamical tests of more than 4 of the trays produced out of a continuous sample of 40 trays. Accidents resulting in irreparable physical damage (serious enough for tray rejection) to more than 2 of the trays produced out of a continuous series of 40 trays.

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Data Base Main form: select tray type access all tray data Tray data sheet: assembly data bare panel measurements final tray measurements (TBD) subcomponents IDs and data click on buttons to access details Luca Latronico – INFN Pisa

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Data Base continued Bare panel dimensions (after clicking on dimensions button): plots measurements of reference points along tray structure plots sides BD/AC flatness, orthogonality, parallelism seen by moving slide bar Luca Latronico – INFN Pisa Luca Latronico – INFN Pisa`

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Data Base continued Luca Latronico – INFN Pisa Each submask containing detail measurements data and has a clickable legend for reference – MCM legend shown here for example

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Data Base continued Luca Latronico – INFN Pisa Connected to Ladders DB – this mask tracks ladders IDs, location and currents (pre- encapsulation and post- encapsulation) as measured at G&A/Mipot. Location/names given according to LAT-TD convention, e.g.: F – Front Side B - Back Side 0 - connected to FE 0 side …. 3 – connected to FE 23 side

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST:Gamma Ray Large Area Telescope Trays Production & E.M. Results R. Bagagli INFN - sez. Pisa

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS E.M. Tray Production Tray nameFace sheethoneycombTungsten Top4 plies1lb/ft 3 3%Xo Mid4 plies1lb/ft 3 3%Xo Light4 plies1lb/ft 3 // Heavy6 plies3lb/ft 3 18%Xo Bottom6 plies3lb/ft 3 // Defective4 plies1lb/ft 3 //

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS ) Dimensional Check procedure on the tool: - measure the tool in six points with a caliber - fill a form to compare the reference values with the measured values - If measured values are otuside ±0.03mm, then the operator has to adjust the lateral wall and to check again the value E.M. Results: ASSEMBLING IMPROVEMENTS

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS The glue fills all the bonding area - The exceeding quantity goes out and will be removed in Refining Step Glue-line on the sandwich with dispenser on the bonding area (to avoid no-bonding area) Vacuum bag at standard temperature (to avoid air inclusion) E.M. Results: ASSEMBLING IMPROVEMENTS

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Reference wall Upper plate Tray Skin Lower plate Tray assembly tool Tungsten assembly tool Kapton assembly tool Trimming tool Tray assembly tools toolIn houseUnder construction total assembly tool 347 Tungsten tool 213 Kapton tool 112 Trimming tool 101 Tray assembly rate capability: 3 trays/day

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS E.M. Results: DIMENSIONS

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS E.M. Results: FLATNESS

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS E.M. Results: ORTHOGONALITY & PARALLELISM

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS E.M. Results: TRAY DATABASE

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Tests

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Bare Panel: N.D.I. Test

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Bare Panel: N.D.I. Test Honeycomb – Skin debonding ESPI: Thermal Loads very effective to detect bare panel defects Honeycomb crash Skin-closeout debonding

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS TG07: Bare Panel + W + Bias Plane ESPI: Vibration TEST 817Hz first resonance mode 1860Hz second resonance mode

GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS Conclusions All documentation in place. Database in place. Production Readiness Review scheduled for April 15, All tray materials needed are delivered or on order and will be available before need date. Tray production will begin on May 1, 2003