P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Total Productive Maintenance
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
NATALIE BECK JEFF MORRIS ROBERT SIMON Clean Teeth, Inc.
Job Element Sheet Process: Cheesecake Bake – Dropper Process Author: Andreana Crance, RIT MSD Date/Revision: 2/5/10, Rev 0 1. Obtain dropper2. Set up dropper.
Mission Statement: The aim of this project is to improve the meat marinade tumbler transport in the Wegmans Culinary Innovation Center. Currently, meat.
TOTAL PRODUCTIVE MAINTENANCE
Just-In-Time and Lean Systems
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Andreana Crance Kevin Rodas Rob Santora Jeremy Smith Matt Syska 1.
1 Job Element Sheet Process: Cheesecake Bake – Oven Loading Process Author: Andreana Crance, RIT MSD Date/Revision: 2/13/10, Rev 0 Set-up Instructions:
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
MSE507 Lean Manufacturing
P09713 – FRESH BREAD AND ROLL SCALING ROOM Customer Needs and Product Specifications Senior Design I: Winter Cecilia Enestrom, Kate Gleason,
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Lean Manufacturing Chris Poteet Scott Carroll.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Value Stream Mapping.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Freeleansite.com The Lean Enterprise Why Change ? Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Problem Description The process of saucemix delivery is high in Non-Value Adding (NVA) activity (98%). The process highlights long distances travelled.
Based on the book: Managing Business Process Flows.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
Safe Patient Handling.
The Simulation Project. Simulation Project Steps a.- Problem Definition b.- Statement of Objectives c.- Model Formulation and Planning d.- Model Development.
Value Analysis/ Flow Analysis
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
CHEESECAKE DEPANNING Zach Alsheimer Garth Sinclair Matt Gundrum Casey Bauman.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Philosophy and Key Concepts
Saving Healthcare Workers From Back Injuries Healthcare Ergonomics Part I – A Case for Implementation Massachusetts Care Self-Insurance Group, Inc. S.
Cost Control Chapter 8 Controlling Other Expenses.
Managing Processes and Capabilities CHAPTER THREE.
“Without the Cost of Waste …”
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Traditional Approaches to Facility Layout
S Visual Workplace Process
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
Process Characteristics
HOME Copyright EASE Inc Tutorials© The “5S” Philosophy An EASEworks® Manufacturing Tutorial START Ver 6.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Yellow Belt Training 10 Step Kaizen Process
Incredible Logistic Solutions, Inc
Introduction to OEE (Overall Equipment Effectiveness)
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Quality Management Checklist An essential guide to assist you, the quality expert, in enforcing the standards you expect on a daily basis across the whole.
BASIC ERGONOMICS TRAINING PROGRAM. WHAT IS ERGONOMICS? - It is the practice of arranging the environment to fit the person working in it. - Ergonomic.
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
Process Layout Chapter #6.
Wegmans Projects Matt Syska, Industrial & Systems Engineering Andreana Crance, Industrial & Systems Engineering.
Introduction to Methods Engineering
LEAN ORGANIZATION SUMMARY
KAIZEN PROCESS INTEGRATING MANUFACTURING & SPECIAL PROCESSING.
P09712 Commercial Roll Line Shrink Reduction
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
$Million Minimum Wage Increase Challenge
Presentation transcript:

P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska

Meeting Agenda Brief Project Summary 5 min. Project Statement 5 min. System Overview 10 min. Customer Needs & Engineering Specifications 5 min. Risks & Contingencies 5 min. What we have done so far 20 min. Concept Selection 15 min. Target Specs – How we will measure success 10 min. Improvement Ideas 10 min. MSDI Plan of Action 5 min.

P10712 Cheesecake Process Improvement The mission for the cheesecake process improvement is to increase the efficiency and effectiveness of cheesecake production in order to meet customer demand in both quantity and quality of the cheesecakes. Focusing on: Worker Safety Worker Productivity Efficiency of Process Proper utilization of equipment Scrap Reduction

Project Approach  Due to the scattered processes taking place for the cheesecakes, we thought it would be best to break the project into larger categories: Greasing Crumbing Pre-Tunnel Oven Mixing, Pouring, Loading Oven Post-Tunnel Oven Unloading oven, into freezer Slicing Packaging

System Overview

Value Stream Map

Customer Needs & Engineering Metrics

Risks and Contingencies

Process Evaluation Weight GreasingCrumbing Pre-Tunnel Oven Post Tunnel Oven SlicingPackaging Score Efficiency25% Utilization25% Safety25% Equipment10% Scrap15%391339

Pre process clean up Sprayer Calibration Human bending Greasing Efficiency1 Labor1 Ergonomic9 Equipment3 Scrap3 What we have observed in Greasing:

What we have observed in Crumbing:  No Direct Observation as of 10/2/2009  Known Issues:  Uneven distribution of crumbs Leads to scrap issues  Manual process  Nonconformity of crumb size  Crumb displacement at batter drop (pre-oven load) Crumbing Efficiency3 Labor3 Ergonomic3 Equipment9 Scrap9

Pre-Tunnel Pre Oven Efficiency9 Labor9 Ergonomic9 Equipment9 Scrap1 Cluttered area Human bending Labor intensive

Post-Tunnel Post Oven Efficiency1 Labor3 Ergonomic3 Equipment3 Scrap3 Cluttered area Manual process No standards

Slicing Issues  5S issues  Labor Utilization  Material Handling transitions  Scrap Issues  Machine maintenance reactive  TPM – Be proactive!  Staffing setup  Almost identical labels (marble vs. plain)  Lack of Quality Check-One instance of packing defective cheesecake  Walking  2s spin time for machine  Ergonomics – Bending and reaching  Putting covers on causes quality issues / lost productivity  No monitoring of cheesecake time on floor (out of freezer)  Variation in results due to lack of process control Slicing Efficiency9 Labor 9 Ergonomic3 Equipment3 Scrap3

Packaging No dedicated labor Reaching and bending Lack of organization Packaging Efficiency9 Labor3 Ergonomic3 Equipment3 Scrap9

Overall Issues  No standard procedure  No standard location for equipment on floor  Improper/inadequate tools used  Lack of set schedule for cheesecake process  Variable batch sizes  Lack of standard quality checks  Unnecessary movement (time & ergonomics concern)  Current machines may not be ideal  Lack of continuous flow

Concept Selection  Discussion

Target Specifications – Marginal and Target Values Metric No.MetricImportanceUnitsMarginal ValueTarget Value 1 average labor bottleneck utilization 9percentage per year>80%>85% 2risk of injuries9 (benchmarking unit using NIOSH, etc) 25% reduction of benchmarking unit 75% reduction of benchmarking unit 3people travel distance1 % travel distance reduction 10%25% 4 cycle time / cheesecake (minus bake time) 3min. 90% of current cycle time 75% of current cycle time 5 number of defective products 3Percentage scrap 75% of current defect rate 50% of current defect rate 6 number employees on cheesecake process 3employees One employee reassigned More than one employee reassigned 7throughput rate3throughput/hour110% of current value125% of current value 8 process improvement has full ROI for customer 9Years1 Year0.5 Years 9 Solutions meet Wegmans specific health code standards 9Y/NYY 10 Cheesecake retains “homemade” feel 9Y/NYY 11Process changes can meet holiday demand 9Y/NYY

List of Possible Ideas  Efficiency  Standardize batch size  Continuous flow of process  Waste reduction maintenance for equipment: Dropper, greaser, slicer  Standard locations for materials and equipment

List of Possible Ideas  Scrap  Quality Checks: “Defect Board”  Calibration of equipment: Dropper, greaser, etc.  Efficiency, Safety  Reduce total travel distance: people and materials  Efficiency, Safety, Equipment  Eliminating unnecessary motions, providing proper tools

List of Possible Ideas  Crumbing - (Labor Utilization, Scrap, Equipment)  Automated or assisted “Crumber”  Pre/Post Tunnel Oven - (Scrap, Utilization)  Regulate water for baking: volume controlled and assisted  Packaging - (Scrap, Efficiency, Utilization)  Alternative packaging methods

MSDI Plan – Our steps forward