1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

COST EFFECTIVE MASS HOUSING TECHNOLOGY
Heavy Concrete Construction Formwork
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
[[Click on topic to view page]]
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Hargrave Street Pumpstation – Site Preparation July 2014.
Chapter 34 Bridge Construction.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
TSIGELI PORT Located west coast Gulf of Pagassitikos Lat: 39  10’- 39  11’N & Long: 22  49’-22  51’E.
Rev: Section 3 Framing Operations. Rev: Learning Objectives: Section 3 Understand when fall protection must be provided Evaluate the use.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Most Frequently Cited Serious Violations Construction – FY 2008.
Construction Technology Bachelor of Science (hons) in Quantity Surveying ITS April 2008.
Temporary Works – What Needs to be Done
Rectangular framed structures
Fall Protection in the Roofing Industry
First conceptual design 3D Side view Arch supporting the structure.
Southeastern OSHA Training Institute Education Center Fall Prevention in the Construction Industry 29 CFR 1926: Subpart M.
Unit 1 Types of Construction
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
2001 Winter Presentation. Site Location Site View.
Fall Protection Review. Objectives Increase management sensitivity on Falls safety Increase disciplined compliance to policies and procedures Increase.
PRECAST CONCRETE CONSTRUCTION
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
PMP1 Taija Puolitaival Unitec 2012 Presenters Tony Bosnich Glenn Edmonds 2014.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
BY NGETICH KIPYEGON 2012/BC/25435 Dept of Building Construction Narok Technical Institute. 1/21/2016.
Safe by Design Safe by Design Operation Maintenance and Repair
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Planning and Organising Two Plant and Equipment - Cranes- ConstructioConstru cc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich Glenn Edmonds.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
COFFERDAMS.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Construction Methodology for Suramadu Main Bridge.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Concrete Products Manufacturers in Dubai
Fall Protection for Construction
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Most Frequently Cited Serious Violations
Temporary Works – P8 Project Practice.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Most Frequently Cited Serious Violations
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
CONCRETE FORMWORK Formwork.
A. Datum Corp. Bid package overview.
Minuteman Vocational Technical Regional High School Progress
Presenter Tony Bosnich 2015
Pier Foundations Piers Suspended floor Ground beam Next slide.
Presenter Tony Bosnich Oct 2015
The Acorn Medical Practice, Wood Street, Mansfield
Concrete A structural material made by combining cement, sand, aggregate, and water.
Most Frequently Cited Serious Violations
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

1 CV4902- Construction Methods Dr David Chew

2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary works Choice of construction methods Types of construction machineries & equipment to be used Potential problems & difficulties during construction Contingency plans for item above Safety precautions & measures Site maintenance & cleanliness Outline of construction cost Outline of construction schedule

3 Outline of Construction Procedure Phase 1 * on-site works - site clearance & mobilization - erecting hoarding/safety signs - setting up site-office & facilities - creating access/excavation works - piling & excavation

4 Phase 1 (Continued) * off-site works - fabricate formworks - fabricate reinforcements - fabricate precast concrete (or steel) beams - fabricate precast concrete (or steel) staircases

5 Phase 2 * Construction of pile-caps * Construction of concrete piers * Construction of concrete cross-heads Phase 3 * launching of precast concrete/steel beams * launching of precast concrete/steel staircases * concreting of slab (floor)

6 Phase 4 * Erection of steel roof truss * Other building structural works under the roof * Installation of roof cladding

7 Phase 5 * inspection * testing & commissioning * permit for occupation/use * handover * operation

8 Things To Look Out For Underground Services (Check, Double- Check!) Existing Foundations (Removed?) Safety during Construction/Road Diversion Site Constraints Access for Works Launching of Precast Beams/Columns Launching of Roof Truss

9 Site Constraints Protection of Surrounding Structures/Facilities Types of Heavy Machineries to be Used Noise/Air/Water Pollution Disposal of Spoils and Wastes Limitation of Working Hours Just-In-Time Construction

10 Safety Considerations Public Safety Safety Distance of Heavy Construction Machineries (from Existing Buildings & roadway) Restrictions during Busy Traffic Hours Protection of Existing Facilities Stability of Temporary Supports Procedure for Beam/Column Launching & Securing Stability of Lifting Crane during Launching