Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
1 Effect of staging on module connection and support arrangement Yury Ivanyushenkov RAL.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM29.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MICE CM 32 Wrap UP. Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11,
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
1 OPTICS OF MICE STEP V.0 Ulisse Bravar University of New Hampshire 26 June 2005.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
CM Nov 2009 DOES MICE NEED STEP III ? Somewhat hard to understand MICE Schedule… –If the gods are (un)kind it’s possible that SS1, SS2 & FC1 are.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
MICE Spectrometer Solenoids Step IV running
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Status of the MICE Construction Project
MICE CM31 Schedule summary
Controls & Monitoring in MICE
Presentation transcript:

Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood

Step IV Goal: Make this graphic a Photo - Christmas ‘12 MICE CM 33 June 25-29, & THE goal of this meeting is to make sure we have not missed anything Spoiler – We have!

One step MICE CM 33 June 25-29, First SS is cold & is being trained. Operating with ~ 3X excess cooling capacity. Roy will give us the latest

Next Step MICE CM 33 June 25-29, Getting close to having the first AFC at RAL Tom will give us the latest

Schedule You will get an update from Andy MICE CM 33 June 25-29, STEP IV STEP V STEP VI NB: target date 2016

Schedule - Coupling coils MICE CM 33 June 25-29, Isn’t that graphic informative? Bottom Line – w/r to CC, MICE Step VI – Christmas ’15 Technically limited. Steve G. will give us the latest

System test of MICE RF MICE CM 33 June 25-29, Allan & Yagmur will cover

MICE RFCC Lite System Test MICE CM 33 June 25-29, 20128

Meeting outline Review activities and progress of MICE  Schedule  Magnet reports (AFC, SS, CC)  Magnetic field (external to “MICE channel”)  Operations  (MOM, target, DAQ, controls and monitoring)  Results from April-May run  Publications (Beam line paper - out)  Understanding of the physics of the experiment (Analysis session)  Software development Planning for Step IV  Where are we?  Magnets, EMR, LH 2, Solid absorbers  Stray B field issues  February 2013 start Step IV? Planning for MICE Step VI  RFCC modules, RF power MICE CM 33 June 25-29, 20129

On the front Quite interesting since our last CM  No Virginia, s do not travel faster than the speed of light (well, maybe in Italy)  But, yes,  13 is large  & we already know its value to excellent precision  The NF is simpler, cheaper, & still blows away the competition  But it is still much more expensive than the competition  Plus in Kyoto  MiniBooNE showed new results on e / e -bar appearance.  No longer diff between and -bar & significance > 3  3.8 in combined fit)  Well, Virginia, there are >3 s ? MICE CM 33 June 25-29,

We do indeed live in exciting Times The next year WILL be exciting! – It Will be stressful but, I hope, very rewarding 2013 WILL yield the first cooling measurements And we have a good chance of seeing the final component (RFCC) tested MICE CM 33 June 25-29,

On To CM 33 MICE CM 33 June 25-29, “Next time: Haggis, deep-fried Snickers and Single-Malt” Tried Haggis – Deep-fried Snickers – pass Single malt – Now you’re talking