Presentation is loading. Please wait.

Presentation is loading. Please wait.

MICE CM 32 Wrap UP. Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11, 20122.

Similar presentations


Presentation on theme: "MICE CM 32 Wrap UP. Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11, 20122."— Presentation transcript:

1 MICE CM 32 Wrap UP

2 Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11, 20122

3 But

4 All Magnets MUST WORK! – No Mistakes, No risk taking, We get no MORE Mulligans! Then: Assembly and integration of all the subsystems in limited space this year is a challenge! Integration/Engineering activity needs better communication. Positioning of magnetic-field sensitive equipment is now highly critical. Alan BrossMICE CM 32 February 8-11, 20124

5 What are the implications of this? We can sleep When we are Dead * * Apologies to Warren Zevon who is, unfortunately, now sleeping

6 Instrumentation, DAQ, Online, Offline, Analysis Target operations and Development – Projections indicate stable and long-term running in MICE Cerenkov, TOFs, KL, Trackers – Ready to Go (Mostly) EMR – On Track DAQ, Online, Monitoring and Analysis – All making Excellent progress Alan BrossMICE CM 32 February 8-11, 20126

7 Step IV…. Magnets, Magnets, & more Magnets * * Plus some explosive bits

8 Spectrometer Solenoids First SS ready for leak check in 2 weeks – Arrives at RAL mid-June Second in close pursuit – Arrives at RAL late August Alan BrossMICE CM 32 February 8-11, 20128

9 AFC Alan BrossMICE CM 32 February 8-11, 20129

10 LH 2 System R&D complete and Test cryo decommissioned – June 12 Alan BrossMICE CM 32 February 8-11, 201210

11 And then a bit of magic * …. * I mean much hard work!

12 Step IV Goal: Make this graphic a Photo - Christmas ‘12 Alan BrossMICE CM 32 February 8-11, 201212

13 And then, there will be no sleep, even when we are Dead (tired)

14 Alan BrossMICE CM 32 February 8-11, 201214

15 Step VI Alan BrossMICE CM 32 February 8-11, 201215 My Goal: Photo Christmas ’15 ±

16 “May you live in exciting Times” * The next 9 months WILL be exciting! – And we all hope very rewarding 2013 WILL yield the first cooling measurements And prepare the way for MICE – the Final Frontier * Chinese curse? - 寧為太平犬,不做亂世人 níng wéi tàipíng quǎn, bù zuò luànshì rén Alan BrossMICE CM 32 February 8-11, 201216

17 On To CM 33 Alan BrossMICE CM 32 February 8-11, 201217 Next time: Haggis, deep-fried Snickers and Single-Malt Apologies to Yordan


Download ppt "MICE CM 32 Wrap UP. Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11, 20122."

Similar presentations


Ads by Google