Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.

Slides:



Advertisements
Similar presentations
Proton and neutron radiation facilities in the PS East hall at CERN Maurice Glaser, Michael Moll, Federico Ravotti CERN.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
FUTURE IRRADIATION FACILITIES AT CERN Lucie Linssen PH/LCD - for the Irradiation Facilities WG  Introduction.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
WP8.3.2 Common infrastructure for facilities Sensor cooling at the Birmingham Irradiation Facility Maurice Glaser Frederico Ravotti Michael Moll Gianluigi.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
East Area Day, 1 February 2012 Lau Gatignon / EN-MEF.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
M.Moll, M.Silari, H.Vincke – 3.April Feedback  In total 134 forms filled:
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Neutron measurement with nuclear emulsion Mitsu KIMURA 27th Feb 2013.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
DT News CJ DT Annual Report 2010 CJ Measurement of the LHC Luminosity André Braem, Matthieu Heller with Scintillating Fibre Detectors in Roman Pots DT.
Lau Gatignon, EATM,  The construction of the CHARM and IRRAD zones is completed and operation at nominal intensity started yesterday.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Charge Collection, Power, and Annealing Behaviour of Planar Silicon Detectors after Reactor Neutron, Pion and Proton Doses up to 1.6×10 16 n eq cm -2 A.
Status Michael Moll CERN PH-DT Contents: WP8 – Task overview Status of tasks Status of Milestones and Deliverables AIDA 1 st Annual Meeting, DESY, Hamburg.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
M.Moll – Radiation damage in scintillating fibers -Preliminary literature study- I am no expert in the field  consume results with care.
Breuker Feb Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Lau Gatignon / EN-MEF. L.Gatignon, IEFC Workshop, 22 March 2011What Future for the PS East Area 2 * Introduction * Present and foreseen activities in.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
RF separated beam and other beam issues Lau Gatignon, COMPASS workshop, 22 March 2016.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Radiation hard, micro-engineering solutions for thermal management in high energy physics and space applications Diego Alvarez Feito, Julien Bonnaud, Enrico.
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
June 22, 2017 Burkhard Schmidt for the DT coordination team
Sep th Hiroshima Xi’an Test-beam evaluation of newly developed n+-in-p planar pixel sensors aiming for use in high radiation environment.
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
WP8 – Improvement and equipment of irradiation beam lines
Towards a Unified Environmental Monitoring,
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Working for a detector project: A message from AIDA
Irradiation Facilities Questionnaire
East Hall under construction
IRRAD Facility Infrastructure Upgrade
CERN Testbeam facilities
2017 AFP Beam Tests AFP has 1 week as main user and will also measure together with ATLAS ITk Pixel in H6B -> 2 periods of ~3 weeks
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
the field of Solid state Detectors This comprises
Radiation Working Group RADWG
Presentation transcript:

Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes for discussion -

CERN PS East Hall - Irradiation Facilities 24 GeV/c protons T7 & T8 beam lines in East Area  Proton irradiations  Direct exposure to 24 GeV/c protons (IRRAD1, IRRAD3, IRRAD5)  Low intensity radiation field of backscattered particles (SEU and Dosimeter testing) (IRRAD6)  Neutron (mixed field) irradiations  Mixed field produced in cavity after carbon (50cm) iron (30cm) lead (5cm) ‘target’ (IRRAD2)

Summary of present beam properties  Proton irradiation facility  24 GeV/c protons (in spills of ~ 2  p over 400 ms), ~ 2 x 2 cm 2 beam spot, flux: ~  p cm -2 h -1  Shuttle system (10x10x20 cm 3 ) and irradiation tables/boxes for bigger objects  Neutron irradiation field  complex irradiation field dominated by neutrons, flux: ~ n cm -2 s -1 ( E n > 1 MeV ) at 50 cm position

CERN PS Facilities – Operation 2009  Operation in 2009 (M.Glaser) -- only proton facility operated  142 days of proton beam to facility  431 objects irradiated  337 dosimeter measurements performed (mainly spectrometry of Al foils)  Most complex irradiations  12 CMS ECAL & Crystal Clear scintillating crystals (get highly activated)  ATLAS silicon sensors for SLHC (cooling to low temperatures during irradiation)  Optical link system R&D for SLHC (system in operation during irradiation)  Main part of irradiations performed for  ATLAS, CMS, LHCb  RD39, RD41, RD50, RADMON  Operation in 2010 (M.Glaser)  expect about 150 days of operation (as in 2009)  3 weeks of pion beam at the PSI (~280 MeV/c.) + 1 week of setup

M.Glaser, 19th DT coordination meeting (PS-Irrad & GIF) 20/8/2009 Example: 8/09 ATLAS optical links  LHC Experiments Atlas Upgrade (Ohio University, K.K. Gan) IRRAD1 IRRAD3

 Participants in upgrade activities  M.Glaser & M.Moll (less than 10% FTE each)  2009: Fabio Rivero : Student, 4 months, working on general facility services (funded by WP7)  Activities  Participation in CERN wide ‘Irradiation Facilities Working Group’ and in particular evaluation of future hadron irradiation facilities (see )  Planning and construction of new irrad. tables and cold box systems (to be continued in 2010)  2010  WP7 funding for student (8 months)  Finalization of irradiation table systems  Re-evaluation of plans for future hadron irradiation facilities at CERN and in particular EAST HALL FACILITIES in light of last Chamonix Meeting outcome New plans for upgrade of injector complexes: no PS2; PS to be used for another 25 years, …. New timing for LHC upgrade: more time to set up proper irradiation facilities (??) Activities - Upgrade of Hadron Facilities Vortex cooling tested …. to be continued in 2010

New installations 2009/2010: Irradiation Tables and Irradiation boxes

Table support system inside facility Table with ATLAS Tracker cold box mounted Table with ATLAS Pixel cold box mounted inside area (Vortex cooling test) IRRAD 3 IRRAD 7

M.Glaser & M.Moll, 6 th LHC Radiation Workshop, Proposal for facility upgrade  Present limitations and drawbacks  Irradiation tables are located inside the beam line complex (primary zone)  Access to primary zone needed to enter  Very restricted space, Backscattered particles superimpose primary beam  Personnel exposed to radiation (activated material around irradiation tables – e.g. magnets)  Neutron facility parasitic to DIRAC  Parasitic operation strongly limits flexibility  Proton & Neutron facilities located in different beam lines  Parallel operation of two facilities difficult  Proton and Neutron facility ‘competing’ for beam  Proposal: Proprietary beam line for irradiations  Combine proton and neutron irradiation facilities in one beam line  Increase space for irradiation areas (less background, less exposure to radiation of personnel)  Place facility in secondary zone (outside beam line complex)  Allow access with big objects to the neutron irradiation facility  Requires termination of DIRAC experiment in T8 beam line slide from 2007

M.Glaser & M.Moll, 6 th LHC Radiation Workshop, PS East Hall – Proposal for facility upgrade Protons (Shuttle) Protons (Tables, Boxes) Neutron field with rail system for heavy objects and remote access Neutrons (shuttle) slide from 2007

Restructuring of the East Area Lau Gatignon IEFC Workshop – Feb. 2010

Restructuring of the East Area Lau Gatignon IEFC Workshop – Feb What happened to IRRAD1 ?

Restructuring of the East Area Lau Gatignon IEFC Workshop – Feb. 2010

Remarks for discussion  PS will be consolidated and continue to operate for many years  Long term investments into irradiation facilities are justified again  No visible end to operation of DIRAC  Need to wait for DIRAC to stop dating data and dismantle (maybe years ahead to wait …?)  Write a counter proposal to take over the DIRAC area ?  East area will be restructured  What will happen to the irradiation facilities ?  Are we missing the opportunity for a proper planning of the facilities upgrade?  Some funding might become available through the AIDA proposal  Requested funds for the facilities: 0.5 Meuros (EU) Meuros (partners)  Need to better communicated with EN to understand what kind of measures could be taken to increase the proton intensity in the irradiation facility … … How to do? … to be discussed today …  Needs re-enforcement of man-power (and commitment) on PH side (for facilities operation or upgrade activities)