Cal y Mayor y Asociados, S.C.www.calymayor.com.mx Atizapan – El Rosario Light Rail Transit Demand Study 22-24 October 2003 17th International EMME/2 UGM.

Slides:



Advertisements
Similar presentations
BOULEVARD KUKULCÁN DEMAND STUDY, CANCÚN, QUINTANA ROO. BOULEVARD KUKULCÁN DEMAND STUDY, CANCÚN, QUINTANA ROO Casillas González Héctor F. González Lira.
Advertisements

THURSTON REGION MULTIMODAL TRAVEL DEMAND FORECASTING MODEL IMPLEMENTATION IN EMME/2 - Presentation at the 15th International EMME/2 Users Group Conference.
Integrated Public Transportation in Santo Domingo: An Educational Investment Carl Allen 5/02/10 A presentation based on research for COPDES, GFDD/FUNGLODE.
Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
Jeannie Wu, Planner Sep  Background  Model Review  Model Function  Model Structure  Transportation System  Model Interface  Model Output.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
Transportation leadership you can trust. presented to Regional Transportation Plan Guidelines Work Group Meeting presented by Christopher Wornum Cambridge.
Justifying Rail Bias Factor for Houston METRO’s Transit Model Presentation by Vijay Mahal, HDR Inc Vincent Sanders, Houston METRO May 18, 2009 TRB Applications.
Demand for bus and Rail Analyzing a corridor with a similar Level Of Service 5 th Israeli-British/Irish Workshop in Regional Science April, 2007.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
SACN PT Sustainability GAUTRAIN 1 SACN Seminar on sustainable PT SUSTAINABLE MEGA PUBLIC TRANSPORT PROJECTS Rapid rail project in Gauteng Romano Del Mistro.
Examining Potential Demand of Public Transit for Commuting Trips Xiaobai Yao Department of Geography University of Georgia, USA 5 July 2006.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
Junction Modelling in a Strategic Transport Model Wee Liang Lim Henry Le Land Transport Authority, Singapore.
Session 11: Model Calibration, Validation, and Reasonableness Checks
Public Expenditure Analysis May 4, 2007 Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment Your presenters: Annie Gorman Hazel-Ann Petersen.
Oceanside-Escondido Rail Line Final Project Presentation John R. VelascoMay 12 th, 2003.
The Potential BRT in Asia
InMoSion: Science Shop for Innovative Mobility Solutions for Mobility Challenged Europeans 3rd INTERNATIONAL MEETING ANKARA, TURKEY Partnering: Civil Engineering.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
May 2009 Evaluation of Time-of- Day Fare Changes for Washington State Ferries Prepared for: TRB Transportation Planning Applications Conference.
Managing Director/CEO
Miao(Mia) Gao, Travel Demand Modeler, HDR Engineering Santanu Roy, Transportation Planning Manager, HDR Engineering Ridership Forecasting for Central Corridor.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
1 Using Transit Market Analysis Tools to Evaluate Transit Service Improvements for a Regional Transportation Plan TRB Transportation Applications May 20,
Business Logistics 420 Public Transportation Lectures 8: The Performance and Condition of Transit in the United States.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
15 th TRB Transportation Planning Applications Conference Tuesday, May 19 th, 2015 – Atlantic City, NJ Integrating Travel Demand Models & SHRP2 C11 Tools:
Traffic Assignment Convergence and its Effects on Selecting Network Improvements By Chris Blaschuk, City of Calgary and JD Hunt, University of Calgary.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Trends in Urban Transit in the U.S. – Some Comparisons Edd Hauser, P.E., PhD Nicholas J. Swartz, MPA Center for Transportation Policy Studies UNC Charlotte.
Transit Estimation and Mode Split CE 451/551 Source: NHI course on Travel Demand Forecasting (152054A) Session 7.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Sketch Model to Forecast Heavy-Rail Ridership Len Usvyat 1, Linda Meckel 1, Mary DiCarlantonio 2, Clayton Lane 1 – PB Americas, Inc. 2 – Jeffrey Parker.
June 15, 2010 For the Missoula Metropolitan Planning Organization Travel Modeling
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
The Use of EMME/2 by Transek – an Overview “Fantasy and imagination is the limit” by Göran Tegnér Transek Consultants, Solna, Sweden Presentation for the.
1 The Aggregate Rail Ridership Forecasting Model: Overview Dave Schmitt, AICP Southeast Florida Users Group November 14 th 2008.
Characteristics of Weekend Travel in the City of Calgary: Towards a Model of Weekend Travel Demand JD Hunt, University of Calgary DM Atkins, City of Calgary.
23e Congrès mondial de la Route - Paris 2007 Public Transport in Gauteng Province: Order out of Chaos Prof Nevhutanda Alfred Department of Transport(South.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Transportation Planning, Transportation Demand Analysis Land Use-Transportation Interaction Transportation Planning Framework Transportation Demand Analysis.
Rapid Transit for Toronto February 8, Metrolinx “5 in 10 Plan” - October 2010 Light Rail Transit Projects New Rapid Transit for Etobicoke North.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Joint Development of Land Use and Light Rail Stations The Case of Tel Aviv Regional Science Association International -The Israeli Section Daniel Shefer,
Planning Applications Conference, Reno, NV, May Impact of Crowding on Rail Ridership: Sydney Metro Experience and Forecasting Approach William Davidson,
Presented to Time of Day Subcommittee May 9, 2011 Time of Day Modeling in FSUTMS.
Phase 2: Data Collection Findings and Future Steps.
TPB CLRP Aspirations Scenario 2012 CLRP and Version 2.3 Travel Forecasting Model Update Initial Results Ron Kirby Department of Transportation Planning.
TRANSMILENIO ENRIQUE LILLO EMME/2 UGM May Bogotá n 7 million people n Mean annual population growth of 4,5 % over the last 10 years n 25 % of Colombian.
Getting & Using Transit Data John Semmens Laissez Faire Institute & Arizona Transportation Institute.
The Current State-of-the-Practice in Modeling Road Pricing Bruce D. Spear Federal Highway Administration.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Amal S. Kumarage 4 th November 2015.
Modelling the Return of Sydney's Trams Louisa Sorrentino Veitch Lister Consulting.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
Industry Briefing 25 May 2016.
Yoram Shiftan and Shlomo Bekhor Transportation Research Institute Technion – Israel Institute of Technology Sustainable Transportation In Israel.
Karen Tsang Bureau of Transport Statistics Department of Transport
Bus Rapid Transit Study
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
Presentation transcript:

Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM Calgary, Alberta, Canada Sergio A. Lugo Serrato

Atizapan – El Rosario Light Rail Transit Demand Study 2 Corridor Characteristics LRT Line Length: 12 km Population in Corridor: 815,000 Existing Transit Routes in Corridor: 50+ Corridor Transit Demand: 392,000 daily passengers Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 3 Study Overview Objectives Estimate data to determine sizing and route of LRT Estimate social benefits and fee income Methodology Results Transit Corridor Analysis Demand Characterization LRT Demand Social benefits estimation Revenue estimation Demand Analysis Supply Primary Information Secondary Information Demand VOT: Mode Selection Model Corridor Analysis Ridership Estimation Social Benefits Estimation Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 4 Mexico City Overview Population 20 Million Annual Growth Rate 1.6% Registered Vehicles 3.9 Million 4% are transit vehicles Trips 29 Million daily 5.5 Million in 2hr peak period 81.7% use transit Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 5 Transit in Mexico City Mode Share 58% Low capacity transit 18% Private transportation 14% Metro (subway) and LRT 7% Buses 3% Suburban Metro Statistics 4.2 Million daily passengers 175 Stations, 11 Lines 3 Lines account for 65% of all passengers Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 6 Corridor Characteristics Population 815,000 inhabitants in direct LRT access area Nicolas Romero and Atizapán are low – medium income residential areas. Annual growth rates are between 0.50 and 2.80%. Employment 125,000 employments in direct LRT access area Tlalnepantla is one of the most industrial areas in MCMA M A P K E Y Zones, Project Area Municipalities Project Area Metro Stations Main highways LRT Route Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 7 Population and Employment Density M A P K E Y Population/km2 0 to 2,500 2,501 to 5,000 5,001 to 10,000 10,001 to 15,000 15,001 to 20,000 20,001 to 30,000 30,001 to 60,000 No data inhabitants Population M A P K E Y Employments/km2 0 a a a a a 1,000 1,001 a 5,000 5,000 a 10,000 10,001 a 15,000 W/o data Inhabitants Employment Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 8. Corridor Traffic Characteristics Private Transportation Only one main road gives access to corridor Blvd. Lopez Mateos has 3 lanes each direction, while feeder roads are one lane each direction 30,000 vehicles use corridor daily 50% are transit vehicles Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 9 Corridor Transit Characteristics Transit Vehicles Peak periods are identified at 7-8 AM and 7-8 PM with (AM 1,385 transit vehicles; PM 1,260 vehicles) 39% of these are microbuses (24 seated, 16 standing capacity) 32% Buses (40 seating, 40 standing) 29% Combis/Vans (12 seated, no standing) Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 10 Corridor Transit Characteristics Transit Observed Demand Demand peak periods are identified between 7-9 AM and 7-8 PM 62% of these trips are HB work related, 27% are shopping or school related, and 11% are non-HB work related 58% of these passengers have a low income, 38% average and, 4% high Most of the day, demand is below capacity offered by transit operators Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 11 OD Trip Distribution Trip Patterns Most the trips in the morning exit the project area for jobs in Mexico City, PM passengers return home at night Major Generation Points Progreso San Pedro Atizapán Major Attraction Points Tlalnepantla Satelite Naucalpan Atizapán Trip Generation Trip Attraction Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 12 Stated Preference Survey Utility Function Parameters IVTT in minutes on board a bus, microbus or combi/van IVTT in minutes on board new LRT IVTT in minutes on board Metro (subway) system Fare in pesos from true OD Boardings number of boardings made from O-D Findings Passengers value more time on bus than in Metro LRT is seen as a better mode than bus and Metro All demand segments are very sensible to the number of boardings made during their trip These functions were used in a transit mode choice logit model U = A  (tbus) + B  (tLRT) + C  (tmetro) + D  (fare) + E  (boardings) Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 13 LRT ridership (Route Ixtacala) No Integration Scenario 12,660 pax/hour 161,000 pax/day US$0.50 fee Existing routes competing with new LRT Total Integration Scenario 26,580 pax/hour 356,200 pax/day US$0.50 fee No existing routes competing with new LRT Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 14 LRT ridership (Route Juarez) No Integration Scenario 13,960 pax/hour 178,000 pax/day US$0.50 fee Existing routes competing with new LRT Total Integration Scenario 30,417 pax/hour 392,800 pax/day US$0.50 fee No existing routes competing with new LRT 10% increase from other route Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 15 LRT boarding and alighting Findings Most of the LRT are part of longer trip. Initial boardings are made at Progreso and San Pedro, XX miles away from initial LRT Station. Alightings are made at Tlalnepantla, either for jobs there or for connections with other transit routes. Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 16 Sensitivity Analysis and Time Savings Sensitivity Analysis Fare of US$0.50 maximizes revenue for LRT operator. Price Elasticity of Demand is 0.85 at a fare of US$0.50. Time Savings Time savings for the no-integration scenario are 8,311 man-hours during the AM peak hour. These savings represent US$ 16.5 Million a year. For the total integration scenario, savings sum up to US$ 29.9 Million a year. Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 17 Demand Forecast Forecast 2 scenarios were developed, population growth rates and population growth rates plus increase in VOT. From 177,000 daily passengers estimated for 2002, in 2013 are expected 201,000 and in ,000. Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions

Atizapan – El Rosario Light Rail Transit Demand Study 18 Conclusions Existing Conditions Frequencies offered by transit operators exceed demand requirements, causing delays to other traffic that share corridor. Existing transit demand for the corridor equals 392,000 daily passengers. Lack of route structure and organization increases congestion and travel time unreliability. LRT Results Estimated ridership for new LRT is 177,000 daily passengers (45% of total potential demand). If transit route integration is achieved, demand would increase 353,000. Expected annual revenue for the no-integration is US$ 30 Million. Project Status Project is on funding stage Corridor Analysis Transit in Mexico City Introduction LRT Demand Conclusions