1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.

Slides:



Advertisements
Similar presentations
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Advertisements

Federal Energy and Environmental Regulation Agencies and Laws
March 31, 2009UTPB NRC Nuclear Programs1. Engineering and the HT 3 R (High-Temperature Teaching & Test Reactor) Mechanical Engineering: Nuclear & Classica.
Nuclear Energy Institute Overview Susan Perkins-Grew Director, Emergency Preparedness March 30, 2010.
Licensing of Nuclear Power Plants in Pakistan
Brief History of Nuclear Regulation 1946 Atomic Energy Commission (AEC) by Congress. Strict control of nuclear materials used or produced in a reactor.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Federal Energy and Environmental Regulation Agencies and Laws
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
Nuclear Energy in 2013: Status and Outlook Briefing for Czech Technical University Scott Peterson, Senior Vice President Nuclear Energy Institute March.
1 October 26, 2010 Presentation before the California Senate Committee on Energy, Utilities, and Communications, Hearing on “Nuclear Power and California’s.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
NRC Follow-up to Gamma Irradiator Service/Foss Event Dan Collins (Deputy Director, Division of Nuclear Materials Safety, Region 1)
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 A CASE STUDY: Organization and Workforce for Operations at Maryland State Highway Administration Glenn McLaughlin, Deputy Director Office of CHART and.
NE 127 – Codes, Standards, and Regulations Power Industry Regulations INSTRUCTOR: Chattanooga State CC.
Imagine if You Received this Call! Michael Weber Deputy Executive Director for Operations August 24, 2011.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
NRC/Exelon Licensing Counterparts Meeting October 4, 2012.
Sustained Reliability U.S. Nuclear Plant Average Capacity Factor 91.1% in % in % in % in % in % in %
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
1 RIC 2009 Construction Inspection Program Loren R. Plisco Region II March 11, 2009.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
Plant Parameter Envelope for Early Site Permits
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
New Reactor Construction Inspection
North American Young Generation in Nuclear (NAYGN)
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
Licensing of a Potential Geologic Repository at Yucca Mountain Lawrence Kokajko, Director Division of High-Level Waste Repository Safety U.S. Nuclear Regulatory.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
1 Transportation Workforce Institute Leticia Barajas Vice President, Academic Affairs and Workforce Development Jess Guerra Director, Transportation Workforce.
1 RIC 2009 NUCLEAR SECURITY Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident.
1. 2 Director General Department of Management Department of Nuclear Safety and Security Department of Technical Cooperation Department of Nuclear Science.
Improving Chemical Facility Safety & Security RRT Quarterly Meeting July 16, 2015.
Organization of the Public Prosecution Office of the Prosecutor General (Chief Military Prosecution Office) Appellate Military Prosecution Office Local.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
Federal Energy and Environmental Regulation Agencies and Laws
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Management of RS/DSRS in Brazil Ademar José Potiens Júnior
Vermont Yankee Decommissioning Update
Entergy’s Nuclear Operations
Nuclear Chemistry Unit 14.
Regulatory Control Training Workshop
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
NE 127 – Codes, Standards, and Regulations Power Industry Regulations
NRC Perspective of Radiological Byproducts for Oil and Gas Operations
Thomas Koshy, On Behalf of Brian Thomas, Director
Armenian Nuclear Regulatory Authority
Anna Bradford, Deputy Director Division of New Reactor Licensing
RESOLUTION OF GENERIC SAFETY ISSUE 191
Japanese Nuclear Accident And U.S. Response
NUCLEAR ENERGY What is it?
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
Presentation transcript:

1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009

2 Objectives Provide an update on NRC New Reactor Inspection Program and industry activities to prepare for construction activities Highlight current initiatives Obtain stakeholder insights and information

3 Today’s Panel Loren Plisco, Panel Co-chair and Deputy Regional Administrator for Construction, Region II Hal Thornberry, Vice President, Nuclear Construction, The Shaw Group Greg Gibson, Vice President, Regulatory Affairs, UniStar Nuclear Energy Naoki Miyakoshi, General Manager, Nuclear Energy Systems Quality and Safety Management Department, Mitsubishi Heavy Industries, Ltd. Russ Bell, Director of New Plant Licensing, NEI