26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool.

Slides:



Advertisements
Similar presentations
Paul Soler, 23June 2000 RAL and Univ. of Glasgow MONITORING, ALIGNMENT AND CONTROL OF THE RICH DETECTORS.
Advertisements

Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
VELO T. Bowcock1 Si Status T.Bowcock for S. Biagi, G.Casse, P. Cooke, M. McCubbin, A. Muir, J. Palacios, C. Parkes, U. Parzefal, G. Patel, J. Phillips.
Micron detector testing in Liverpool G. Casse – O. Lodge Laboratory, University of Liverpool.
T. Bowcock1 Can CP save life? LHCb and its applications…
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
VELO Status at Liverpool T. Bowcock. Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning.
VELO Module Mid-Term Review T. Bowcock 11 October, 2006.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Solid State Detectors- 3 T. Bowcock 2 Schedule 1Position Sensors 2Principles of Operation of Solid State Detectors 3Techniques for High Performance Operation.
Actividades de I+D en IGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
Software and hardware complex of experimental plant for pulp and paper production Master student of MMA department : Anton Kaverin Perm National Research.
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
Quark Net 2010 Wayne State University Physics Department.
Device Fabrication Facilities NFFJeol JBX6300FS Direct write on wafers, high throughput, mask writing, for nanoelectronics –25, 50, 100 kV accelerating.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Bias routing of short strip on large area detectors G. Casse, University of Liverpool.
Ultra-Fast Silicon Detector 1 This report is a summary of what was shown at IEEE. Nicolo Cartiglia, INFN, Torino - UFSD - Timing Workshop CERN 2014 Nicolo.
Abraham Gallas (USC-IGFAE) Strips and Pixels for the VELO upgrade.
Goal Have a patterned material that blocks infrared light.
Abstract We constructed and tested seven scintillation counters using photomultiplier tubes, in order to create a fast electronic coincidence “trigger”
LCWS2002G/H Joint Session Fabrication of a Silicon Pixel/Pad for dE/dx Measurement H. Park (Kyungpook National U.) I.H. Park (Ewha Womans U.)
IFIC projects for the ILC IFIC – Valencia J. Fuster, C. Lacasta, P. Modesto, M. Vos, C. Alabau, A. Faus- Golfe, J. Resta, I. Carbonell IFIC - INSTITUTO.
RICH detectors for LHCb Tito Bellunato INFN Milano-Bicocca On behalf of the LHCb RICH collaboration 10th International Conference on Instrumentation for.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Testbeam Studies of the LHCb Vertex Locator Modules Lisa Dwyer.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
GSI-Cryoexpertmeeting; 19. & Cryoplant for series test facility Standard plants have a capacity up to A capacity of about 1,5kW is.
Haga clic para modificar el estilo de texto del patrón Infrared transparent detectors Manuel Lozano G. Pellegrini, E. Cabruja, D. Bassignana, CNM (CSIC)
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Detector Development Overview Group Meeting – October 2014 Euan N. Cowie 22 October Detector Development Overview - ENC.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
VELO Decisions Thomas Ruf LHCb week February 2001 Interference with LHC machine   LEMIC, January 2001: Presentation of the VELO Vacuum Chamber design.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International.
Run II preparations Test beam plans Moving from 156 to 169 DT-LHCb coordination meeting June 2, 2015.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
12 th LECC, Valencia Sep 2006Aldo F. Saavedra 1 The Vertex Detector of LHCb - VeLo Aldo F. Saavedra Glasgow University On behalf of the VeLo group.
Santiago in DEPFET for SUPERBELLE
T. Bowcock University of Liverpool
Atlas: Upgrade Phase I Massimo Della Pietra.
IFR Status Summary W. Baldini on behalf of the IFR Group
Simulated vertex precision
ITK Strip Module Meeting; 12st October 2015
ALiBaVa A brief overlook of Liverpool software changes, common issues and questions. A. Affolder, A. Greenall, I. Tsurin, G. Casse, V. Chmill, M. Wormald,
HR-HV CMOS activities and plans at Glasgow
EENP2 Silicon Detectors.
AIDA Alignment Package
T. Bowcock University of Liverpool For the LHCb Collaboration
500 nm WRITE VOLTAGE 0 V.
Conlusions of the Cracow Meeting
Peter Kodyš, Zdeněk Doležal, Jan Brož,
LHCb Alignment Strategy
Perugia SuperB Workshop June 16-19, 2009
Status of Hamamatsu Silicon Sensors
Presentation transcript:

26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool

26 June 2001VELO-Overview Post-TDR Hardware Software Critical Issues Summary

26 June 2001VELO-Overview Hardware Sensors Hybrids Thermo-Mechanical Module Testbeam Production Facilities

26 June 2001VELO-Overview Hardware: Sensors (1) Two types of sensors produced –Hamamatsu (n+n) –Micron (p+n)2000 In fabrication (mask design at Lpool) –Micron (n+n)2001

26 June 2001VELO-Overview Hardware: Sensors (2) Laboratory –High precision tests with 1060nm lasers for both sets of detectors (LHCb note) Testbeam at CERN –Under preparation for 2001

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview Hardware: Sensors (3) Additional test equipment –Cosmic ray facility – now commissioned Shorter wavelength laser (900nm) –Ordered Automated Scanning x-y stage

26 June 2001VELO-Overview Hardware: Sensors (4) Simulation complete –First principle analysis of leakage currents and charge collection as a function voltage Agreement with data –Note low voltage phenomena <20V Q/I amplifiers.

26 June 2001VELO-Overview Hardware: Sensors (5) Identify manufactures for Production –Hamamatsu (withdrawn n+n option) –Micron (n+n, p+n) –CSEM, Eurysis, SEIKO, SINTEF, ST Technical discussions Price Enquiry

26 June 2001VELO-Overview Hardware: Hybrids(1) Hybrid Design&Production to IDE –Delivered –Bonded and mounted with chips –Fan-ins produced –Under test 4 chips r/o (26/6)

26 June 2001VELO-Overview Hardware: Hybrids(2) Kapton version to be ordered early 7/01 SCT-VELO design (Liverpool) –improved cable connections –Viable pre-production prototype Beetle design

26 June 2001VELO-Overview Hardware: Module(1) Thermal models for TDR Cooling system –Safety issues addressed

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview Power Delta(T) (from nominal) Calibration Model

26 June 2001VELO-Overview Chip glue kapton sensor ceramic TPG Chip glue kapton sensor TPG CF weave CF(UD)

26 June 2001VELO-Overview

26 June 2001VELO-Overview Hardware: Module (2) Prototype and testing of adjustment Re-engineering –Carbon fibre base –O CTE materials including adjustment screws

26 June 2001VELO-Overview Electronics Cooling Bracket & Fixings Carbon Fiber Paddle Micrometer Adjusters Paddle Base Flat Spring Location Base Substrates Silicon Detectors x y y z z x (pitch) (roll) (slew)

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview Hardware: Module (3) Curvature of the sensors measured We may need to survey (cold?) the modules

26 June 2001VELO-Overview Hardware: Module (4) Measurement points

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview Hardware: Testbeam Module for October 2001 –See also software

26 June 2001VELO-Overview Hardware: Production Facilities Clean rooms Bonding equipment Jigs and Assembly –Vacuum compatible glue dispensing

26 June 2001VELO-Overview Production Facilities LHCb R&D

26 June 2001VELO-Overview

26 June 2001VELO-Overview Software TDR analysis and optimisation Monte Carlo simulations of VELO VELO core software (meeting 5/6 July) Alignment Testbeam

26 June 2001VELO-Overview Software: Optimisation We generated and analysed over 10m bb events generated and analysed for different configurations: Physics Section Optimisation paper (for TDR) huge effort impossible without substantial effort

26 June 2001VELO-Overview Software: Silicon Other (non GEANT software) for optimisation of operating conditions

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview

26 June 2001VELO-Overview Software: Alignment(1) Alignment: Underway –From HERA code used by H1 –Fast determination of global parameters –Reduced to linear problem

26 June 2001VELO-Overview Software: Alignment(2) Curvature of detectors

26 June 2001VELO-Overview Residuals

26 June 2001VELO-Overview Software: Other LHCb production LHCb Grid –Testbeam as testbed

26 June 2001VELO-Overview Critical Issues Electronics Manufacturers for Silicon Grid

26 June 2001VELO-Overview Summary Sensors Hybrid Module Software