LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1 MICE Target Status Chris Booth 3 rd March 2004.
Fill in missing numbers or operations
Control Framework Breakfast Group agenda 9:00Arrival, Breakfast & networking 9:20 Welcome & Phase I Update 9:30Direct reporting project update – Sharmi.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
ICAO Safety Management Systems (SMS) Course
0 - 0.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Quality Assuring the Scottish Baccalaureate Inter-disciplinary Project Session
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Production Summary Tony Smith (Production Coordinator)
LHCb Velo Electronics PRR
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
VELO T. Bowcock1 Si Status T.Bowcock for S. Biagi, G.Casse, P. Cooke, M. McCubbin, A. Muir, J. Palacios, C. Parkes, U. Parzefal, G. Patel, J. Phillips.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
LHCb Velo Construction Authorisation steps Tony Smith.
VELO Module Mid-Term Review T. Bowcock 11 October, 2006.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
1 Liverpool Production Status Week of 9 February 2007.
YEAR 1 WEEK 15 CAREER DEVELOPMENT WORKSHOP DAY 1 delivered by Careers Service/JFR 10:00welcome and introduction 10:30considering the options - roles, careers,
Richmond House, Liverpool (1) 26 th January 2004.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
1 00 Month 0000 Are we ready for small screen surfing? Marek Sláčík Chief Marketing Officer Telenor Serbia.
1 Price Risk Management and the Futures Market Hedging.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
1 Recognize Any Hazard(s)?. 2 Yes No employer shall permit a worker to work in such proximity to any part of an electric power circuit that the worker.
6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting.
Applied Technology CIS-400 Central State University Prof. Hicks.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
1 Queen Elizabeth High School HOME of the KNIGHTS.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Lecture 8: Testing, Verification and Validation
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
Number bonds to 10,
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
20/01/09 OPERA general meeting Nagoya CNGS report.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
Hybrid Integrated Circuit
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
DT-LHCb coordination meeting 18 April 2016
T. Bowcock University of Liverpool
Ladder Assembly All tools and jigs produced Glue dispensing works
Simulated vertex precision
Presentation transcript:

LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule

Production Phase Staff

Status EDR in April 05 Target Production Readiness Dec 05 –Green light for the release of physics grade components by the collaboration Delivery of 42 modules (84 sensors) –20 for system test April 05 –42 by June 05 (or earlier) –Rates of delivery to be discussed later

Status Preparing for production of (PRR) –3 mechanicals (fully functional barring sensors) –3 electrical (fully functional but with poorest sensors)

Major issues at EDR Pitch adaptors Twisted hybrids at pre-production phase –These two problems alone have cost ~ 6 months Jigs and tooling –Majority complete/modified Vacuum Performance of Sensors –OK

Major post EDR issues High current mode of sensor during testing Reliability of K&S 8090 –Front end bonding machine –New contract gives us confidence Pitch Adaptors Hybrid circuit testing –Commericial and in house Stress relief of cables –Clamp production proving difficult Cable quality not good enough for production –Tied to one company at the moment

In preparation for PRR Assembly robot deployment Paddle-hybrid gluing jig completion Programming of glue robot

PRR will require Non-artisinale production of modules Adherance to tight mechanical tolerances Electrical integrity Proof that yield is adequate

Visit Schedule 9 th November 9:30 -11:00 Tour of assembly area –Parts and metrology: Phil Turner –Gluing and bonding: Mark Whitley –Assembly and testing: John Carroll 11:00-11:30 Tea (3 rd floor) 11:30-12:30 Tour of workshop –Carbon Fibre and Mechanics: Peter Cooke 12:30-13:30 Lunch (3 rd floor) all invited 13:30-14:00 QA and software (VC rm) 14:00-15:00 Project Review 15:00-15:30 Resource Meeting 15:30-16:00 Tea/Coffee 16:00-16:15 Feedback (rm 337)

Project Review 9 November

Project Review

Project Plan PRR plan

Logistics Components –Feet –Bases –Paddles –TPG(100%) –CF(100% Substrates –75% yield Hybrids –Yield unknown –Should have physics grade Sensors –95% yield -> replacement Pitch Adaptors –60% received –80% yeild Handling Frames –20 off –6 available Cables –Major problem Clamps –Manufacturing problem Transport boxes –Syracuse

Sensor Status Received 42/142 ~ 30% –Contracted delivery at 15/month= 7 months to completion (June 06) –Sufficient for VELO completion in 4 months (March 06) –Laser cutting will now be the bottleneck Have 18 sensors for physics –4 under test –6 high current behaviour but possibly usable –14 used/irradiated/rejected/damaged/(mia) Our QA deselects ~5% of delivery. These are replaced.

Sensor Production

Risks Sensor manufacturer deliver Cables Clamps Hybrids Assembly/twist methodology failure

Realism Do we think the plan is realistic Yes –Depends on delivery not slipping and no unforeseen disasters

Summary All components and methodologies have been designed Delivery of sensors still of concern