SC13 API SC13 Drilling Completion and Fracturing Fluids Jan 26, 2011 Fort Worth, TX Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Doc.: IEEE /101 Submission January 2001 David BagbySlide F Meeting Report Jan 2001.
ASTM OFFICERS CONFERENCE SUBCOMMITTEE CHAIRMENS DUTIES AND RESPONSIBILITIES.
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Doc.: IEEE /0075r1 Submission January 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:
Sub-Committee 13 API SC13 Drilling Completion and Fracturing Fluids June 13, 2012 Westminster, Colorado Paul Scott, Chair Johnna Smith, Secretary David.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
SPEC 13A Sec. 16 Drilling-grade Starch
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
TG2: Publications SC13 – Report on Work Groups and Publications Sheraton Chicago Hotel & Towers Chicago, Illinois June 19, 2014.
© 2011 wheresjenny.com Minutes of meeting. © 2011 wheresjenny.com Meeting minutes are the written or recorded documentation that is used to inform attendees.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
TG # 6 API SC13 Meeting Winter Standards Meeting January 24 – 28, 2011 Fort Worth, Texas.
SC13 Summer 2011 API SC13 Drilling Completion and Fracturing Fluids June 29, 2011 San Francisco, CA Paul Scott, Chair Johnna Smith, Secretary David Ekas.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
1220 L Street, NW Washington, DC Executive Committee on Standardization of Oilfield Equipment & Materials (ECS) New Member Orientation.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
API SC13 TG08 WG05 SPEC 13A Sec. 16 Drilling-grade Starch SC13 – Drilling Completion and Fracturing Fluids June 17, 2014.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
San Francisco, CA. SC8 Liaison Report
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Doc.: IEEE /0034r0 Submission January 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /176r1 Submission March 2000 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
1 Summary of TAC Procedures May 5, Revision of TAC Procedures Project began in October 2004 to incorporate the Commercial Operations Subcommittee.
September 2002 Brian Mathews - AbsoluteValue Systems Slide 1 doc.: IEEE /554r0 Submission Publicity Committee /.15 Brian Mathews, PC Chair.
WG or TG # API SC13TG 10 API 19C Meeting July 15, 2014 Rapid City, South Dakota.
Getting More Involved with NFRC
Minutes of meeting.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
Updates from SC18 Summer Meeting
Submission Title: [TG3 Closing Report 17May01]
Brent Estes, Chair Carl Stouffer, Secretary Saleh Al-Amari, Vice-Chair
2017 API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
2017 Exploration & Production Winter Standards Meeting
2016 Exploration & Production Standards Conference Subcommittee 10
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
SC13TG08 Drilling Fluid Materials
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
<month year> doc.: IEEE < e> <July 2018>
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
<month year> doc.: IEEE < e> <September 2018>
Saleh Al-Ammari SC13 Chair
Saleh Al-Ammari SC13 Chair
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
API 10 F.
API SC 10 WG15 Stage Cementing Collars
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Roger Marks (Huawei) capable 16 September 2019
Presentation transcript:

SC13 API SC13 Drilling Completion and Fracturing Fluids Jan 26, 2011 Fort Worth, TX Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair

SC13 Agenda Housekeeping (SC Charge, Roll Call, etc) Previous Meeting Minutes – Approval Upcoming Meetings SC13 API Reporting and Support New Work Items Task Group Updates Old Business New Business Adjourn

SC13 SC13 Charge & Intro Develop and Maintain Specifications and Recommended Practices for Drilling, Completion, Fracturing Fluids, Fluids Processing Equipment and related subjects Incoming Secretary Johnna Smith Del Son

SC13 API Lists & Roll Call Comment on API List Circulate SC13 Roster for Updates Sign-in sheet Roll Call

SC13 API Resolution of Appreciation Dr Judy Guy-Caffey Presented by David Miller API Many thanks!

SC13 Welcome new members Andrez Diaz, BP GOM Matthew Malwitz, Grinding & Sizing Leon Martinez, Global Wire Cloth Toby McClain, Fann Instruments Hugo Osorio, Equion - Energy (ex-BP Colombia Company) Victoria Xiaoping Qiu, Shell International Exploration and Production Tom Remy, Global Wire Cloth Phil Schwarz, OFI Testing Equipment Jennifer Shafer, TETRA Technologies Neil Trotter Others? Thanks to everyone for attending and participating

SC13 SC13 Meeting Minutes Review & Approve Previous 2 Meeting Minutes – ed recently Posted on API website with all TG WG presentations & documents Review Previous Meeting Action Items: All significant items accomplished continued or unresolved items will be carried forward

SC13 Next API SC13 Meetings 2011 Summer – June 27- July 1, San Francisco, CA 2012 Winter – January 23-27, Fort Worth, TX 2012 Summer – June 11-15, Westminster, CO

SC13

SC13 Home Page API Website: Standards – Committee Info - CSOEM – SC13 Sign-in: address & 1 st time Username: FirstnameLastname or “Forgot Password”

SC13 Committee Documents Common Documents Each TG has a page where they can store and share information

SC13 SC13 Meeting Minutes

SC13 SC13 Rosters and Mailing Lists

SC13 API Support & Staff Need to use the API Website more!!!!! Shail Ghaey, Standards Associate Roland Goodman, Manager - Upstream Standards David Miller, Director - Standards

SC13 TG2 Publications: Stark Summary Report See TG reports for status of all SC13 documents RP13B-2 is close to go to ISO FDIS Feb 2011

SC13 WG1: Oil Mud Chemical Analysis Hibernation WG2: HPHT Direct Indicating Viscometers Sent back to WG to address TG comments WG3: Particle Size Distribution Testing of OBM / SBM Held one meeting and has developed a work plan for future action SR 3 : Measurement of NAF Internal Phase Activity Modifiers To be addressed by Paul Scott TG3 OBM Report To SC13: Pless

SC13 TG3 OBM Particle Plugging Test Revision for Inclusion in RP13B-2 Meeting with TG4/WG2, Ceramic PPT Procedure Re-Write New procedure will be applicable to RP13B-1, RP13B-2 and 13I WG2 to submit procedure to TG4 for approval Following approval of draft in TG4, draft procedure to be distributed to TG3 members for review / approval

SC13 Background: Increased emphasis on environmental aspects of drilling fluids is driving fluid companies toward non-chloride internal phase activity modifiers for non-aqueous fluids Introduced at the 2010 winter meetings SR 3 submitted by Brent Estes to the Task Group at the 2010 summer meetings Tabled by Task Group for further refinement TG3 OBM Measurement of NAF Internal Phase Activity Modifiers

SC13 Actions assigned for consideration prior to winter standardization conference: Limit scope of materials to be addressed Inclusion of methodology for solids calculations into SR 3 document / WG Charge TG3 OBM Measurement of NAF Internal Phase Activity Modifiers

SC13 Interested parties met on 12/7/2010 to draft a response to the Task Group: Activity modifiers to be considered Formates Nitrates Acetates Glycol / Glycerols Agreed to include methodology for utilizing activity measurements to calculate corrected solids. TG3 OBM Measurement of NAF Internal Phase Activity Modifiers

SC13 Proposed Work Group Charge: Develop procedure(s) for measurement of non- chloride activity modifiers in non-aqueous fluids and methodology to use those measurements in corrected solids calculations. TG3 OBM Measurement of NAF Internal Phase Activity Modifiers

SC13 New Work Items Motion and vote on TG3 OBM Measurement of NAF Internal Phase Activity Modifiers

SC13 TG4 WBM & Lab Testing: Breeden Summary Report WG1 Drill Solids Simulation continues, WG2 PPT procedure re-write near completion, Ad hoc Filter cake compressibility – potential university interest, Ad hoc PSD Laser diffraction continues as Ad hoc, Presentation David Derwin Superior Graphite on different in RP13I abrasion test procedure blades – no new WG. Will liaise with supplier Fann

SC13 TG5 Summary Report: Robinson WG1 SCE calculations has new chair Neil Trotter should now make progress looking for new technology, WG2, Stocks: Educational Marketing group nearing recommendation for screen designation monogram or certification program

SC13 TG6 Summary Report: Javora TG6: Testing Heavy Brines, Javora

SC13 SC13 TG-6 Testing of Heavy Brines Quorum was established June 2010 Meeting Minutes Approved Buffer, Corrosion, and Future Project Work Groups completed their tasks Return Permeability, Displacement, Hydrate, Scale and Emulsion Technology Work Groups conducting/initiating business API CRA Testing Program – Update given Total Comments - ISO revisions

SC13 TG7 Rheology & Hydraulics Summary Report TG in hibernation previous chair Bern retired RP13D has numerous errors: Zamora has submitted errors and technical issues Zamora wants to reactivate TG and minor revision of RP13D to include additional items like effect of rotation Will discuss with Zamora

SC13 TG-8, Drilling Fluid Materials Action Items 01/26/11 1)Review wording of Starch and Guar tests with TG08WG02, vote and forward to TG08 2)Re-run SEBC tests with new sample of Starch in round robin repeat 3)Recommend hibernation for TG08WG04 (API RP13K) after voting comments are resolved (Passed) 4)Contact Saleh Al-Ammari for clarification on data presented to SC13, determine status of proposed WG and solicit members as appropriate (Establish WG) SC13 – Drilling Completion and Fracturing Fluids

SC13 TG9 Frac Fluids: Mahmoud Asadi Active Documents ISO (API 13M-1) Procedure for measuring viscous properties of completion fluids 5-year revision is under review by ISO/API ISO (API 13M-6) Procedure for measuring leakoff of completion fluids under dynamic conditions Final comments from the reviewers are under review by the committee members

SC13 TG9 Frac Fluids: Mahmoud Asadi WGs & Documents  ISO X (API 13M-X) Formation damage (regain permeability) First draft will be submitted to ISO/API in Jan 2012  ISO XX (API 13M-XX) Emulsion Kick-off meeting was held in 2010  ISO XXX (API 13M-XXX) Friction First draft will be submitted in Jan 2012

SC13 WG on Business Practices, Polnaszek Summary Report Proposed new TG and equipment for long term storage of technical data – wait to develop SR3 and SC13 vote on new TG Other work on RP and flowchart will continue

SC13 Transfer of Proppant TG from SC19 to SC13  CSOEM will most likely transfer of TG on Proppants from SC19 to SC13, Glenn Penny Chair

SC13 Comments on this meeting Good attendance Simultaneous meetings did not work and will try not to do it again Having true work group meetings was good and will be continued First row TG/WG seating did not work Will stay with Tuesday Wednesday schedule

SC13 Closing Comments My agenda as Chair: 1.Do things faster with same quality of work 2.Less is more – publication bloat reduction 3.Change: a)Embrace modern work processes b)Accept new technologies: API website, eWorking c)Encourage new and younger member participation 4.Social – Contact Jarad Hammar Thanks for Volunteering! Feel free to contact me

SC13 Are we finished? OLD BUSINESS NEW BUSINESS ADJOURN