Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.

Slides:



Advertisements
Similar presentations
2011 Mid-Year Report ADC-60 Business Meeting. TRB Technical Activities Council 2011 Strategic Initiative: Research TAC and Committee on Research to give.
Advertisements

1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
AG.03: CIGRE SC A3 Green Book planning
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
Proposed RISC 2014 Deliverables, Activities, and Calendar For Discussion Andy Rodriquez, Director of RRAC January 14, 2014.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
1 Chapter Officer Roles & Responsibilities. 2 Chapter Officers/Leadership Team Serving on the Chapter Leadership Team is a privilege as well as a responsibility.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Sixth Annual Meeting of the WG: Governance issues Beth Rasch U.S.A.
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
9 Closing the Project Teaching Strategies
NATIONAL STATISTICAL COORDINATION BOARD 1 COMMENTS ON THE WASHINGTON GROUP GOVERNANCE PROPOSAL BY ROMULO A. VIROLA Secretary General National Statistical.
Change to Project Title
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
4th Meeting of the Washington Group on Disability Statistics WG Governance issues Beth Rasch, U.S.A.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Project Proposal: Survey and Assessment of Current Deployment of Applications for Surface Transportation Utilizing GNSS in the APEC Region Maureen Walker.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
CIGRE JWG / CIRED Power Quality Indices and Objectives Progress report on joint Cigré / Cired Germain Beaulieu, conv. February 2003.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
ASME C&S Training Module A3 MODULE A - ADMINISTRATIVE SUBMODULES A1. Tools and Resources A2. Codes and Standards Products A3. Membership Maintenance A4.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
How do you promote a product? Promoting product and services Boy … is this guy dumb.
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
19th January 2012 Don Wells (Hess)
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
CHIEF DEFENCE RESERVES Part-time soldiers making a difference for a better life for all PROGRESS REPORT ON PROJECT PHOENIX CORPORATE/POLICY ISSUES.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 1, 2014.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
Chapter 10 Understanding and Planning Reports and Proposals 10-1.
REPORT TO EWG MEMBER (CORRESPONDENCE) Plan of Actions for (May) (June) (July) (August) (September)
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
Update of the Scientific Secretariat
Draft Terms of Reference and Rules of Procedure
Support- IRDiRC Proposed Work Plan And Communication Strategy
WG Composition: WG Convener: W. A. Radasky
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
SEEA EEA Technical Recommendations
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
SMSA Policy and Planning Committee
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Draft Terms of Reference and Rules of Procedure
Roles & Responsibilities
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
IEEE 802 2nd Vice Chair last name at ieee dot org
IEEE 802 2nd Vice Chair last name at ieee dot org
Water Directors meeting Warsaw, 8-9 December 2011
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
Presentation transcript:

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods for Condition assessment of T&D switchgear Convener:Nenad Uzelac (USA) Secretary: Christian Heinrich (GE) Year of Kick-off: Dec 2013 Number of Members:27 Regular Members: 20 Corresponding Members:6 CIRED Members:1 Retiring Members: No retiring members New Members: All new members. See the list. A3-14(AG01)024-IWD

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 2 Meetings: First meeting in Berlin (December 2013) Second meeting scheduled in Chicago (April 2014) Third meeting scheduled in Paris (August 2014) Fourth meeting to be scheduled in Q4 in Europe

Study Committee A3 HIGH VOLTAGE EQUIPMENT Team: Good attendance at the first meeting – 16 members Expecting18 members for the 2nd meeting in Chicago. Expecting active participation from WG members. TEAM: Diversified team from CIGRE (equipment manufacturers, utilities, universities). Number of young members! –Looking for additional MV utility members from South America, Europe and Middle East Only one member from CIRED. No CIRED liaison has been nominated. Working Group Activity ReportWG A3.32 AR 2012Page No.: 3

Study Committee A3 HIGH VOLTAGE EQUIPMENT Phase 1: Team building and data gathering phase (2014) Collected and in process of reviewing 50+ white papers on Condition assessment. Collected individual contributions from the team. Creating database of existing diagnostic methods. To compile all methods Created definition and categories for Non-Intrusive Working Group Activity ReportWG A3.32 AR 2014Page No.: 4 Work progress :

Study Committee A3 HIGH VOLTAGE EQUIPMENT Created CIGRE WG website Created subfolders and tables for document control. Uploaded 50+ white papers and contributions Created bibliography and indexed all the documents. Working Group Activity ReportWG A3.32 AR 2012Page No.: 5 Work progress :

Study Committee A3 HIGH VOLTAGE EQUIPMENT Work progress : Created 5 page Utility survey (T&D Switchgear Condition Assessment survey). Objective is to collect data from utilities around the world to better understand current condition assessment practices and future trends for condition assessment in Power Industry. What would be the best way to conduct the survey? Working Group Activity ReportWG A3.32 AR 2014Page No.: 6

Study Committee A3 HIGH VOLTAGE EQUIPMENT 2014 –Contributions / research –Technical Brochure outline –Chapter leads 2015 –Continue contributions / testing / research –Rough draft of technical Brochure End of 2016 –Complete technical brochure, Electra Paper, Tutorial Working Group Activity ReportWG A3.32 AR 2014Page No.: 7 Schedule :

Study Committee A3 HIGH VOLTAGE EQUIPMENT Executive Summary Introduction Type of condition assessment methods for T&D switchgear Benefits of condition monitoring methods Applications Diagnostic / Design Switchgear –Reliability –Proposed methods Future Trends Conclusions / Recommendations Working Group Activity ReportWG A3.32 AR 2014Page No.: 8 Initial TB outline :

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 9 Discussion points: Best practice for conducting the utility survey Liaison with CIRED. Reporting to CIRED. Recruiting MV utility members (through CIRED?) Reaching out to CIGRE B Technical Committee WG Posters in Paris?

Study Committee A3 HIGH VOLTAGE EQUIPMENT Membership with approval of the last SC meeting Working Group Activity ReportWG A3.32 AR 2014Page No.: 10