Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, 19-20 May 2009 Page 1/7 Superconducting.

Slides:



Advertisements
Similar presentations
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
Advertisements

A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Development of a Curved Fast Ramped Dipole for FAIR SIS300 P.Fabbricatore INFN-Genova Development of a Curved Fast Ramped Dipole for FAIR SIS300 P.Fabbricatore.
“Magnetic measurement systems for future high performance magnets” WAMSDO - Workshop on Accelerator Magnet, Superconductor,
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
Superconducting Large Bore Sextupole for ILC
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Rotating Coils - Giordana Severino – Rotating Coils PACMAN meeting Printed Circuit Coils – Future developments.
S. Russenschuck, CLIC-Workshop, WP2-Pacman, R&D projects on rotating coil probe and stretched wire techniques for CLIC / PACMAN Stephan Russenschuck.
Solenoid-Based Focusing Lens for a Superconducting RF Proton Linac Presentation prepared for AEM 11/08/20101I. Terechkine.
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Magnet Spacers Design Automation Roxie2Catia Catia Forum – Sept. 29th 1.
SIS 100 main magnets G. Moritz, GSI Darmstadt (for E. Fischer, MT-20 4V07)) Cryogenic Expert Meeting, GSI, September 19/
Geneva, 12/06/ Results of Magnetic Measurements on MQXC 02 L. Fiscarelli on behalf of TE/MSC/MM section
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
AT Measurement Systems
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
1 / 29 Laurent Deniau CERN – AT – MTM 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
on behalf of the CLIC active pre-alignment team
Summary of Session: Magnets and undulators for light sources 2
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Status of the CLIC DR wiggler design and production at BINP
Geometric and Magnetic Measurements
Validated magnetic data at cold
Contents Future requirements for magnetic measurements
EN-ICE Technical Committee SM18 activities & projects
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
A Cold SCU Phase-Shifter
LHC OPERATION AND SUPPORT
FNAL Superconducting Quadrupole Test
LIU BWS Firmware status
News from the FNAL test facility
Optical fiber based sensors for low temperature and superconductors
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting Magnets and Laboratories: Instrumentation for Magnetic Measurements M Buzio, L Walckiers on behalf of TE/MSC/MM staff Superconducting Magnets and Laboratories: Instrumentation for Magnetic Measurements M Buzio, L Walckiers on behalf of TE/MSC/MM staff Contents 1.LHC Spares 2.Support to LHC Operation 3.Support to LHC Operation 4.LHC upgrade Phase I 5.Magnet R&D – High Field Magnets 6.Magnet R&D – Fast-Cycled Magnets

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 2/7 Magnetic Instrumentation for LHC Spares Demands Capability to measure spares and repaired magnets to the same standard as the series Instrumentation -All necessary equipment in working order (exception: large aperture magnets) -Spares available: sufficient for long coil shafts and rotating units, integrators, moles, etc … Long-term issues: hardware -Maintenance and calibration: key staff retired (or retiring soon), transmission of know-how to be ensured -Coil manufacturing workshop: winding machines to be repaired, specialized component suppliers (glue, wires …) to be renewed -Single Stretched Wire (calibration reference): three units in operation, but hardware starts to fail and some direct replacements out of stock (also, excellent support from Fermilab is nowadays much reduced)  Need to re-develop internally for the long term Long-term issues: software -Legacy platform = VME + LabView MMP on Sun workstations: stable system, support calls answered efficiently by EN/ICE, but platform being phased out -SMA database for coil calibration factors + raw/treated cold harmonic data discontinued  all processing/file transfer dome manually (not a problem for infrequent measurements) Support needed -EN/ICE/MTA: spare workstations/hard disks; MMP maintenance, backups, networking -BE/ABP/SU: laser tracker operation/maintenance; cooperation for geometry (magnetic axis) measurements -TE/MSC: coordination on relocation/operation of warm measurement systems (polarity checkers, DIMM/QIMM moles)

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 3/7 Magnetic Instrumentation in Support to LHC Operation Demands (see E. Todesco’s talk) -Fill in the magnetic model of LHC (FIDEL) -Validate the model on SM18 test benches (Tracking Tests) -Long term: update FIDEL in response to evolution of power cycles, operation modes etc … Instrumentation Standard instrument park + next-generation field acquisition platform (FAME – FAst Measurement Equipment) Designed to ensure: -long-term maintainability (PXI platform, modern electronic components) -enhanced performance (200×bandwidth, 100×S/N over VME integrators) -flexibility in a prototyping setting (C++ software running on Windows/Linux PC) Planned/under way developments -Fast Digital Integrators (FDI): firmware revision for more flexible use (internal trigger generation + interrupt handling) under way; finalization of hardware to achieve max. performance -FAME coil shafts: one full SSS system + one spare MB system; mechanism for longitudinal adaptation under study (essential for flexibility e.g. for correctors) -FFMM C++ framework: interfaces with HW/SW components (e.g. SM18 power supplies and LSA control system), fault detection, scripting, user interface Support needed -Integrators: partially supported by external collaboration with Università del Sannio (Italy) + Technology Transfer agreement with commercial partner (Metrolab, Geneva) -FFMM software: fully supported by Università del Sannio -Data storage: standard CERN Oracle support for storage of calibration data, raw and treated test results.  Detailed data formats and interfaces to be finalized in accord with all potential users.

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 4/7 FAME (FAst Measurement System) = Adapted long coil shaft + Mobile Rotating Unit + + PXI Fast Digital Integrators (~25 prototypes operational) FFMM C++ software (prototype version 3.0 deployed) Status: 1 full system for MB operational in SM18 (some tests pending). 8 Hz rotation speed demonstrated (much higher bandwidth possible with interpolation) Components can be reused and adapted for different non-SC projects: - Harmonic DC/fast-cycled measurements for Linac4 PMQs and EMQs - Upgrade of magnetic material testing equipment (permeameter) - SSW upgrade (long-term maintainability) - 3D Hall probe scanner.

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 5/7 Magnetic Instrumentation for LHC Upgrade Phase I Demands Warm/cold magnetic testing & quench detection of Ø120~180(?) mm NbTi magnets (1~2 short models + 23 correctors + 24 series cryomagnets) Instrumentation Single Stretched Wire: adequate for integral strength, magnetic axis and field direction. Existing rotating coil systems are not adequate for accurate harmonic measurements (ideally harmonic coil size  ⅔ aperture size) Planned R&D -Large-diameter quadrupole compensated coil arrays (long shafts and/or mole with optical tracking): mechanical stiffness and weight issues, calibration procedure (present reference magnet aperture too small) -Adaptation of mechanical and electronic components to harmonic coils system for large diameters, horizontal or vertical cryostats (short models) -Collaboration to development of suitable anticryostats -Fabrication of coils/shafts for modular quench antennas; improvement of the reliability of coils at cryogenic temperature (winding and curing procedure, quality of glue, dedicated thermal cycling testing) -Adaptation of acquisition system for fixed coil system (string test) Support needed -BE/ABP/SU: coordination on geometry tests + data analysis and storage. -All end users: coordination on design of quench antennas (size and sensitivity of coils, geometry, compensation) Overlap With Magnet R&D

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 6/7 Magnetic Instrumentation for Magnet R&D – High field magnets Demands Warm/cold magnetic testing & quench detection of dipole and quadrupole short models and prototypes Support to cable testing facility: search coils, electronics for data acquisition … (useful for any SC-related R&D) Instrumentation Existing instrumentation may or may not be adequate to the task (mainly depends on: magnet length, Ø aperture, accuracy needed). R&D issues -Anticryostats -Quench antennas -Adapted coil shafts/moles -Vertical cryostat systems Support needed -To be told in advance of geometrical/field constraints … (long lead times for high precision coil and shaft components) Overlap with R&D for Upgrade Phase I

Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 7/7 Magnetic Instrumentation for Magnet R&D – Fast-cycled magnets Demands -Warm/cold magnetic testing and quench detection of short models and prototypes (up to 2 T/s, 4 T) -Magnetic properties of iron yoke samples (magnetization curve + hysteresis and AC losses) Instrumentation Standard magnetic measurements based on fixed coils. Existing systems (routinely used on normal magnets) require wide apertures  likely to be inadequate. R&D issues -Suitably dimensioned coils and/or moles and/or double stretched wire systems Topics overlapping other SC/NC magnet programs: -Adapt acquisition to high-precision pulsed mode operation (   synergy with Linac 4) -High bandwidth measurements of eddy current effects (   synergy with Linac4, PS, CNAO) -Integral measurement in strongly curved magnets e.g. multiple-coil fluxmeter (  R&D done for CNAO) -Flexible control of standard split-coil permeameter with FDI/FFMM (   material properties routinely demanded by many clients e.g. NC magnets, PS B-train, LHC experiments, CLIC, CNAO, MedAustron, ITER …) Support needed -To be told in advance of geometrical/field boundary conditions …