Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28, 2011 1.

Slides:



Advertisements
Similar presentations
Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30,
Advertisements

UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Participation Requirements for a Patient Representative.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
RTF Small Saver Review Process Proposal July 17, 2012.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF SIS Subcommittee November 20, 2014.
RTF 2012 Workplan Statements of Work January,
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
GrocerSmart™ 4.0 RTF Subcommittee Approval of Adherence to Guidelines March 10, 2011.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum November 19, 2013.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Proposed 2015 RTF Work Plan September 16, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
SEEM Calibration for Manufactured Housing Regional Technical Forum December 13, 2011 Analysis Performed ByAdam Hadley Cursory Reviews ByTom Eckman, Ben.
Grocery Store Issues RTF April 10, Need Recommendations PECI: Energy Smart Grocer Program Savings method for interactive measures Savings method.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Display Case Motion Sensors Small Saver Measure Update July 16th, 2013.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
Commercial Clothes Washer UES Measure Update Regional Technical Forum April 16, 2013.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
Formation of a Market Analysis Subcommittee Charlie Grist and Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Guidelines for RTF Measure Costs and Benefits Guidelines (formerly Cost and Non-Energy Benefits Guidelines) Proposal of Guidelines to the Regional Technical.
Presentation transcript:

Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,

Measure Summary Savings estimation protocol for bundles of measures implemented in Grocery Stores Based on DOE2.2r simulations with method for specifying key simulation parameters Intend to request Provisional Status as Standard Protocol 2

Milestones 3 DateItemResult 2010PECI Development of GS 4.0 with guidance from subcommittee at 7 meetings Selection and sensitivity testing for key inputs Software QC approach reviewed Libraries & other data sources reviewed March 2011 Documentation methodology reviewed at subcommittee Format & content are going in the right direction April 2011 RTF meeting Review documentation. RTF tasks subcommittee to develop research plan to “calibrate” GS 4.0 with help of evaluators. May 2011 Two subcommittee meetings. Report to RTF at May 3 meeting. Develop approach to test GS4.0 against measured Test refrigeration load estimates baseline & post Both load and system measures need testing Sampling strategy June 2011 Two RTF staff meetings (Grist, Kendall, Baker, Baylon) with PECI. Plus two subcommittee meetings. Draft Protocol per Guidelines Draft Research Plan Written comments from 4 RTF Broad agreement on approach & method Review not completed in time for RTF meeting Many complex issues applying Guidelines

Subcommittee Summary Eight subcommittee meetings since March 2011 – Notes on subcommittee page – Plus Six RTF Staff & PECI meetings 4 Develop Approach to Test GS 4.0Draft Protocol & Research Plan

Standard Protocol Checklist 5 Link:..\Prov Protocol\Appendix A - Guidelines Checklist GS4.0 Draft 1).xlsx..\Prov Protocol\Appendix A - Guidelines Checklist GS4.0 Draft 1).xlsx

Status of Protocol & Research Plan Outline research plan by committee in May Initial drafts by PECI June 14, 2011 Written comments from: Mike Baker, Charlie Girst, Andie Baker, Ryan Fedie PECI revised based on written comments and June 23, 2011 subcommittee Link to current draft protocol Link to current draft research plan 6

Provisional Status Conditions from Operative Guidelines Programs which use provisional protocol agree to provide the data that are collected to the RTF so that they can be used to complete the development of the protocol Once a simplified method is proven reliable, the standard protocol documentation and associated calculator will be modified to be consistent with that method Sunset criteria must be assigned to provisional standard protocols 7

Major Elements Measure total short-term refrigeration energy use and key variables – Baseline & Post case Annualize short-term estimates of refrigeration energy using TMY data and other key variables Compare annualized estimates of measured refrigeration energy to GS 4.0 estimates of refrigeration energy both baseline and post Compare savings estimates for packages of measures installed – Use subtraction method, interrupted time series or change model – Savings = Refrigeration Energy Baseline minus Post With appropriate adjustments to normalize post-condition changes (such as refrigeration load) 8

Best-Practice Estimate Minimum 3 weeks baseline & post – Longer post for measures sensitive to ambient temperature (floating head pressure control) Develop regressions for daily or hourly refrigeration use correlated to ambient temperature & other independent variables Annualize using TMY data – Pre, Post and Savings (Pre minus Post) 9

Reason for 3-Week Measurement for Best Practice Method: Seasonally Consistent Refrigeration Energy Use 10

Testing the Candidate Protocol (GS 4.0) Perform GS 4.0 Audit to collect DOE2.2r inputs per data collection specifications Use inputs to run DOE2.2r for Baseline & Post estimates of total refrigeration energy Compare GS 4.0 estimates of Baseline, Post & Savings estimates of refrigeration energy to best- practice estimates Modify GS 4.0 and iterate tests until both baseline energy use, post energy use and energy savings at all sites are reasonable and there is no significant bias. 11

Issues Resolved in Subcommittee Measurements required for best-practice and candidate standard protocol Description & intended use of 14 measurement categories See Section 8 of draft protocol – Test bundle of measures, rather than individual measures Does the protocol produce reliable estimates of the savings from the all measures implemented at a site – Test both load reduction & system efficiency measures because of different physics & DOE2.2r methods – Sampling methodology & target 10 sites in each of 3 size tiers for n = 30 2 sites each tier with system measures – Calculator is DOE2.2r which is transparent & accessible 12

Remaining Items Level of detail to specify protocol inputs – Both site-specific & default inputs – Long list of required inputs with collection procedures, libraries or defaults for each Final write up of protocol, check list, documentation 13

Next Steps 14 DateItemIntent June 24, 2011 Circulate draft protocol and research plan for RTF comment Subcommittee and RTF review of draft protocol & research plan with intent to finalize for August decision by RTF. June 28, 2011 Update at full RTFBrief RTF on resolved & remaining issues. Prep for decision in August July 6, 2011 Close of written commentNeed time to digest comments and develop final July 2011 At least one more subcommittee To consider written comments and finalize proposed protocol and research plan August RTF Meeting Present to RTFProposed Protocol and Research Plan with subcommittee recommendations for provisional status