Start Presentation. A Boeing Company The role of Simulation in installation of Explosive Detection Systems Auckland June 03 Helping our customers increase.

Slides:



Advertisements
Similar presentations
Evolution of Parametric Analysis within Rolls-Royce Purchasing
Advertisements

1 Denver International Airport Ken Greene Deputy Manager of Aviation Airport Operations June 10, 2014.
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
IATA Cargo  International Air Transport Association 2010 Steve Smith Director Cargo Supply Chain Management Singapore June 2010.
Aviation Security, Technology and Collaboration The Security Network February 25, 2009 Janelle Miller Director Aviation Security Alaska Airlines / Horizon.
COBIT - II.
Chapter 2.
Sabre Airline Solutions
INDUSTRIAL & SYSTEMS ENGINEERING
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Travel Industry Collaboration SITAIATASABRE Technologies Enhancing Customer Value Tickets Check- In Security.
Industry Challenge 24 x 7 Visibility Of High Value Cargo.
Introduction to Systems Analysis and Design
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Regional Aviation Security Challenges & Opportunities.
2014 Workshop and Plenary Sandra Hoskins, I.S.P, ITCP, PMP, MBA CIPS – Canada’s IT Professional Organization IIBA – International Institute of Business.
Enterprise Architecture
CloseLaunchCommitCloseLaunchCommitInvestInvestLaunchBuildPlanExplore PRODUCT ENGINEERING – PLC INVEST DECISION.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Release & Deployment ITIL Version 3
1 Effectively Managing Global Engineering Licenses Kimberley A. Dillman IT Solution Architect – Engineering Delphi Corporation
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Internal Auditing and Outsourcing
Effective Methods for Software and Systems Integration
THNS 2010 Open supervision platforms for smart and sustainable cities, Yves PERREAL, Strategic studies Director, THALES.
EPM Live – Positioning for Enterprise Project Management Presented by: Sasha Lomas, PMP ASL InfoTech inc. March 3, 2010.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Deloitte Consulting SCOOPS Session September 2003.
9 Closing the Project Teaching Strategies
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
WORLD ALLIANCE GSA GROUP Presentation. World Alliance GSA was incorporated in 2013 with Singapore as its headquarters overseeing its Asia Pacific operations.
Case Study : Morcom Trading – P BSC 21
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
WORLD ALLIANCE GSA GROUP Presentation. World Alliance GSA was incorporated in 2013 with Singapore as its headquarters overseeing its Asia Pacific operations.
The Health Roundtable Self Check-in & Electronic Calling System Presenter: Anna Vandenberg Austin Innovation Poster Session HRT1215 – Innovation Awards.
Ranga Rodrigo. The purpose of software engineering is to find ways of building quality software.
@d_sight/DSight /company/d-sight Complex Decision-Making Made Easy.
Copyright ©2009, Oracle and/or its Affiliates. All rights reserved. 1 Enterprise Project Portfolio Management Value, Visibility, Agility and Accountability.
Chapter 13 Architectural Design
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
Air Cargo Security September /TPT-WG-28/AEG-SEC/ th Transportation Working Group Meeting Vancouver, British Columbia, Canada September 5.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Copyright © 2012 Boeing. All rights reserved. Effective Verification and Validation Testing Steve Holt Boeing Commercial Airplanes August 2013.
© 2015 The MITRE Corporation. All rights reserved. Dr. Christine Taylor Principal Simulation and Modeling Engineer 25 August 2015 Automation to Support.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
PRJ566 Project Planning & Management Software Architecture.
AGIFORS -- Airlines Operations, June Auckland, NZKeeping The World On Schedule1 AGIFORS Airline Operations 2003 Auckland, NZ, June
Airlines and Aircraft Airline Services Airline Evaluation Airline Contracts.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
Design Aducation Forum for Africa Conference, Pretoria, June 2004 How design links with NEPAD strategies and requirements The air transport infrastructure.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
VISION & CHANDLER MIGRATION 10/03/2013. Executive Summary Last year we requested several critical Vision enhancements immediately post go-live.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
DIA: Emotional Baggage by Matt Reynolds. Introduction In 1992, Denver sought to build a world-class connector airport. Doing this required bags to move.
Rochester International Airport 2016 Bonding Request.
Magic Valley Regional Airport Terminal Expansion and Remodel Magic Valley Regional Airport Terminal Modification Feasibility Study.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
Systems Analysis & Design 7 th Edition Chapter 2.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
TSA PROGRESS AT LAX 9.8% increase in passenger volume – % of passengers waited less than 19 min % of TSA PreCheck® waited less than.
CIM Modeling for E&U - (Short Version)
CRANE RELIABILITY STUDY
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Collaborative Decision Making “Developing A Collaborative Framework”
IBM Software An international airport Establishing near-seamless integration between heterogeneous systems The need: This airport needed a flexible, integrated.
Presentation transcript:

Start Presentation

A Boeing Company The role of Simulation in installation of Explosive Detection Systems Auckland June 03 Helping our customers increase the efficiency,capacity and safety of the global aviation industry through the provision of integrated simulation, decision support and scheduling solutions

A subsidiary of The Boeing Company The Task A Boeing Company Auckland June 03 3 Following 11 th September 2001 reaction by US government – introduce 100% screening across the country Requirement - install combination of EDS and ETD stations at 438 US airports Boeing awarded contract to oversee the effective installation of machines into airports Engineering, architectural, airport consultants and construction firms required for the exercise Tender developed and released for bid early 2002

A Boeing Company Issues to be Addressed Auckland June 03 4 Model airport using data from architects & planners  What number, location, and combination of machines?  What protocol to best process people and bags?  What space is required for machines and people?  Identify modelling resources and conduct training  What queue and procedure setup for maximum efficiency?  Passenger flow pattern optimization  Baggage room processing procedures  Passenger and baggage matching  Passenger and baggage tracking from check-in to loading

Beginning TSA project A Boeing Company Auckland June 03 5 Create template models for various security protocols to determine most workable combinations  100% ETD post ticketing, Solution 1  Simultaneous ETD check-in (Southwest Airlines)  100% ETD post ticketing, Solution 2  100% ETD pre-ticketing  EDS/ETD hybrid post-ticketing  100% EDS post ticketing

Simulation was used to… A Boeing Company Model an entire airport terminal environment or just discrete areas Associate every passenger and every bag with a specific flight, provide a description and security processing record Reduce risk and offer cost avoidance opportunities by analyzing proposed changes and what-if scenarios Determine processing system’s capacity limits, hardware and staffing requirements, over any time period of interest Assist managers and designers by predicting delays or problems for nearly any aspect of passenger and baggage processing Auckland June 03 6

Lessons Learnt A Boeing Company Auckland June 03 7 Early planning – avoid undue inconvenience Recognised PaxSim’s comprehensive planning capability and visualisation features very valuable for decision-making Critical - Communication from outset with stakeholders Modelling and simulation is key

Creating a cycle of increased safety, efficiency and capacity growth Preston Aviation Solutions A Boeing Company Preston Simulation and Scheduling Products Auckland June 03 8

9 A Boeing Company Optimize Implement “what if” Simulate Optimized resource allocation based on to strategic planning data Simulate based on resource allocation and planned schedule Analyse using further “what if’s” to overcome operational constraints Implement operational plan with greater confidence Auckland June 03 Summary

Helping our customers increase the efficiency, capacity and safety of the global aviation industry through the provision of integrated simulation, decision support and scheduling solutions Managing Tomorrow Today