IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.

Slides:



Advertisements
Similar presentations
1 San Joaquin River Exchange Contractors Water Authority WEF- Central Valley Tour April 23, 2014 Mission Statement : To effectively protect the Exchange.
Advertisements

Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
Skill Analysis for Runoff Forecasts on the Western Slope of the Sierra Nevada B. D. Harrison; R. C. Bales Sierra Nevada Research Institute University of.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Kansas Westward Water Transportation: Setting the Stage Presented by: Mark Rude August 1, 2014 Kansas Water Congress.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Brian McInerney Hydrologist National Weather Service Hydrologic Outlook April 2006.
Percolation Precipitation Abstract 70% of the population in Oregon lives above the seven major aquifer systems in the Willamette Valley. The seven primary.
Preparing for the Rainy Season SFWMD Operations & Actions.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
Water Management Section, Sacramento District, US Army Corps of Engineers Climate Impacts on Reservoir Rule Curves Stu Townsley Chief, Water Management.
Washington County & the Tualatin River: Geography & Climate Geography The Tualatin River Watershed is a low elevation, low gradient drainage area that.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
The Impacts of Climate Change on Portland’s Water Supply Richard Palmer and Margaret Hahn University of Washington Department of Civil and Environmental.
Watershed and River Management Program (WaRSMP) Description of Yakima River Basin and Yakima Storage Project MMS and Yakima River Basin models Global Climate-Change.
Optimized Flood Control in the Columbia River Basin for a Global Warming Scenario 1Dept. of Civil and Env. Engineering, UW 2CSES Climate Impacts Group,
Problem Description: Developing strategies for watershed management Problem Description: Developing strategies for watershed management Proposed Solution:
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
June 23, 2011 Kevin Werner NWS Colorado Basin River Forecast Center 1 NOAA / CBRFC Water forecasts and data in support of western water management.
Water in California: Self-induced Scarcity Waterscape International Group.
2011 Peak Flows and Daily Forecasts CBRFC 2011 Stakeholder Forum November 3, 2011.
Drought and the Central Valley Project August 2014.
How Much Do We Have Left? Coming to Terms With the Colorado River Water Availability Study Annual Colorado Water Workshop July 21, 2010 Ben Harding – AMEC.
The Colorado River: Operation, Current and Projected Future Conditions Southern California Water Dialogue Los Angeles, CA April 27, 2011.
CRFS Technical Committee Spring Meeting LC Operations Update March 26, 2015.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
NWS Headquarters August 10, 2011 Kevin Werner NWS Colorado Basin River Forecast Center 1 CBRFC Decision Support for Colorado River Water Management.
Background What is an atmospheric river? Atmospheric Rivers (AR) are relatively narrow regions in the atmosphere that are responsible for most of the.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
CBRFC April 2014 CUWCD Briefing/Meeting 1:30pm April 8, 2014 Ashley Nielson.
CRFS Technical Meeting LC Operations Update November 8, 2011.
Municipal Water District of Orange County 2015 Water Supply Report February 10, 2015.
Southwest Hydrometeorology Symposium Tempe, AZ September 28, 2011 Kevin Werner NWS Colorado Basin River Forecast Center : A Year of Extremes.
Hydrologic Modeling with SSARR and HEC-HMS
California Geology - 4 California Water Project California has several major rivers, canals, and aqueducts.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
46 th Annual Mid-Pacific Region 2013 Water Users Conference Water Supply Outlook Reno, Nevada January 23-25, 2013.
By studying the layers of snowpack we can improve our predictions of when and where avalanches are likely to occur. Note that precipitation amounts seem.
Center for Science in the Earth System Annual Meeting June 8, 2005 Briefing: Hydrology and water resources.
Urban Water Institute August 27, 2015 Managing the Colorado River during Drought.
NE Drought Conditions CARC Update: April 2011 Mark Svoboda and Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln.
Eric Bergh Manager of Resources October 28 th, 2009 Climate Change and Water Supply An Urban Water Agency’s Perspective.
Hydrologic Conditions Update and Outlook for Flood Season December 2013 Hydrology and Flood Operations Office Division of Flood Management Department.
Central Valley Flood Protection Board Update Presented by: Michael Mierzwa, P.E. Lead Flood Management Planner California.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING IV U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
CALSIM II - San Joaquin River Basin Refinements and Results Presentation by Dan Steiner On behalf of the San Joaquin River Group Authority March 14, 2005.
Water Supply and Flood Forecasting with Climate Change Michael Anderson, PhD California Department of Water Resources Division of Flood Management.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
California Water Briefing APRIL 2006 Department of Water Resources.
Model Overview Application of CALSIM II to Friant System.
Climate Change and Water Resources Joint Headquarters Meeting 31 May 2007 Presented by: Kate White, PhD, PE
NE Drought Conditions CARC Update: November 17, 2015 Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln School of Natural Resources.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
M ETEOROLOGICAL C ONDITIONS A SSOCIATED WITH THE 2008 MIDWEST FLOOD Ray Wolf NOAA / National Weather Service Davenport, Iowa University of Iowa – Learning.
Colorado Basin River Forecast Center Greg Smith Senior Hydrologist National Weather Service Colorado Basin River Forecast Center January 25, 2011 Navajo.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Reclamation and Hoover Dam It’s All About The Water.
CRFS Technical Meeting LC Operations Update November 14, 2012.
CRFS Technical Meeting LC Operations Update March 27, 2014.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Tom Buschatzke Director Arizona Department of Water Resources
Estimating Changes in Flood Risk due to 20th Century Warming and Climate Variability in the Western U.S. Alan F. Hamlet Dennis P. Lettenmaier.
Upper Snake Reservoir Operations October 13, 2015
Kootenai Basin Spring/Summer Operations for 2016
Kootenai Basin Spring/SummerOperations for 2016
Presentation transcript:

IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009

Reclamation Mission Statement Is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public.

Overview Reclamation and Friant History Watershed and Supplies Millerton Lake Operations –Normal Operations –Flood Operations 2006 Operations at Millerton Lake Upper San Joaquin Basin Model Climate Change in the Upper Basin Summary

Bureau of Reclamation History June 17, 1902, President Theodore Roosevelt signed the Reclamation Act: –Settlement in the West by providing water for small-scale family farms. August 26, 1937, President Franklin Delano Roosevelt signed the River and Harbor Act: –Authorized the Central Valley Project for construction including Friant Dam and other public works facilities.

Friant Dam History Completed in 1942 – Height: 319 feet – Crest Length: 3,488 feet Used for Flood Control & Water Conservation to meet demands. – Irrigation – Municipal – Industrial Downstream release points: –San Joaquin River –Friant-Kern Canal –Madera Canal

Watershed and Supplies DamStream [50-year average] [7-year average] ShastaSacramento6,107,000 AF3,650,000 AF FriantSan Joaquin1,836,000 AF1,040,000 AF FolsomAmerican2,719,000 AF1,560,000 AF Trinity 1,398,000 AF 680,000 AF Table 1: Average Annual Historical Runoff Redding to Bakersfield: 447 miles Sacramento to Fresno: 176 miles Facts: – The Central Valley: 1/3 is Valley Floor, 2/3 are Mountainous – Cascade Range Elevation (North): 14,000 ft – Sierra Nevada Elevation (East): 14,000 ft – Coast Range Elevation (West): 8,000 ft

United States Federal and State Agencies: Army Corps of Engineers Department of Water Resources (DWR) National Weather Service Private Utilities: Southern California Edison (SCE) Pacific Gas and Electric (PG&E) Water Users: 28 Districts – Irrigation, Municipal, Industrial Downstream Interest: Lower San Joaquin River Levee District Land Owners Millerton Lake Operations Stakeholders

Millerton Lake Operations

Flood Operations – Millerton Lake Upper San Joaquin River Floods occurs about 4 out of 10 years. Rain Floods: results of intense rainfall in the Sierra Mountains. –Period typically: November to March –January 2, 1997: largest rain flood estimated maximum daily flow of 77,500 cfs and a 7-day volume of 416,700 AF. Snowmelt Floods: results of mountain snowmelt. –Snowmelt floods are sustained, moderate flows for 2 – 3 months, resulting in large volumes of runoff. –Snowmelt produces ~70% of annual water supply. –1906: largest snowmelt flood with a maximum daily flow of 26,300 cfs and a April – July volume of 3.34 million AF.

Flood Operations – Millerton Lake 170,000 AF 390,000 AF Dead Pool Space = 130,000 AF 520,500 AF Flood Control Storage Reservation Diagram Snowmelt 130,000 AF

2006 Operations at Millerton Lake March 1, 2006, the San Joaquin River basin hydrologic conditions were at the historic average and the DWR 50 Percent exceedance forecast was 1.27 million AF. By early April, storage capacity was at 95 percent. First week of April produced 10 inches of rain. –April’s 100-year average precipitation is 3 inches. –More than 300 percent of normal conditions.

2006 Operations at Millerton Lake 525,747 AF 520,823 AF 522,201 AF 26,000 CFS

2006 Operations - Forecasting Error

50% Forecast vs. Flood Volume 2006 Operations

Upper San Joaquin Basin Model (USAN) The USAN model was developed to study re-operation of the upstream reservoirs to enhance the Friant Division water supply. –Improve Friant Division operations and enhance the water supply. –Simulates Flood real-time data from 1896 to present. –Used daily to produce short-term reservoir operations with real-time data (storage, deliveries, releases, etc.) USAN uses a daily time step of projected operations applied to historic unimpaired flow data.

Upper San Joaquin Basin Model (USAN) USAN limitations: –Operational decisions based on forecasts. –Millerton Lake February 1 st storage plus the February – July unregulated flow forecast to determine the amount of water available for deliveries each year. –Difficult with flexibility to varying conditions or water years in the volume of water available for diversion during snowmelts of equal volume. (Distribution of snowmelt may cause variations in over 100,000 AF)

Climate Change in the Upper Basin Important effects to Friant Operations: –Changes in rainfall timing and intensity –Total snow and ice coverage –A rise in ambient temperature Total snow accumulation in the western U.S. has declined over the period –Higher temperatures threaten to reduce accumulation up to 40% in the Sierra Nevada. Climate change effects the watershed and operations at Friant Dam, increasing the probability of a rain flood and decreasing the magnitude of snowmelt flows.

Precipitation Trends in

The San Joaquin River has two major runoff seasons –November through March is predominately rain –April through July is predominately snowmelt Snowmelt produces ~70% of annual water supply Managing Friant Division’s Central Valley Project Water Supply considers: –The information needed to make operational decisions –The speculative nature of some information (especially early in the season) –The importance of water supply to the end user –The importance of providing protection from floods A mission that requires close communication and coordination with many parties and a significant amount of professional judgment. Summary

Typical Day at Millerton Lake ? ? ?

Questions? Thank You PowerPoint By: Robert Campbell, Rufino Gonzalez