SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
OC Chair Items Don Watkins June 18-19, 2009 Operating Committee.
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Marianna Vaiman, V&R Energy
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
Synchrophasors: Improving Reliability & Situational Awareness
August 14, 2003 Blackout Final Report
Introduction to Phasor Measurements Units (PMUs)
WECC Joint Synchronized Information Subcommittee
BS Information Systems – University of Redlands BS Information Systems – University of Redlands AS Electronic Technology AS Electronic Technology Project.
1 Eric T. Whitley Selected Relevant Experience Background Eric T. Whitley President & CEO 1831 Iron Point Road, Suite 140 Folsom, CA Tel: (916)
NASPI Proposed Maturity Model for Synchrophasor Deployment Alison Silverstein (NASPI) Ryan Quint (Dominion Virginia Power) Kyle Thomas (Dominion Virginia.
NASPI overview and update
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
PHAAUG – Peak Reliability
Standards Update Project Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Peak RCCo Performance Metrics Draft –November 2013.
WIRAB Comments to the Peak Reliability Interim Board Doug Larson, WIRAB December 4, 2013.
1 Crisis Response Task Force (CRTF) Proposal Tom Bowe (Chairman) CSO, PJM Interconnection Scott Heffentrager (Temp. Chairman) Physical Security.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
SacProNet An Overview of Project Management Techniques.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
FERC Staff’s Report on Demand Response and Advanced Metering.
Model Validation using PSS®E
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
System Restoration & Blackstart Standards Drafting Team Presentation to Texas RE Reliability Standards Committee March 4, 2009 Rick Terrill Confidential.
NERC Update Current Activities Ryan Quint, Ph.D., P.E. Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
2017 WECC JSIS Report March 21, 2017.
Interchange Scheduling & Accounting Subcommittee
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Path Operator Implementation Task Force
Western Electricity Coordinating Council
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Cascading Failure Working Group of
Western Electricity Coordinating Council
NERC LMTF Update Update on Key Topics
NERC Reliability Standards Development Plan
2017 WECC JSIS Report March 21, 2017.
Western Electricity Coordinating Council
WISP Follow on Reporting.
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
WECC Joint Synchronized Information Subcommittee
NERC Reliability Standards Development Plan
Presentation transcript:

SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22, 2015

Background NERC SMS approved by PC in December 2012 Sat dormant until recently – NERC Staff decided to kick this effort off due to available resources and expertise SMS Formation Announcement went out July 2 First Meeting held September 2-3 in Golden, CO Roster currently has over 70 members First meeting had 20+ in person, 25+ on phone Strong industry support for efforts underway

Work Tasks SMS brainstormed key tasks to tackle first and developed tentative timelines for those deliverables # Task Frequency Due Date 1 PMU Placement Guidelines Once Q2 2016 2 SW Outage Recommendation 27: Angular Separation 3 Utilizing PMUs for NERC Reliability Standards Q3 2016 4 Model Verification Using PMUs Q4 2016 5 Technical Workshop on PMU Utilization 6 PMUs for Cascading Outages Q2 2017 7 Monitoring IEEE C37.118 Certification Process Ongoing N/A 8 Monitor Operator Training Practices

Task 1: PMU Placement Guidelines Task Descriptions Task 1: PMU Placement Guidelines Review current industry references on this subject Develop guidelines and industry practices for placement of PMUs Focus on application specific requirements Task 2: SW Outage Recommendation 27: Angular Separation Develop a technical report on Recommendation 27 from the Pacific Southwest Blackout Report focusing on angular separation Identify industry practices, particularly in the Pacific Southwest, regarding capturing angle differences Discuss various methods for angle difference calculation techniques Develop industry practices around real-time angle difference monitoring Develop industry practices on mitigation strategies for angle limit violations Roadmap future efforts around phase angle difference monitoring and alarming

Task 3: Utilizing PMUs for NERC Reliability Standards Task Descriptions Task 3: Utilizing PMUs for NERC Reliability Standards Review current and future NERC Reliability Standards, and identify how PMU technology can be applied to meet these standards Prioritize and outline the maturity level of technology related to each standard Define future areas where PMUs could be applied to current or future NERC Reliability Standards Identify standards that could impact or influence PMU technology Task 4: Model Verification using PMUs Continue working with industry to expand use of PMUs for model verification Work with vendors to benchmark software tools and applications against actual system events Develop practices and guidelines around model verification tools

Task 5: Technical Workshop @ NERC Task Descriptions Task 5: Technical Workshop @ NERC Hold technical workshop on PMU technology used by operating entities – current applications, future work, industry priorities, etc. Bring in select subject matter experts to raise industry awareness on key focus areas for this technology Dialogue regarding path forward for development of tools & applications, procedures for real-time situational awareness, offline analysis, and training Task 6: PMUs for Cascading Outages Explore practices for utilizing PMUs to predict and mitigate potential for cascading outages Explore applications and practices for monitoring stability limits using PMUs Explore utilizing PMUs for system restoration Coordinate with IEEE Cascading Failures Working Group (CFWG)

Task 7: Monitor IEEE Certification Task Descriptions Task 7: Monitor IEEE Certification Monitor the progress of establishment of IEEE C37.118 certification laboratories and processes Develop and maintain a list of certification laboratories Develop and maintain a list of certified devices Task 8: Monitor Operator Training Practices Monitor existing operator training practices related to synchronized data Explore NERC Certification Process for PMU-based Training Develop Conceptual training materials – application agnostic

First Meeting Highlights Started the first meeting with two sets of roundtable presentations “Lead by example” – presented current prioritized efforts and vision from industry and solution provider perspectives Industry Roundtable Tony Faris, BPA Hongming Zhang, Peak RC Ryan Nice, PJM Aftab Alam, CAISO Floyd Galvan, Entergy Solution Provider Highlights Marianna Vaiman, V&R Energy Ken Martin, Electric Power Group Guru Pai, Alstom Grid Greg Zweigle, Schweitzer George Zheng, PowerTech Chuck Wells, OSIsoft

First Meeting Highlights Data Quality Monitoring Data Quality Reporting Online Data Checking Tools

First Meeting Highlights Angle Monitoring Oscillation Detection Event Detection Integration with EMS

First Meeting Highlights Modal Analysis Tools Angular Separation Monitoring Security Boundary Visualization Event Investigation Linear State Estimation

Coordination Will Be KEY! North American Synchrophasor Initiative (NASPI) Driving light of technology advancement for synchronized technology WECC Joint Synchronized Information Subcommittee (JSIS) High value application development for West, seek to build off JSIS efforts and share practices amongst interconnections IEEE/IEC Coordinate with industry standards development and certification NERC Registered Entities Vendors, Consultants, Solution Providers Bring together development expertise and utility members Other NERC Subcommittees (OC & PC)

SMS Perspective “Should the SMS reside under the PC or the OC?” The efforts around advancing synchronized measurement technology encompass both aspects… heavily… All technology starts in the planning realm As technology matures, it moves from concept to prototype to operations We believe we will fit very nicely within the PC for now Will have strong liaison with the OC May explore concept of a Joint PC/OC Subcommittee (JSMS).

Coverage Peak RC BC Hydro BPA PGE PAC MH HQ ISO-NE NYPA NYISO ATC CAISO PG&E ATC PJM DVP FERC SCE SDG&E SRP PNM Southern ERCOT Entergy FPL

Engaged team of SMEs from across industry Closing Remarks SMS is up and running! Engaged team of SMEs from across industry Still looking for participation from SMEs within operating entities in certain regions (coverage of NERC footprint) West – Eastern Region Midwest – AEP, MISO, ComEd Southeast – Duke Canada – Maritimes, Alberta, Sask Power Feel free to reach out to Ryan Quint (ryan.quint@nerc.net.), SMS Staff Coordinator if interested or with any questions Team eager to advance synchronized measurement technology and advance utilization for bulk power system reliability!

Questions and Answers