IEC WG Summaries Austin, TX October 24, 2007. WG 13 – EMS API Convener: Terry Saxton The principal task of the IEC 61970 series of standards is to develop.

Slides:



Advertisements
Similar presentations
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Advertisements

TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
IEC TC57 WG14 Scott Neumann December 8, IEC TC57 WG14 Developing IEC Focus is to describe the information exchanges between systems (i.e.
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
MTEI Methods & Tools for Enterprise Integration
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
GridWise ® Architecture Council Cyber-Physical System Requirements for Transactive Energy Systems Shawn A. Chandler Maseeh College of Electrical and Computer.
CCAPI Project Status Update
PROJECT NAME: DHS Watch List Integration (WLI) Information Sharing Environment (ISE) MANAGER: Michael Borden PHONE: (703) extension 105.
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
Common Information Model and EPRI Smart Grid Research
CIM and UML Overview Terry Saxton Xtensible Solutions
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
Metadata IN Smart Grid Group Name: REQ
Project Proposal: CTS2 SDK Presentation to OHT Steering Committee.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
CIMug Asset Health Focus Community Update for European CIMug Meeting June 19, 2014 Pat Brown EPRI.
TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13.
IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL.
INTERNATIONAL ELECTROTECHNICAL COMMISSION “TC57 and the Smart Grid” CIM Users Group, 2011, May 11 th, Prague.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Educational Achievement Project Kickoff. Goals Develop an initial technical specification for the exchange of educational achievement data across medical.
ISO/IEC JTC1 SC 32 WG1 eBusiness July 2007 JTC1 SC32 N1620.
“ 2005 EMS Users Group Meeting”
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
IEC TC57 WG15 - Security Status & Roadmap, TC57 Plenary, May 2007
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
TC 57 TC 57 UML/XML Workshop Report for CIM user Group Jun 2007 Netherlands (ARNHEM) EDF R&D.
SCORM Status. 2 Stabilization, Clarification and Issue Resolution Bug Fixes, Corrections & Clarifications SCORM 2004 January 2004 SCORM nd Edition.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona May “ System Interfaces for Distribution Management “ TC57 WG14 Standards IEC
IEC TC57 Smart Grid Task Force Ed Dobrowolski for Scott Neumann 16 June 2010.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Process WG Summary Austin, TX October 26, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Meetings: Europe – June 10, 2008 – June 13, 2008 in.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
TC CIM Model Manager Summary Kendall Demaree AREVA T&D Inc. March 2009.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
SMART GRID Standardization and Implementation Experience Narendra Singh Head (Electronics and IT) Bureau of Indian Standards.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
IEC for SUBSTATION AUTOMATION TOWARDS MULTI-VENDOR INTEROPERABility OVER The SYSTEMS LIFECYCLE The ENTSO-E Approach KUL – Power Symposium Leuven,
[WP1] T1.2 User and Business Requirements
WPM ad-hoc group report TP#25
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Data and Applications Security Developments and Directions
Asset Health Data Modeling Update on Current Work
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Distributed Marine Data System:
“SG-Systems” (Smart Grid – Operational Applications Integration) Meeting Agenda Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Frances Cleveland Convenor WG15
Presented 12 June 2008 Vasteras, Sweden
EDF expectations regarding Interoperability tests
IEC TC57 Smart Grid Activities
CIM Model Manager Report
GIS “PLANNING ORIENTED” FOR SMALL AND RURAL UTILITIES.
Organizing Semantics For Effective Enterprise Application Integration
Data and Applications Security Developments and Directions
Data and Applications Security Developments and Directions
February 2007 Note: Source:.
Data and Applications Security Developments and Directions
2015 January February March April May June July August September
Scott Neumann December 8, 2005
Presentation transcript:

IEC WG Summaries Austin, TX October 24, 2007

WG 13 – EMS API Convener: Terry Saxton The principal task of the IEC series of standards is to develop a set of guidelines and standards to facilitate (1) the integration of applications developed by different suppliers in the control center environment and (2) the exchange of information to systems external to the control center environment.

WG13 – Activities NWIPs on: –Model Exchange Headers (Lars-Ola) –SE Solution Interface (Jay) –EMS Model Update Interface (Jay) –CIM OWL Schema (Arnold) –Program Invocation through the GID (John) 301 Update each year Resolution of CIM issues

WG 14 - System Interfaces For Distribution Management Convener: Greg Robinson Next steps for documents: Part 1: Interface Architecture and General Requirements –(maintenance cycle) Revised document to IEC in February 2008 Part 2: Glossary –(maintenance cycle) Revised document to IEC in August 2008 Part 3: Network Operations –(maintenance cycle) Revised document to IEC in July 2008 Part 4: Records & Asset Management –FDIS released to IEC December 2006 Part 5: Operational Planning and Optimization –NWIP & initial CD to IEC in August 2008 Part 6: Maintenance & Construction –NWIP & initial CD to IEC by December 2007 Part 7: Network Extension Planning –NWIP & initial CD to IEC December 2008

WG14 - Activities Part 8: Customer Support –NWIP & initial CD to IEC in September 2007 Part 9: Meter Reading and Control –Revised CD to IEC in September 2007 Part 10: External to DMS –NWIP & Initial CD to IEC in December 2008 Part 11: Common Information Model for DMS –NWIP & initial CD to IEC in February 2008 Part 12: Use Case Technical Report –NWIP & initial CD to IEC in July 2008 Part 13: Common Distribution Power System Model –FDIS to IEC in August 2007 Part 14: XML Naming and Design Rules –Draft document in review, NWIP & initial CD in February 2008

WG 16 Convener: Jim Waight

WG 19 Convener: Paul Skare Scope: Interoperability within TC 57 Vision: All new TC57 standards should use/extend the CIM as the common semantics for their configuration/engineering modeling, and for [SCADA oriented / IED / field] communications. Other existing standards would likely take a mapping approach. Foster a common data modeling approach across TC 57.

WG19 – Activities Reference Architecture: lead = Terry Saxton Quality Codes: lead = Ketil Rian to Control Center: lead = Christoph Brunner Good Working Practices document