Presentation is loading. Please wait.

Presentation is loading. Please wait.

EDF expectations regarding Interoperability tests

Similar presentations


Presentation on theme: "EDF expectations regarding Interoperability tests"— Presentation transcript:

1 EDF expectations regarding Interoperability tests
Eric LAMBERT EDF R&D Charlotte CIMUg 2009 20 novembre novembre 2018 Groupe EDF

2 Topics EDF experience with IOP tests & lessons learned
Needs based on actual CIM EDF Group related projects ERDF (EDF Distribution Subsidiary) CIM roadmap and CIM roadmap for 61968 Conclusion : IOP tests needs for EDF Group TSO/DSO November 2009 EDF R&D

3 EDF experience with IOP tests
EDF R&D participated in IOP tests 2004, 2005, 2006 Understanding what was an IOP test (CPSM) Promoting new needs through networks modelized in CIM CIM for UCTE network (anticipation for European TSOs) CIM for Distribution need (anticipation for CDPSM profile) Participating implied to provide software with CIM APIs EDF R&D participated in IOP tests 2009 for TSO needs in Europe EDF R&D provided converters from old UCTE format to the new CIM profile that TSOs in Europe defined through UCTE and IEC Task force November 2009 EDF R&D

4 EDF lessons learned & needs
Time consuming effort : it has a non negligeable cost Tools used recently have facilitated the process : hopefully these tools were mostly free of use An IOP test must be defined according to a Standard part It’s the only proof to demonstrate that the standard is implemented and useful That’s aligned with wg14 roadmap : an IOP test for each part No networks clearly identified that could be re-used consistently through IOP tests These should be clearly identified and managed through IOP tests IOP tests must be planned in advance with scope, objectives and participants. Based on this we can schedule them and dedicate resources to them. Stakeholders have to be identified clearly. November 2009 EDF R&D

5 Interface Reference Model Status
Part 1 : Architecture & general requirements Part 2 : Glossary NO Network Operations AM Asset Management OP Operationnal Planning & Optimisation MC Maintenance & construction EMS Energy Management RET Retail SC Supply Chain Interface part 3 Interface part 4 Interface part 5 Interface part 6 Interface part 10 Interface part 10 Interface part 10 IEC compliant middleware services Interface part 7 Interface part 8 Interface part 9 Interface part 10 Interface part 10 Interface part 10 Interface part 10 NE Network Extension planning CS Customer Support MR Meter Reading ACT Customer Account Management FIN Financial PRM Premises HR Human Resources Part 11 : CIM for DMS Part 13 : CDPSM International Standard IS Maintenance Proposal Not started November 2009 EDF R&D 20 novembre novembre 2018 Groupe EDF

6 CIM roadmap for eRDF (1/2)
The first phase of the roadmap identifies the following tasks : “ Synchronize the distribution network descriptions ” This phase identifies the exchange between the GIS managing eRDF assets, the remote control system and the future AMM system. “ Populate and use a quality repository ” Sharing quality data in a same format. “ Populate and use a Measurement repository ” Sharing load and generation data in a same format. November 2009 EDF R&D 20 novembre novembre 2018 Groupe EDF

7 CIM roadmap for eRDF (2/2)
The second phase of the roadmap identifies the following tasks : “ Reinforce computer assisted maintenance project ” “ Dematerialize documents exchanged between remote control system, operation, maintenance ” “ Reinforce the asset life cycle ” Equipments tracability November 2009 EDF R&D 20 novembre novembre 2018 Groupe EDF

8 IEC WG14 ROADMAP (1/2) 2009 Interoperability tests on (FDIS) (CIM Interfaces for Metering) postponed to January => EDF R&D will participate Interoperability tests on (IS) (Common Distribution Power System Model) december => EDF R&D will participate CIM Model for Distribution ( ) (CDV) Will be reinforced based on TF discussions ERDF and edf r&d established a roadmap to implement this approach in its Isystem. The objective is to propose priorities for data intergation projects : the first one is to synchronize network descriptions, or as you can see reinforce asset life cycle in order to improve traceability. November 2009 EDF R&D 20 novembre novembre 2018 Groupe EDF

9 IEC WG14 ROADMAP (2/2) 2010 Maintenance cycle on « Interfaces for Network Operation » ( ) review IS and plan IOP tests Maintenance cycle on « Interfaces for Asset Management » ( ) review IS and plan IOP tests ERDF and edf r&d established a roadmap to implement this approach in its Isystem. The objective is to propose priorities for data intergation projects : the first one is to synchronize network descriptions, or as you can see reinforce asset life cycle in order to improve traceability. November 2009 EDF R&D 20 novembre novembre 2018 Groupe EDF

10 The CIM roadmap continuation
SOLFEGE R&D project : generalize CIM-eRDF usage for eRDF operational projects. Work planning AMM 2010 MV/LV extension planning tools Generating CIM for Distribution Power quality MSITE model growing 2009 Synchronization Maintenance management LV network MV network modelling Today November 2009 EDF R&D 20 novembre novembre 2018 Groupe EDF

11 Managing CIM-eRDF/CIM versions
Today CIM model versions next CIM version 14 Official CIM version 13 Have to consider and anticipate the next version (14) 12 MV network description GIS and SCADA exchanges LV network description 11 Maintenance Power quality AMM GIS and calculation codes exchanges 10 MSITE model versions before MSITE… 1.0 1.1 2.0 2.1 2.2 November 2009 EDF R&D

12 Conclusion : IOP tests needs for EDF
TSO level : CIM/ENTSO-E harmonisation for the Market in Europe DSO level : CDPSM profile ( ) Metering interfaces ( ) GIS to DMS interfaces ( , ) Interfaces to planning tools ( ) Interfaces to Work Management systems ( ) Don’t forget : Some IOP tests can concern TSO AND DSO needs ! For instance : planning tools CIM & Interoperability tests must exist based on CIM/ Models and derived profiles November 2009 EDF R&D

13 Thanks for your attention ! Eric
November 2009 EDF R&D


Download ppt "EDF expectations regarding Interoperability tests"

Similar presentations


Ads by Google