TG # 6 API SC13 Meeting Winter Standards Meeting January 24 – 28, 2011 Fort Worth, Texas.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Preparation of the Self-Study and Documentation
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
API - WI 2348 Methodology to provide Mechanical Assurance in DCB test
Sub-Committee 13 API SC13 Drilling Completion and Fracturing Fluids June 13, 2012 Westminster, Colorado Paul Scott, Chair Johnna Smith, Secretary David.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
TG-8, Drilling Fluid Materials ( Xanthan WG) Develop addendum to current xanthan gum specifications in API 13A/ISO that address anomalies observed.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
Meetings and minutes.
SPEC 13A Sec. 16 Drilling-grade Starch
API Exploration & Production Standards Winter Meeting Fort Worth, January 26 th, 2011 Testing Heavy Brines API 13 J – ISO DIS Hydrometers & Density.
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction State Performance Plan (SPP) & Annual Performance Report.
Property Scaling Relations for Nonpolar Hydrocarbons Sai R. Panuganti 1, Francisco M. Vargas 1, 2, Walter G. Chapman 1 1 Chemical and Biomolecular Engineering.
Standards Governance Update 2010 E&P Winter Standards Meeting January 29, 2010 New Orleans, LA.
SC13 API SC13 Drilling Completion and Fracturing Fluids Jan 26, 2011 Fort Worth, TX Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair.
SC13 Summer 2011 API SC13 Drilling Completion and Fracturing Fluids June 29, 2011 San Francisco, CA Paul Scott, Chair Johnna Smith, Secretary David Ekas.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
SC14 Report to the SC13 Plenary Larry Schultz, Chairman Erin Cliggett Kahn, Secretary 17 June 2008.
API SC13 TG08 WG05 SPEC 13A Sec. 16 Drilling-grade Starch SC13 – Drilling Completion and Fracturing Fluids June 17, 2014.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
2010 API Summer Standardization Conference Task Group 8, Work Group 4 Report to TG 8 6/29/2010.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
Task Group 8, Work Group _ API Reference Materials Work Group Work Group Members: BAKER HUGHES INC.; Don Krause* CHEVRON : Keith Morton HALLIBURTON – BAROID.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
WG or TG # API SC13TG 10 API 19C Meeting July 15, 2014 Rapid City, South Dakota.
GSICS Procedure for Product Acceptance (GPPA) WorkFlow GCC Presented by Fangfang Yu 12/03/
WG on Composite Cements: Composite cement Annex for API Spec 10A - Final Amendments Austin, January 2016, Heiko Plack.
API 2017 Exploration and Production Winter Standards Meeting
API 2016 Exploration & Production Standards
Preparation of the Self-Study and Documentation
Strategy and Management Table Proposals
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group Update:
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
Brent Estes, Chair Carl Stouffer, Secretary Saleh Al-Amari, Vice-Chair
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
2017 API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
API SC13TG 10 API 19C Meeting July 16, 2014
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
SC13TG08 Drilling Fluid Materials
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Saskatchewan Measurement Directive PNG017 DRAFT CHANGES
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
HMC-4 Meeting 15th May 2018 London
WG on Composite Cements: Calgary Meeting 2017
Saleh Al-Ammari SC13 Chair
Saleh Al-Ammari SC13 Chair
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
CSOEM Materials Advisory Resource Group
API SC 10, Work Group 13 Update:
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group 13 Update:
Presentation transcript:

TG # 6 API SC13 Meeting Winter Standards Meeting January 24 – 28, 2011 Fort Worth, Texas

TG # 6 Agenda TG-6: Testing of Heavy Brine TG Charges Roll Call Previous Meeting Minutes – Approval Publication Status/ Reports / Data / Conclusions / Recommendations/ Gantt Chart Old Business New Business - Next Scheduled Meeting Action Items Adjourn

TG # 6 TG – 6 Charge Recommend, develop and evaluate procedures for field and laboratory testing of heavy brines. Update, revise and expand API RP-13J, “ Testing of Heavy Brines ” and “ ISO/WD 13503, Part 3: Testing of heavy brines ”. Form Work Groups to achieve specific charges.

TG # 6 TG-6 Members / Role Call 1. Paul H. Javora – Baker Hughes – Chair 2. Saleh Al-Ammari - Aramco 3. William J. Benton – Cabot 4. Brent Estes – ChevronTexaco 5. Judy Guy-Caffey – Tetra 6. Bill Foxenberg – Schlumberger (Adelina Son) 7. Catalin Ivan – ExxonMobil 8. Paul Scott – ConocoPhillips 9. Tom Shumate – Baroid 10. Cheryl L. Stark – ret. 11. Victoria Qiu - Shell (Tom Jones – BHI)

TG # 6 Previous Meeting Minutes Met in Washington, DC, June 2010 Members Present 1.Brent Estes 2.Judy Guy-Caffey 3.Catalin Ivan 4.Lirio Quintero for Tom Jones 5.Tom Shumate 6.Paul Scott 7.Del Son 8.Cheryl Stark 9.Saleh Al-Ammari Absent: Paul Javora, William Benton

TG # 6 Approval of Previous Minutes Motion: Maker: Second: Result:

TG # 6 Report 1. Revisions to Testing of Heavy Brines WG (ISO & RP-13J) Edit, revise & process DIS/FDIS comments of submitted documents – Adopt back as RP-13J 2. Buffer Work Group, Chaired by Del Son – Document completed Prepare a method for determining the buffering capacity of brine, Document completed, reviewed and submitted for ISO formatting, etc, participate in ISO acceptance of the document. Del Son – Chair, Beth Prasek – MI-SWACO, Kingsley Nzeadibe – Halliburton-Baroid, Siv Howard – Cabot, Mohammad Tej – Baker Hughes Drilling Fluids, Judy Guy-Caffey – Tetra Technologies, Paul Javora – BJ Services 3. PCT Work Group, Don Isaac, Chair, Halliburton Evaluate and qualify “in-house” PCT test procedures. Draft document on the Round Robin testing for the PCT of Brines completed, Last Round Robin to be completed January 2011 May 2011 Ferrill G. Dalton - Halliburton-Baroid, Paul Javora – BJ Services, Weyman Dunaway – Tetra Technologies, Andree Dunston – Ambar Lonestar, Mohammad Tej – Baker Hughes Drilling Fluids, Ken Slater – MI-SWACO, Charlie Svoboda – MI- SWACO, William Benton – Cabot

TG # 6 Report 4. Corrosion Work Group, Judy Guy-Caffey, Chair, Tetra Technologies, Inc., Document completed Update and complete the corrosion section of RP-13J, document completed, reviewed and submitted, participate in ISO acceptance of the document. Ed Malachosky (Co-secretary) – Baker Hughes Drilling Fluids, Mohammad Tej (Co-secretary) – Baker Hughes Drilling Fluids, John Augsburger – Halliburton-Baroid, Bill Bailey – Baker Oil Tools, William Benton – Cabot, Rashmi Bhavsar – Schlumberger, Yue Chen – Shell, Andree Dunston – Ambar Lonestar Fluid Services, Dodie Ezzat – Halliburton-Baroid, Bob Horton – MI-SWACO, retired, Don Isaac – Halliburton-Baroid, Paul Javora – BJ Services, Ardjan Kopliku – BP, Keith Sharp – BJ Services – Retired, Adelina J. Son – Champion Technologies 5. Future-Projects Work Group, Judy Guy-Caffey, Chair, Tetra Technologies, Inc. Establish/Suggest future projects for TG-6 to go beyond Future-Projects were identified, reviewed, submitted, selected and established. Document completed. John Augsburger – Halliburton-Baroid, Ferrill Dalton – Halliburton-Baroid, Paul Javora - BJ Services, Del Son, William Benton – Cabot, Siv Howard – Cabot, Bob Horton – MI-SWACO (Retired )

TG # 6 Report 6. Return Permeability Work Group, Dodie Ezzat, Chair, Halliburton 1. Compile and evaluate test procedures 2. Summarize testing parameters 3. Determine essential/desired parameters 4. Establish a suitable method or methods that satisfy oilfield requirements NOTE 1: Round-Robin testing not in scope NOTE 2: Confer with the ISO Project (13503 Series) already convened Members: Keith Morton - Chevron, Carl Stouffer, Mel Schmit, Paul Javora – Baker Hughes, Saleh Al-Ammari – Saudi Arabia, William Benton, Cabot

TG # 6 Report 7. Displacement Work Group, Ed Malachosky, Chair 1.Compile and evaluate test procedures 2. Summarize testing parameters 3. Determine essential/desired parameters 4. Conduct Round Robin Testing 5. Establish a suitable method or methods that satisfy oilfield requirements Members: Marshall Chiasson – Tetra, Keith Morton - Chevron, Ed Robinson – Halliburton, Dodie Ezzat – Halliburton, Paul Javora – Baker Hughes, Katrina Schultz – Baker Hughes, William Benton, Cabot

TG # 6 Report 8. Hydrate Work Group, Keith Morton, Chevron, Chair (Del Son) 1.Compile a list of hydrate programs 2.Summarize capabilities of each program 3.Generate test fluid compositions and parameters to compare programs 4.Conduct hydrate calculations with each program for the test fluids/conditions 5.Correlate the test results 6.Identify those programs that satisfy oilfield requirements NOTE 1: Round-Robin testing not in scope Members: Jennifer Shafer – Tetra, Dodie Ezzat – Halliburton, Paul Javora – Baker Hughes, William Benton, Cabot

TG # 6 Report 9.Scale Work Group, Judy Guy-Caffey, Tetra, Chair 1. Identify & compile oilfield scaling issues 2. Compile & evaluate test procedures 3. Identify & summarize essential/desired parameters 4. Summarize findings into a ‘knowledge document’ for completion engineers Members: Victoria Qiu – Shell, DonaldLindblad – Paladin Solutions, Curtis Sitz, Vice-Chair – CorsiTech, Kern Smith - Baker Hughes, Brittany Gitch, Secretary - Baker Hughes, Marc Lehmann - Baker Hughes, Vu Thieu – Baker Hughes, - Schlumberger, Paul Javora – Baker Hughes

TG # 6 Report 10.Emulsion Technology Work Group, Paul Javora, Chair ISO Series Work Group Establish a laboratory method or methods to evaluate the tendency to form emulsions or sludge when drilling, completing, fracturing or treating fluids contact formation fluids. Phase I – Establish Base-Line Profile (In-house & Standard Procedures) Phase II – Develop a Round Robin Scheme Current need: 55 gallons of crude oil - untreated Members: Keith Morton - Chevron, Brent Estes – Chevron, David Ekas – Marathon, Dodie Ezzat – Halliburton, Ferrill Dalton – Halliburton, Gary McGuffey, Paul Javora – Baker Hughes, Katrina Schultz – Baker Hughes, William Benton – Cabot, Patricia Potts – Baker Hughes, Phillip Kaufman – CESI Chemical, John Vian - Schlumberger

TG # 6 Report 11. API CRA Testing Program, Paul Javora, Baker Hughes, Chair Implement and monitor the API CRA Testing Program. Funding Year 3 completed and the final results were reviewed and sent to the Participants. Funding Year 4 was initiated in 2010, tests were discussed and planned, and the first four tests were implemented. Results expected in February. The first in a series of meetings to critically review Year 1 and 2 results was held December 2010.

TG # 6 17 Participating Companies for Year 4 Baker Hughes BJ Services Company Cabot Specialty Fluids ChevronTexaco Energy Technology Company ConocoPhillips ExxonMobil Halliburton Energy Services Hamilton Metals, Inc. Marathon Oil Company M-I SWACO Saudi Aramco Schlumberger Shell International E&P Inc. Siderca SAIC – Tenaris Sumitomo Metal Synergy Fluids Tetra Technology Inc.

TG # 6 Old Business 1.A 2.B 3.C

TG # 6 New Business 1. Testing Heavy Brines, API 13 J – ISO DIS Bernard Fraboulet, TOTAL Technology Specialists 2.B 3. C

TG # 6 API Exploration & Production Standards Winter Meeting Fort Worth, January 26 th, 2011 Testing Heavy Brines API 13 J – ISO DIS Hydrometers & Density measurements Bernard Fraboulet, TOTAL Technology Specialists

TG # 6 Density & specific gravity measurements  Hydrometers  Density hydrometer Concept : mass per unit of volume (ρ) SI Graduations in g/ml - kg/m 3 USC Graduations in ppg Reference temperatures  SI 20°C  USC : 70°C ( 21.1°C)  Relative density (specific gravity) hydrometer Concept : ratio of ρ sample by ρ water at the same temperature Graduation dimensionless Reference temperature 15.56°C /60°F Ratio of sample density to water density at 60°F : 999,012 kg/m 3 ≡ 0, g/ml (8,337 ppg)

TG # 6 Hydrometer and normative references  ISO 387: 1977 Principles of construction and adjustment  ISO 649:1981 Density hydrometer for general purposes part 1 : Specifications Part 2 : Test methods and use  for both part : no adoption by USA  ISO 650 :1977 Relative density 60/60°F hydrometers for general purposes  Not adoption by France and Germany and then by CEN

TG # 6 Reference & Reporting temperature ISO 387 Reference temperature Clause density hydrometer : − 20 °C (68°F) − In special circumstances : substitution to 15°C (59°F) or 27°C (80.6°F) − 27°C i.e 80°F recommended − other reference temperatures ? USA : 70 °F ? Clause 4.2 : relative density hydrometer − 60°F ( 15,56°C) for liquid and water  Density reporting temperature For any measurement done at a temperature which is not the reference one, a correction is required.  General reporting : when density hydrometer is used why to report at a different temperature than the reference ’s one ?  Does it need to get a direct conversion between SI ref. temperature to USC’s (20°C – 68°F) or between USC ref. temperature to SI’s (70°F – 21°C) ? Reporting temperature proposal : SI report : 20°C USC report : 70°F Left to users

TG # 6 Clause Hydrometer description More accurate description As per ISO’s : class M100 hydrometer Density hydrometer Relative density hydrometer Calibration : at least quarterly

TG # 6 Temperature Correction factor Density hydrometer Only a correction linked to hydrometer volumetric change is required : − Standard glass thermal volume expansion 20 x − Table linked to readings and temperature − Minor difference lower than uncertainty if the same table is used for 20°C or 70°F as reference temperature − Two tables ( SI and USC) possible

TG # 6 Temperature Correction factor Relative density hydrometer Reference temperature 60°F Correction whatever the reporting temperature Correction linked to − Glass volumetric change − Water temperature density variation  Correction factor : − Complex equation − tables of coefficient − variations as per author/references

TG # 6 Proposed changes Clause Temperature correction for hydrometer Density hydrometer Correction factor (unit kg/m 3 or g/ml) Relative density hydrometer sub clause  no changes  Add SI equations

TG # 6 Next Scheduled Meeting San Francisco, June 2011

TG # 6 Action Items 1.a 2.b 3.c

TG # 6 Adjourn Motion: Maker: Second: Result: Time of adjournment: