Michael R. Walker Research Director IGCC Financing Project Kennedy School of Government, Harvard University PH: , FX: Financing IGCC for Near-Term Deployment September 2004 Report available at:
Financing IGCC 2 Kennedy School IGCC Financing Project Sponsors: DOE (NETL) EPA (Clean Air Markets) National Commission on Energy Policy Packard Foundation June 03’—began study to develop financing program to stimulate IGCC deployment Feb. 04’—draft working paper & IGCC financing symposium at Harvard July 04’—final report: Deploying IGCC in this Decade with 3Party Covenant Financing Fall 04’—follow-up IGCC symposium, ongoing dialogue, issue papers, implementing legislation
Financing IGCC 3 IGCC financing project objectives Access to capital Share advanced technology risks Produce competitively priced energy Minimize federal costs Deploy half-dozen IGCC plants in this decade
Financing IGCC 4 IGCC deployment rationale Abundant domestic coal resource Energy & national security Energy independence Low cost electricity for economic growth Relieve natural gas price pressure Lower air pollutant emissions Less water consumption and waste Technical pathway for carbon control Foundation technology for hydrogen economy Reconcile coal use and environmental protection
Financing IGCC 5 50, , , , , , 's1960's1970's1980's1990's'00-'02 Fuel Type MW Historic U.S. capacity additions
Financing IGCC 6 Natural gas price volatility Average Delivered Fuel Prices to U.S. Electric Generators
Financing IGCC 7 IGCC deployment obstacles Economics Higher capital cost (~20% higher than PC) Higher kWh energy cost Public, not private benefits Perceived Technology Risks Construction overruns (EPC wrap?) Reliable performance (limited track record) Access to Capital Wall Street skepticism S&P utility credit rating from A to BBB (just above junk status) Environmentalist skepticism Renewable & conservation priority “Anti-coal” opposition
Financing IGCC 8 3-Party Covenant PUC Approved Revenue Stream Owner 20% Equity Investment Federal 80% Debt Guarantee IGCC Deployment
Financing IGCC 9 Federal loan guarantees Access to low-cost financing with favorable terms Lower cost debt Higher debt/equity ratio IGCC economic competitiveness 38% lower cost of capital 25% lower cost of energy Foundation for risk sharing Federal government State PUC/ ratepayers EPC contractor/technology vendors Owner
Financing IGCC 10 Traditional Utility Financing 80% Federal Loan Guarantee 45% Equity (18.6%) 80% Debt (5.5%) 20% Equity (18.6%) Pre-tax weighted cost of capital: 11.9% Pre-tax weighted cost of capital: 8.1% Cost of capital with 80% federal loan guarantee 55% Debt (6.5%)
Financing IGCC 11 IGCC cost of energy with guarantee
Financing IGCC 12 PC vs. IGCC cost of energy with guarantee
Financing IGCC 13 Loan guarantee risk mitigation—3Party Covenant Prohibitive risk and cost without protection Budget scoring based on risk of default Without risk mitigation scoring could be as high as 100% Assured revenue stream to reduce federal risk Upfront & ongoing determinations of prudence Approval of timely pass-through Project cost or power purchase agreement IOU, Muni, Coop Alternative credit enhancement Insurance Corporate credit Other
Financing IGCC 14 Federal budget cost Budget Cost of 1 cent/kWh equivalent incentive (3,500 MW of IGCC)
Financing IGCC 15 State PUC participation Benefits Low cost base load power Low air emissions Hedge against future CO 2 Promote long-term sustainable coal use Local coal and jobs Ratepayer protections Transparent PUC process 10% construction and operating reserve fund 15% line of credit EPC performance guarantees Gasifier redundancy
Financing IGCC 16 NGCC refueling opportunity Convert to base load plant Establish need for base load power net of new PC Long-term power purchase agreement Inclusion by PUC in rates New valuation Base load vs. cycling 80% vs. 20% operations Potentially par value Financing 80% federally guaranteed debt Existing plant becomes equity contribution Equity that remains in earns regulated 11.5 after tax return Surplus equity withdrawn