Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

Early Results from the COS Time-Dependent Spectroscopic Sensitivity Programs Rachel Osten TIPS presentation, Jan. 21, 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
6e-1 Science Data Products Daryl Swade DMS Systems Engineer S&OC System Design Review #1.
Data Management Subsystem: Data Processing, Calibration and Archive Systems for JWST with implications for HST Gretchen Greene & Perry Greenfield.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
File FormatsFile Formats File Name ConventionsFile Name Conventions File ContentsFile Contents Association Contents & RulesAssociation Contents & Rules.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
The Status of COS Flat Fields Tom Ake TIPS 21 August 2008.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Outline of CALCOS Processing Steps and Keywords Reference Files Associations.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
28 February 2008 COS Training Series IV 1 COS Training Series IV: COS Post-observation M.E. Kaiser P. E. Hodge 28 February 2008 COS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
COS Training Series II. Optimizing Observations --- David Sahnow February mm.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
COS Training Series COS Update: pre-SMOV / Cycle Tony Keyes March 2009.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline and Archives Preliminary Design Review 7 December 2000.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
JWST Pipeline Overview
COS FUV Flat Fields and Signal-to-Noise Characteristics
Instrument Introduction
File Formats File Name Conventions File Contents File Sizes
WFC3 Pipeline Critical Design Review October 16, 2001
Presentation transcript:

Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode) and dark exposures > FUV and NUV completed and tested at STScI > Ball testing per FSW availability timeline > OP-01 and good process (COWG) in place – ACCUM and Target Acquisition presently in development > On schedule

Keyes - 5 Mar 2001 Slide 2 of 16 COS Phase Development Plan (Rev 4, 1/17/01) Phase 1 (1/1/00 – 6/30/00) 1.Macro Development 2.Reconfigurations Phase 2 (7/1/00 – 12/31/00) 3.NUV Timetag Mode + Darks 4.FUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) 5.FUV & NUV Accumulation Science Exposures 6.FUV & NUV Target Acquisition Exposures 7.FUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) 8.Aperture Alignment Exposures 9.OSM1 Focus Alignment Exposures 10.OSM1 Rotation Alignment Exposures 11.OSM2 Rotation Alignment Exposures 12.FUV & NUV Flat Field Lamp Calibration Exposures Phase 5 (1/1/02 – 6/30/02) 13.FUV & NUV GO Wavelength Calibration Exposures 14.FUV & NUV Automatic Wavelength Calibration Exposures 15.FUV & NUV FP Split Exposures 16.SAA Contours Phase 6 (7/1/02 – 12/31/02) 17.SMGT Preparations 18.SMOV Special Commanding 19.FUV & NUV Anomalous Recovery 20.FUV & NUV Initial Turn-on 21.FUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) 22.FUV & NUV Lifetime Adjustments

Keyes - 5 Mar 2001 Slide 3 of 16 COS Science Team Meeting – STScI Status  Pipeline Activities (Ground System “Back-end”) – PDR held 7 December 2000 at STScI > Very successful; excellent input from IDT and STScI systems – OPUS, Hubble Data Archive, calibration ( calcos ) design started – CDRs in April and June – AV-03 and good process (CALWG) in place

Keyes - 5 Mar 2001 Slide 4 of 16 COS Science Team Meeting – STScI Status  COS Thermal Vac Data-Processing Memorandum of Understanding – Defines COS IDT, Ball, and STScI schedule of deliverables – Raw SI data processed through generic conversion by OPUS > Generate FITS files with all proper headers and keyword identifiers, data structures, and formats – No calibration – Catalog data in Hubble Data Archive (HDA) with all necessary searchable keywords and indices – Cost benefit to project; eliminates development of redundant systems – Test images that specify image orientation for all modes prepared by IDT

Keyes - 5 Mar 2001 Slide 5 of 16 COS Team at STScI Tony KeyesGroup lead, Instrument scientist Melissa McGrathInstrument scientist (operations) Ralph BohlinInstrument scientist (calibration) Matt McMasterData Analyst - new team member Marsha AllenSystems engineer (operations; commanding) Dean ZakSystems engineer (operations; commanding) Ron HenrySystems engineer (operations) Tom WheelerEngineer (operations) Phil HodgeScience software – calcos (calibration) John AdamsTRANS developer – (scheduling)

Keyes - 5 Mar 2001 Slide 6 of 16 COS Exposure Type Summary

Keyes - 5 Mar 2001 Slide 7 of 16 COS Data Format  2-d data: FITS files containing imsets consisting of “science, error, and data quality” images  1-d data and TIME-TAG lists: FITS tables containing fluxes, wavelengths, errors, quality, positions, and other related quantities  Separate files for FUV “A” and “B” detector segments – All associated data (e.g., wavecals, FP-SPLIT components, REPEATOBS components, STIMs) use separate files (unlike STIS)

Keyes - 5 Mar 2001 Slide 8 of 16 Tentative Data File Naming Conventions   Product Suffix Type Contents     Uncalibrated _rawX image Raw counts image   _rtgX table Raw TIME-TAG event list   _asn table Association file   _trl table Trailer file (input)   _jit table   _jif image   _phaX table Pulse-height (FUV ACCUM only)   _rs1X image Stim-pulse 1 (FUV ACCUM only)   _rs2X image Stim-pulse 2 (FUV ACCUM only)   Where X = A, B, or M depending upon segment  

Keyes - 5 Mar 2001 Slide 9 of 16 Data File Naming Conventions (continued)   Product Suffix Type Contents    Calibrated _ctgX table Calibrated TIME-TAG event list   _fltX image Flat-fielded, corrected counts   _flsX image Summed flat-fielded corrected-counts   _x1d table 1-D extracted spectra   _x1s table Summed (combined) 1-D extracted spectra)   _cs1Y image Corrected stim-pulse 1 (FUV ACCUM only)   _cs2Y image Corrected stim-pulse 2 (FUV ACCUM only)   _trl table Trailer file (output)   _spt image Support file (header)   Wavecal exposures produce same calibrated files as science, except no flux calibration applied to the _x1* files (TBD). Dark and flat exposures produce no _x1* files. Acquisition exposures produce no calibrated products.   Where X = A, B, or M depending upon segment   Where Y = A, B depending upon segment

Keyes - 5 Mar 2001 Slide 10 of 16 COS Typical File Sizes

Keyes - 5 Mar 2001 Slide 11 of 16 COS Spectroscopic Mode Data Files   TIME-TAG produces each of the following for each FP-SPLIT=NO science and each wavecal exposure: – – a.) raw photon list (_rtg) per detector segment – – b.) corrected photon list (_ctg) per detector segment – – c.) “observed” count-rate detector image [not retained] per detector segment – – d.) corrected effective-count detector image (_flt) per detector segment – – e.) 1-d extracted spectrum (_x1d) combining all detector segments

Keyes - 5 Mar 2001 Slide 12 of 16 COS Spectroscopic Mode Data Files   TIME-TAG FP-SPLIT=YES exposures: each of the 4 individual component science exposures and all wavecals produce: – – a.) raw photon list (_rtg) per detector segment – – b.) corrected photon list (_ctg) per detector segment – – c.) “observed” count-rate detector image [not retained] per detector segment – – d.) corrected effective-count detector image (_flt) per detector segment – – e.) 1-d extracted spectrum (_x1d) combining all detector segments    and the following is also produced  – – f.) 1-d extracted spectrum summation of _x1d for all 4 individual exposures (_x1s) combining all detector segments   TIME-TAG and REPEATOBS combination is not allowed.

Keyes - 5 Mar 2001 Slide 13 of 16 STScI and the COS Science Team: Looking Ahead   What can we do to facilitate your COS science?   COS working proposal instructions – – > > Click on “Ground system requirements from integrated schedule” – – Current version > >   Astronomer Proposal Tools – – ETC: > > Requirements : June 2001 > > Testing : fall 2001 > > Public : January 2002

Keyes - 5 Mar 2001 Slide 14 of 16 STScI and the COS Science Team: Looking Ahead   RPS2 and PED   Handbook (review /suggestions?) – – Mini-handbook : May 2002 (cycle 12 CP) – – Instrument Handbook v. 1.0 : May 2003 (cycle 13 CP)   SMGT – – January 2003 > > Test suggestions > > Test data

Keyes - 5 Mar 2001 Slide 15 of 16 STScI and the COS Science Team: Looking Ahead   SMOV and ERO Activities Timeline – – L minus 18 months: set SMOV requirements (GSFC review) [May 2002] – – L minus 15 months: start activity planning – – L minus 10 months: SMOV activity summary (like Phase I) review – – L minus 8 months: high priority SMOV Phase II due (alignments, etc) – – L minus 6 months: moderate priority SMOV and ERO Phase II due – – L minus 2-3 months: GTO phase II due

Keyes - 5 Mar 2001 Slide 16 of 16 STScI and the COS Science Team: Looking Ahead   Early Release Observations – – Unique combination of new science and clear public impact > > Demonstrate science capabilities of COS to public audience Traditionally harder for spectrographs Now is the time to start consideration > > Work with STScI OPO ERO Scientist (currently A. Fruchter) and STScI COS instrument team > > Strong NASA HQ and HSTP involvement – – Orbits are in addition to GTO allocation – – e.g., ACS presently developing target list > > Must consider contingencies, SMOV timeline