UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
Date Instrument Systems ORNL SEQUOIA Overview Garrett Granroth (Instrument Scientist) David Vandergriff (Lead Engineer) ARCS/SEQUOIA IDT meeting March.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
MICE MICO September ‘07 Chris Nelson. Beamline and Hall Shielded area virtually complete –SW corner –Replacement West wall concrete ordered, corner pieces.
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee. N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
UCN Facility Working Group October 3, 2012 OverviewL.Lee MCNPX and ShieldingP.Carlson Beam MonitorsC.A.Davis / A.Konaka.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Director’s Review of August 2-3, 2007 CLASSE ERL Conventional Facilities Donald Bilderback Cornell High Energy Synchrotron Source, School of.
1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
VELO-installation meeting CERN, January 17, 2006
News and brief overview of Beamline plans for the next few months
Renovation of the 45-year old PS magnets
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Extract from today’s talk given to DCB
Far Experimental Hall Hutches Civil Construction
Experimental Areas – LS2 planning
The Bunker Project Overview Zvonko Lazic
Instruments Shielding Project Installation
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Bunker Project Schedule/Budget
Undulator Alignment Plan
CF Scope, Management & Organization
LCLS e- Beams Systems Manager
Polarized 3He target installation
Presentation transcript:

UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)

UCN 2014 Installation: Schedule 2 UCN 2014 Installation folded into Shutdown Schedule New schedule release today (SAS Committee) UCN SASP0184,185,186,187  Start: January 2 ; Finish: ~ April 10 Shield-Plug reconfiguration: starts in mid-March Work Requests (10) submitted; Not all approved yet. Lift Plan (Jason), Alignment Plan (Dave P.), Dose Analysis (Cam  RPG) CNSC Approval of Shield Plug (“in the mail”  “OK to proceed”  Anne/Jeff)

UCN 2014 Installation: Personnel 3.T-B/L (Beamlines) Installation/Alignment of B/L Components Consultation w/ TRIUMF Alignment Group (D.Preddy, B.Gasbarri, M.Vogel) D.Pearce hired on contract  direct UCN alignment efforts Hexagon Metrology Engineer (R.Molari) services contract  advisory  tracker specialist.T-Mech (Mechanical) General removal/assembly of components M.Goyette hired on contract T.Hessels (UCN Designer &.T-Mech)  ~ 50% (?) Require 1 more.T-Mech (TRIUMF)  50% Crane Crew At start of shutdown (Jan.2 – 17)  remove/excavate shielding blocks Intermittent (Jan.21 – Mar.26)  removal/placing of components Near end of shutdown (Mar.27 – Apr.10)  restoring shielding+plug Others Contractors: Plumbing (Lockerbie), Electrical (Entech), Coring (West Coast) Safety/RPG, Engineering (Civil, Electrical), Plant Group  Intermittent Diagnostics & Controls  1AM5 (best efforts)

UCN 2014 Installation: Alignment Plan 4 Alignment Plan & Logistics Plan being developed in consultation w/ Alignment group & D.Pearce Purchase Order for laser-tracker rental from Hexagon Metrology Alignment Plan Overview Fiducialize magnets, frames & other B/L components w/ Laser Tracker - Shoot array of points (upstream/downstream) on each component Shoot Vault & 1A monuments w/ Laser Tracker & establish coord. system Lay down grid of new monuments (Vault & 1A tunnel) & record - Number/Locations of new monuments (consult Bruno/Mike) Paint floor and/or lay down scribe lines Mark drill location (and angle) on Immovable-block for coring Install/Locate frames (Theodolite or Laser Tracker) Install/Align magnets/components according to schedule - Use Laser Tracker to position fiducialized points

Meson Hall Clean-up 5 M11 Cleanup Completed Staging area for new Shielding M13 Cleanup Completed Staging area for “removed” blocks Some blocks already moved to M13 Jason’s layout for temp. block storage “Boot-box” area for 1A access  M13 Cleanup above BL1A/1B Almost completed (thanks to Ron K.) 46 items removed; ~11 items left to move (this week & after beam OFF) Catalogue of items removed:  Extra Blocks (6’ and smaller)  stage to M13 “monolith”

Floor Plan (SW Meson Hall) Total number of items: 9 (zone A) + 13 (zone B) + 30 (zone C) = 52 Gateway (From Dec/2012) Cleanup above BL1A/1B

Floor Plan (SW Meson Hall) Total number of items: 9 (zone A) + 13 (zone B) + 30 (zone C) = 52 Gateway (From Dec/2012)

Floor Plan (SW Meson Hall) Total number of items: 1 (zone A) + 5 (zone B) + 3 (zone C) = 9 (43 objects cleared) Gateway (Dec/2013) Objects rem.

Floor Plan (SW Meson Hall) Total number of items: 1 (zone A) + 5 (zone B) + 3 (zone C) = “New items” Gateway (Dec/2013) Objects added N1 N3 N2 N4 N5

Floor Plan (SW Meson Hall) Total number of items: 1 (zone A) + 5 (zone B) + 3 (zone C) = “New items” Gateway (Dec/2013) Objects added (& removed) N1 N3 N2 N4 N5

Remaining items to move

To M11: To top of M9, M11, M20 blocks: Beamlines R/H UCN To Storage “Barn”: Beamlines Remaining items to move this week Detector Group

To Vault Roof: T2K/Snolab BeamlinesPIENU Outside M11: EWB/Beamlines Remaining items to move after beam OFF

FINIS

.T-Mech