Ganda ERP Project | CFC ERP Project bi-weekly meeting (28/03/2014)

Slides:



Advertisements
Similar presentations
Module 3: Business Information Systems
Advertisements

Credit Card Option Announcement March 21, Exciting News! As of April 2, 2008 homeowners will be able to use Credit Cards with the current Version.
Presenter Muhammad Tarek Madwar Owner And System Architect
09/04/2015Unit 2 (b) Back-Office processes Unit 2 Assessment Criteria (b) 10 marks.
University of Missouri System PeopleSoft Financials Reporting for Today and Tomorrow.
 Corporate Profile  BOSS Overview  Current Solutions  BOSS Modules  COLORS - New BOSS Web Module  BOSS Benefits  Supplier XML Services and BOSS.
EJob Management Andy Barton
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Ganda ERP System Cost Calculation Training for Dual Line and Dual Currency Digiwin Group Ted Su 13-June-2014.
UR Financials Project Company Level Reporting SIG March 18, 2014.
Hyperion EPM Overview & Case Study.
Massachusetts Institute of Technology
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
Oracle General Ledger, Financial Reporting and Data Warehouse 6/22/2015 RIAS PHASE II Overview.
Integration of Applications MIS3502: Application Integration and Evaluation Paul Weinberg Adapted from material by Arnold Kurtz, David.
GPS Tracking & Inventory Management GPS Tracking & Inventory Management Presented by: Product Activation Group.
Introduction to SAP R/3.
Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012 Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
ERP Raghunath M D BSNL Mobile Services, Ernakulam, Ph:
1 CADE Finance and HR Reports Administrative Staff Leadership Conference Presenter: Mary Jo Kuffner, Assistant Director Administration.
Welcome to the Learning Community 2015 Roll out webinar Hosted by the Family Institute for Education, Practice & Research The webinar will begin shortly.
Ganda ERP Project | ERP Project Status Report for CFC June 2014.
1 FY14 BDS Information Meeting March 26, Our Website Our website location has changed! So, if you have it bookmarked, please make note of the.
Current Progress and Achievements
ERP Project Update September 2013
GroundsOpsStaff (Last Updated 9/9/2010) A Grounds Operations and Staffing Computer Application Based on APPA Operational Guidelines for Grounds Management.
Elliott eOrders.Net Edward M. Kwang, President Rachel R. Locklair, Project Lead.
Ganda ERP Project | 0 ERP Project Stage Review 12 July 2013.
1 Team Leader TKS Job Aid. 2 Viewing the On-line Presentation If you are viewing this presentation via Internet Explorer for best results resize the “Notes”
12/02/04www.cis.ksu.edu/~meiyappa Enterprise Resource Planning Meiyappan Thandayuthapani CIS 764.
eOrders inventory ordering software! Introduction Use easy functions, letting you order products that you need automatically. Use easy functions, letting.
For Users : Username & Password for logging in to system : CME proposal to be added in system For System Configuration : Initial budget or latest updated.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
1 MONTHLY REPORT MARCH, HR & GA & Legal dept. -
1 Footnote SOURCE: Source | ERP Project Update Report # 1 – June 2013.
Current Progress and Achievements
Ganda ERP Project | 0 CFC ERP Cut-off Strategy & Go-Live Preparation 1 June 2015.
Ganda ERP Project | ERP Project Status Report for CFC Oct 2014.
Ganda ERP Project | 0 CFC ERP Parallel Test Preparation 12 June 2014.
Ganda ERP Project | CFC ERP Project bi-weekly meeting (30/05/2014)
© ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011.
Ganda ERP Project | ERP Solution Report for CFC Mar 2014.
Ganda ERP Project | 0 CFC ERP Cut-off Strategy 31 December 2014.
Ganda ERP Project | ERP Project Status Report for CFC Dec
ERP Project Update JAN, | Ganda ERP Project | 0.
Ganda ERP Project | ERP Project Status Report for CFC Apr 2014.
Ganda ERP Project | CFC ERP Project bi-weekly meeting (21/04/2014)
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
Training Day 5 Customer Order Processing Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
Sales Module Study & Recommendations. Study Coverage Surabaya S&D operation Dispatches from Gudang Branches Stock Transfer to Jakarta Exports Taxation.
SCG PAPER: SAP By: Panidda P./ Narinthip W./ Pabhabwich S.
Implementing Multicurrency in an Existing Dynamics GP Environment Rod O’Connor 20-NOV-2014.
Contact us: Call: Mail: Visit:
Business and Systems Aligned. Business Empowered. TM Global ERP Projects Author:Andrew McCumiskey Presentation for:University of Birmingham Course: Commercial.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
 Is it a struggle to keep on top of program or donor information?  Are you wasting postage and effort mailing to your entire list rather than tailoring.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
EnergySTEP1 Data Center Assessment: After the Sale How to Present the Customer Report How to Follow up on Sales Opportunities.
 TATA CONSULTANCY SERVICES MM - Inventory management.
ClinCard System: Medical University of South Carolina
Planning for Profit and Cost Control
Purge-it! USP's, pre-sales process & helping the customer to decide
“All About Me” Staff Development Day
Attendance Management software
Driving Successful Projects
Presentation transcript:

Ganda ERP Project | CFC ERP Project bi-weekly meeting (28/03/2014)

Ganda ERP Project | Nov-2013Dec-2013Jan-2014Feb-2014Mar-2014Apr-2014May-2014June-2014July-2014Aug-2014 Purchasing Inventory Sales Distribution / FG Warehouse Production Maintenance Finance & Accounting Human Resouce Customization  Basic Data upload  Test / Simulation  End User Training Parallel Test Run GO - LIVEGO - LIVE ERP Go Live The Schedule to Go-Live for CFC ERP Go Live Simulation Testing 10% (15-Apr) Simulation Testing 50% (12-May) 1

Ganda ERP Project | CFC Operation Simulation Test 2 Operation Simulation Test Scope on Apr-2014 Modules : Purchasing, Inventory, Sales & B2B, Distribution & Warehouse, Production, Finance & Accounting, SMS Locations : TKP & HPGP two plants ( MPLS can be finished on 12/4 ) Testing Data Volume : 5% ~ 10% of daily transactions Major Target : (1) Ensure ERP Major process can running well and do some fine turning (2) Let user have more real practice chance Remark & Notes Maintain, Elec. Power, QC Report, Customization Reports & HRM modules can be put on 2 nd round Operation Simulation Test (May-2014) The Other CFC Branch Offices can be include in 2 nd round Simulation Test Testing Data Volume can be enlarge to 50% ~ 100% of daily operation in 2 nd round Simulation Test.

Ganda ERP Project | 3 CFC KM/KU Examination Sales & B2B & F/G & Logistic Materials: Sent: Mon 24/03/2014 5:59 PM Participate: Marketing + G/A + F/G + Logistic Schedule: ??? Purchasing Materials: Sent: Wed 26/03/2014 7:25 AM Participate: Purchasing + G/A + W/H Schedule: ??? Financial & Accounting Materials: Sent: Wed 26/03/2014 7:42 AM Participate: Financial + Accounting Schedule: ??? Inventory Materials: Sent: Thu 27/03/ :30 PM Participate: Warehouse + G/A Schedule: ???

Ganda ERP Project | Progress update Finance & Accounting Progress Update Next Plan Sales & F/G & Logistic Module / Function 4 1.Digiwin Project Team have provided a new solution for CFC Dual Currency 2.Regarding to how many Operation Center (DB) should be configured in CFC ERP system. Due to the VAT output 1.Overall conclusion, CFC agree to adopt two operation database for dual currency, but need to provide reliable program to make two account consist, but because it’s possible to have some adjust, so accounting department need to manually contra two account. 2. For the overall consideration except Financial Accounting, already final to separate two Operation Database CFC-TKP ; CFC-HPGP Due to CFC daily logistic operation process requirement, the “Delivery Target Setting” function on have to put on Phase-I Only make one report that F/G need (Loading Report of Zone). B2B interface should have Vietnamese ( MIS will try to replace Simplify Chinese to Vietnamese ) B2B date time format should be change to dd/mm/yyyy. ( Done ) AreaDatabase nameBranches North, Central VNCFC-TKPTK, HP, HN, DN South VNCFC-HPGPHCM, HPGP

Ganda ERP Project | Progress update Branch Warehouse Progress Update Next action Plan Module / Function Production 5 Distribution / Logistic Due to CFC user still have no chance to see the full distribution operation flow demonstration on CFC ERP (DO  DS  LN  LC  DN), so users are worry about those function really can run or not. Sales and Delivery Module Simulation Demonstration (March-17) and material please referance “CFC Sales Function Demo v1.docx”“CFC Sales Function Demo v1.docx” Due to branch office warehouse size not big as TK plant, and transaction not so many like factory, so maybe can have easier process for delivery Since outside warehouse process usually done by branch office logistic, it’s not real time operation, so to maintain program and process consistency, still follow standard deliver process same as TK plant. Due to CFC user still have no chance to see the full operation flow demonstration on CFC ERP (Quarry  RM  Kiln  CM  Packing ), so users are worry about those function really can run or not. We would like to invite Digiwin also provide a whole production operation flow demonstration when MFG consultant next coming trip. ( Apr ???)

Ganda ERP Project | Progress update Cost Accounting Progress Update Next action Plan Budget Module / Function 6 TIPTOP ERP Budget Functions are designed in GL Module, the main focus of TIPTOP Budget function are Budget Data Setting, Actual/Budget Comparison and Purchasing Budget Control. There are not supporting function for Budget Planning and Budget Simulation on standard TIPTOP Package. Mr. Ted Reply Tue 18/03/ :37 AM Regarding to CFC Budgeting Function requirement, I will suggest CFC to keep using current manual process (due to there is no times and no budget to deal with it in this project) and let us focusing on CFC ERP Go-live activities first, because of there are still lots of thing need both of our teams to do and to ensure we can achieve the target. Currently customization when packing process finished, the stock in Item No. is merged both Line 1 and Line 2 cement. CFC request when finished packing, stock-in finish goods item no should still separated into Line 1 and Line 2. And required one more process to merge the Line 1 and Line 2 into the merged item No. Digiwin explain that, because of this additional level process is a visual process so means need to auto generate related transaction from system, this will cause additional customization 88 hours not existing in the confirmed customization scope. So they need extra charge for this.

Ganda ERP Project | Progress update Progress Update Next action Plan Module / Function 7 Customization Reports Digiwin will provide the RPT Specs to CFC for confirmation on Mar-2014 QUA+KILN+WH+DN All of Customization Reports will be delivery before 30-May Purchasing SMS The SMS Module customizations are CFC Phase-I Must-Have functions, Digiwin will provide the progress to CFC continually.. Mr. Ted provided the spec. on Sat 15/03/ :27 AM MIS need to confirm with consultant for more details. Due to CFC process control requirement, the “weight-scale & belt- scale integration function” on GR (Good Receiving) have to put on Phase-I (01-July-2014 Go-Live Must- Have function) 1. Before 28/3 related dept. need to input the new Item-No. & Vendor code to the LiGu basic data by excel file and reply to MIS Mr. Tuan. 2. Before 31/3 MIS Mr. Tuan will reset all the LiGu Basic data based on the excel file. And lock the user rights for input the new data to LiGu system. 3. Purchasing Dept. Mr. Hung will design the application form for the new Item-No. and vendor code. Before the end of March. Due to LiGu Database Structure can not fulfill with our existing Coding. So we proposed asks LiGu upgrade: 1.Open DB for Basic Data 2.Add LN No + BARGE ID 3.Windows 7 Version 4.Transaction export by each trip

Ganda ERP Project | Progress update Equipment Maintain Progress Update Next action Plan Module / Function 8 Electric Power Q.C Reports Due to Maintain Module is a whole new customization module, Digiwin Project Team plan to provide Maintain Module Training and collect the gaps between delivered functions and CFC requirements on Apr /03/2014 For the Basic Data, Mr. Thanh suggest to use real case: One desktop computer found shutdown / overheated and suspected need to check or replace CPU or CPU fan, what is basic data we need to provide into TIPTOP system so as let thing done. Mr. Nick have explain the basic data on 19/3 Digiwin will deliver those customization function progressively from May Digiwin will deliver those customization function progressively from May-2014 Spec. confirmed on Wed 19/02/2014 3:23 PM Waiting for the Customization training Spec. confirmed on Mon 10/03/ :40 AM Waiting for the Customization training Basic data done in 28/3/2014

Ganda ERP Project | Progress update Progress Update Next action Plan Module / Function 9 HR & ESS Mr. Andrew sent on Fri 21/03/ :06 PM 1. Provide the spec of P/S Bonus 2. Provide the spec of Daily shift arrangement. 3. Provide the spec of reports. 4. Testing the salary formula. 1. Finished the spec of Annual leave parameters and Annual Leave Planning. 2. We classified the class of report, please help us to confirm it. 3. Seniority Subsidize had tested in HRM system and It can be calculate from Payroll Management 4. We had confirmed the details of P/S bonus again. 5. We can use the basic function of overtime parameters, so there's no need to customize the OT parameters. I had tested in HRM system, and it work to fulfill the requirement from CFC, but we still have to customize in Offset leave Setting. 6. Confirm the Vietnam's social Insurances, medical insurance, jobless insurance and personal income tax details

Ganda ERP Project | 10 HPGP & Branch Office Inquire for VDC / FPT / VIETTEL 4/03/2014 Alex sent Acceptance Test Condition for vendor. Viettel Demonstration 25/03/ :00 MIS based on the instruction of Viettel and already make ERP server combine with our existing LAN on 25/03/2014. We will sign the testing contract before 12/4/2014. TKP with HPGP Progress update Progress Update Next action Plan Module / Function Need to make sure the sub- mask will not Interfere with TKP & HPGP

Ganda ERP Project | Customization Report Spec. confirm ( Mr. Nick providing for us to confirm via and should be finished before 28/3 ) -> CFC RPTs Spec Release Schedule (52 RPTs) : 28/3 : 25 RPTs ; 5/4 : 10 RPTs; 11/4 : 8 RPTs ; 18/4 : 5 RPTs ; 25/4 : 4 RPTs 2. CFC Internal bi-weekly meeting 28/3 ( review all the progress and outstanding issues ) 3. PRD + PUR + Maintain + ELEC + QC Customization Training ( Suggest for Mr. Nick come to CFC 31/3 ~ 4/4 ) -> Due to schedule conflict, Mr. Nick can not come to CFC 31/3 ~ 4/4 ; Mr. Nick will plan to delivery PRD + PUR customization training on the next trip (7/4 ~ 18/4) Mr. Nick will try to put Maintain Module training on the next trip if the schedule is not fully assigned (7/4 ~ 18/4) ELEC + QC Customization training will be postpone to May Key User Training ( Suggest for Mr. Nick + Ms. Iris come to CFC and starting from 7/4 ~ 18/4, We all asks related dept. KM/KU overtime on 9/4 ) -> Confirmed ! (I will provide detail daily activities and air-ticket itinerary to CFC before 28/3) 5. CFC Internal bi-weekly meeting 11/4 ( review all the progress and outstanding issues + Key User training evaluation ) 6. Whole Module Simulation Testing 5 ~ 10% real data ( Starting from 15/4 ) -> Confirmed ! 7. Invited Mr. Ted come for the ERP monthly reporting. ( Suggest 23/4 ~ 24/4 ) -> Ted have schedule on 22/4 at Taiwan, So ted will flight-to HAN on 23/4 and start meeting on 23/4 afternoon ! 8. CFC Internal bi-weekly meeting 25/4 ( review all the progress and outstanding issues ) Major Activities on Apr-2014

Ganda ERP Project | Dear Mr. Ryan Sent: Wed 26/03/2014 7:30 PM Thanks for your reminding. I will update to our bi-weekly meeting. 1. For simulate 100% transaction data is the target goal of Mr. Chinh F/G dept. and very difficult to reach. And for the open balance in the end of June, not only for F/G also have a lot of W/H we need to know the physical inventory ending balance. ( Accounting dept. also worry about how to cut off the outstanding data and switch to ERP ) 2. If Digiwin need to discuss the extra contract, we need Digiwin provide us the compare table first, for we can know the detailed of the time allocate. 3. B2B date format already done. We will try to use the Simplify Chinese replace to Vietnamese based on your instruction. Thanks with Best Regards, Dear Mr. Alex Some remind from me as below: 1. If you can simulate 100% transaction, so means in June already have all transaction and don’t need to do open balance in end of June, open balance strategy would be different. 2. Today discuss with our Top management, about extra charge things is there any possibility we make additional contract (consider all possibility at least this year), not just 88 hrs? 3. About B2B web site, date format Mr. Sean will check it, Vietnamese language part now system can have multi-lingual setting, but because now system only have 3 language(0. Traditional Chinese 01. Simply Chinese 2. English), maybe you can try to put Vietnamese description in Simplify Chinese part (program ID: p_weblang). 12