Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ganda ERP Project | 0 ERP Project Stage Review 12 July 2013.

Similar presentations


Presentation on theme: "Ganda ERP Project | 0 ERP Project Stage Review 12 July 2013."— Presentation transcript:

1 Ganda ERP Project | 0 ERP Project Stage Review 12 July 2013

2 Ganda ERP Project | Agenda Project Proceed Situation Summary Overall Situation Process Fitness Outstanding Employee Confirmed and Unconfirmed Issue Project Next Phase Q&A 1

3 Ganda ERP Project | Planning 1. Signing contract 2. Hardware purchase 3. System Instalation 4. Form Project Team 5. Kick Off AugSep Dec Oct Nov Feb Jan 23 May, Contract Signing 1 July, Kick Off May Jun Jul Action 1. System Go-live 2. Monthly Review Meeting 3. Setlement of account 4. Go-live support Do / Implementing 1. Survey & Diagnosis 2. Application Training 3. Operation Training 4. S.O.P. Modeling 5. Gap Analysis & Customization 6. HRM Application Training /Gap Analysis Check 1. Basic Data Preparation 2. Process Online Simulation 3. Balance of data migration Phase 2 Go-Live Mar May Apr ERP Project Milestone(Time & Cost) Phase 1 - Project Implementation 6 months Finance & Acc; Supply Chain, Sales, Manufacturing, HRM Phase 2 - Project Implementation 6 months GPS/PLC Integration; B2B; BI, Easyflow and other customized programs 1. S&D completed (week 2 July) 2. Application training done (week 2 August) 3. Operational training done (week 4 Sep)4. SOP Modeling completed (week 1 Oct) 5. Gap Anls & Custm completed (week 3 oct) 1. Basic Data prep done (week 2 Oct)2. Online Simylation done (week 4 Nov)3. Data migration completed (week 4 Dec) Phase 1 Go Live 2 6. HRM Training & Gap Analysis completed (week 5 oct) Finished Next Stage

4 Ganda ERP Project | Overall Situation 3 All department very coordinate, And attend meeting on time. Maybe not every KU can fully understand English, during the meeting usually just manager level(or higher) will speak. Base on the implementation strategy made before contract, we basically follow CFC’s process, after survey we estimate maybe logic of process will just slightly revise in CFC, but the operation will be a considerable change.(because many process not in system now, and each modules not fully integrate) Briefly compare CFC and Indonesia process, most part can be over 80% similar in the future, except Sales and Distribution because different business model and market competition.

5 Ganda ERP Project | Process Fitness 4

6 Ganda ERP Project | Gaps of Mfg. Module Interview Packing System CMMS All Transaction need Dual Currency(only in CFC) Dual Currency Production Cost Production Cost need to separate into two lines Freight Calculation PLC Automation/Production Daily Report

7 Ganda ERP Project | Gaps of Financial Module Interview Tax Issue:  Valued-Added-Tax Declaration. Financial Accounting Issue:  Dual Currency Report in Fixed Asset Module.

8 Ganda ERP Project | Outstanding Employee 7 Brilliant adviser Account: Ms. Thanh Huong F/G: Mr. Chinh Good Experience and Detail Control Packing: Mr. Thanh Production: Mr. Hai Experienced worker W/H: Mr. Viet Purchase: Mr. Hung, Ms. Mai Logistic: Mr. Phuong

9 Ganda ERP Project | Confirmed Issue(1) 8 Item Category will basically remain the same, but re-organized category not use, and extend on digit can include G.A category. Item Code Rule basically not change, but need to delete duplicate Item Code. Basic Data Center need to be establish, but separate in CFC and Indonesia.(Including Item, Cus No, Supplier No., COA..) Customer Master Data still allow every branch create independently, but have limited employee can create.  should have data center Currently domestic sales and export sales process different, in the future should be unify into one.

10 Ganda ERP Project | Confirmed Issue(2) 9 Sales Contract will be input in the system for S/O information control. Credit Limit Control should be done by system in the future. Stock of F/G should be include in the system. Branch office W/H and stock control should be include in the system. Because TIPTOP system use same function to deal all kind of purchase require, we’ll combine PR/PP into one process. Purchase Contract will use attach file and/or footnote in the system.

11 Ganda ERP Project | Confirmed Issue(3) 10 Supplier Master Data should be centralize control by one department, can’t allow many department create. Purchase request department should responsible to choose right purchase category and clear request item in the future. P/R should separate by purchase category and request, but can include many items in one P/R. Good Receive windows will be limited in W/H and G/A, other department can’t receive good directly. Some quantity un-precisely item should setup tolerance percentage in the system.

12 Ganda ERP Project | Confirmed Issue(4) 11 Free sample should use standard function stock-in with normal goods in same Good Receive. Arrive date is a important column in system, buyer should maintain correct date and offer Predict Good Receive List before goods arrive. Do MPS/MRP module training in Application Training. Stock in Quarry side should include in system(exploded limestone, explosive…). In phase one production related department still provide daily report to W/H input stock transaction.

13 Ganda ERP Project | Confirmed Issue(5) 12 All department using repairing note and W/O, should unify there process and make all expense, FA, stock control can link together(including Electrical, Mechanical, Quarry and Project Engineering). Bag Cement will apply Lot No. control in system.

14 Ganda ERP Project | Unconfirmed Issue 13 L/B is not used by any department(only accounting), need to be sure it’s need to be preserved in TO-BE process? Import/Export document done by Purchase department, could be move to Logistic department? Basic Data Center need to be establish, but separate in CFC and Indonesia.(Including Item, Cus No, Supplier No., COA..) Could buyer categorized by item category and use it as default buyer in system? Does IQC result can put into system?  Not necessary In the plan SMS System is second phase, is that OK?  NO

15 Ganda ERP Project | Unfinished Job 14 Item Code cleaning(eliminate duplicate Item). W/H Design should have first version, it can be test in the proceeding process. Credit Limit Control Process. Stock Control Policy Should be link with system process(will be done in application training). Need to be have a very clear principle of Purchase Transaction base on category(Stock, Expense, FA..), and publish to all users after final(will be done in application training).

16 Ganda ERP Project | 15 Next Step

17 Ganda ERP Project | 16 Next Step

18 Ganda ERP Project | Q & A 17


Download ppt "Ganda ERP Project | 0 ERP Project Stage Review 12 July 2013."

Similar presentations


Ads by Google